flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | Sep 21, 2020

No ease of lumber price spikes in sight

Wildfires strike Northwest timber industry in wake of Covid-19 shutdowns.

Codes and Standards | Sep 17, 2020

Spate of energy code appeals could hamper efficiency progress

Construction and fossil fuel interests oppose portions of latest model energy code.

Codes and Standards | Sep 16, 2020

Heat pumps are the future for hot water

Sustainability policies will drive trend.

Codes and Standards | Sep 15, 2020

Taller timber buildings approved in National Fire Protection Association code

Ensures compatibility with the International Building Code.

Codes and Standards | Sep 14, 2020

Relocation of neighborhoods, the next step in U.S. flood strategy, is underway

Repeated rebuilding after successive floods now seen as bad policy.

Codes and Standards | Sep 10, 2020

Fannie Mae programs provide incentives for multifamily solar

Affordable housing projects can find PV installations to be cost-effective.

Codes and Standards | Sep 9, 2020

Corporate pledges accelerate net-zero building movement

World Green Building Council drives goal of net-zero carbon emissions by 2050.

Codes and Standards | Sep 8, 2020

Study will examine elevator airflow amid COVID-19 pandemic

Researchers to investigate risk of airborne transmission.

Codes and Standards | Sep 4, 2020

Updated selection, application guide for plastic glazed skylights, sloped glazing released

Part of suite of skylight documents by Fenestration and Glazing Industry Alliance.

Codes and Standards | Sep 3, 2020

Turner Construction takes strong stand against racism

Shuts down work sites for anti-bias training.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021