flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | Sep 22, 2021

Cities need to step up flood mitigation efforts to save lives

Recent storms highlight climate change dangers.

Codes and Standards | Sep 21, 2021

Steps to improve ventilation for Covid can combat colds and flu

New look at airborne disease spread shows time viruses linger in air may have been underestimated.

Codes and Standards | Sep 15, 2021

USGBC will change leaders, conduct strategic review

Aims to ensure organization is ‘well positioned to scale its work in the post-pandemic world’.

Codes and Standards | Sep 15, 2021

LEED-certified offices earn higher rents than non-sustainable properties

Are also more resilient to dips in real estate market.

Codes and Standards | Sep 7, 2021

Boston turns to developer fees to fund flood protection infrastructure

Assessments on commercial properties will help build seawall and other protective measures.

Codes and Standards | Sep 3, 2021

Low-cost methods can have substantial impact on reducing embodied carbon

Whole-building design, material substitution, and specification strategies can slash carbon by up to 46%.

Codes and Standards | Sep 2, 2021

Case for power resiliency in buildings grows with more disaster and outages

Essential businesses like data centers, hospitals are first adopters of new storage systems.

Codes and Standards | Aug 31, 2021

UK industry group wants mandatory whole-life carbon assessments of buildings

Aims to address hidden emissions embedded in supply chains.

Codes and Standards | Aug 31, 2021

Home electrification will require code upgrades

Residential electric panel capacity must be increased.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021