flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | Apr 8, 2021

Sensors used in tunable lighting systems found to have high reliability

DOE study investigated items used to control lumen depreciation, chromaticity shifts, and changes in drivers.

Codes and Standards | Apr 7, 2021

Red tape ruined the U.K.’s home retrofit program

Lessons learned could help US avoid that fate.

Codes and Standards | Apr 6, 2021

Lendlease achieves net-zero carbon in Boston, Chicago multifamily portfolio

New projects in New York, Los Angeles on track to reach goal.

Codes and Standards | Apr 5, 2021

Specification for sliding door, lift and slide roller assemblies updated

Addresses market trend toward heavy sliding doors.

Codes and Standards | Apr 5, 2021

Construction employment rebounds in March following February drop

Rising costs, supply-chain woes, and cancellations threaten outlook.

Codes and Standards | Apr 2, 2021

Intl. Code Council’s new development system could be a brake on building decarbonization

Local governments lose influence on creating new energy efficiency rules.

Codes and Standards | Apr 1, 2021

Cuomo proposes strengthened NY building codes to boost efficiency

Would apply to appliance, equipment efficiency and reduce water use.

Codes and Standards | Mar 25, 2021

N.C.’s Outer Banks’ communities struggle for ways to keep the sea from overrunning them

Tax hikes for beach replenishment offer temporary solution.

Codes and Standards | Mar 23, 2021

The 15-minute city may not work in much of North America

Segregated neighborhoods and car-centric cities may not adapt to the European model.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021