flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | Jan 27, 2021

AECOM sues insurance carrier for payment of COVID-19 property damage claims

Claims ‘all-risk policies’ should have included millions of dollars of losses due to virus.

Codes and Standards | Jan 26, 2021

Updated guide to repair and rehabilitate existing concrete structures published

Document assesses how to adhere to code requirements.

Codes and Standards | Jan 25, 2021

New guide for skylight selection, daylighting design released

Free Fenestration and Glazing Industry Alliance document now available.

Codes and Standards | Jan 20, 2021

Steel industry, labor urge Biden to retain steel tariffs

‘Essential to ensuring the viability of the domestic steel industry.’

Codes and Standards | Jan 19, 2021

2021 Solar Investment Tax Credit will remain at 26%

Incentive was scheduled to be reduced to 22%.

Codes and Standards | Jan 19, 2021

Thomas Jefferson University launches the Institute for Smart and Healthy Cities

Will address climate change, social equity, rapid urbanization, and health.

Codes and Standards | Jan 14, 2021

Petition urges FEMA to update flood maps, set tougher standards for floodplain construction

Environmental and planning groups note soaring claims, flood insurance debt.

Codes and Standards | Jan 13, 2021

Proposed change to IECC process irks efficiency advocates

New procedure would diminish influence of local code officials.

Codes and Standards | Jan 12, 2021

Two net-zero hotel projects could portend a new hospitality trend

Energy-intensive sector comprises 10% of all commercial real estate.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021