flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | Oct 7, 2019

Tailgating remains a critical building security threat, say security professionals

Few buildings provide beefed up provisions to counteract threat.

Codes and Standards | Sep 27, 2019

Open source tool allows comparison of embodied carbon emissions from construction materials

Enables carbon-smart choices during material specification and procurement.

Codes and Standards | Sep 27, 2019

AIA declaration: Climate change requires ‘holistic approach’

Must address interdependencies among people, buildings, infrastructure, and the environment.

Codes and Standards | Sep 26, 2019

San Jose’s new building energy code is the most stringent among large cities

New regulations aim to make zero-emission electric buildings the norm.

Codes and Standards | Sep 26, 2019

Building support for climate action depends on linking it to health, economic benefits

USGBC report finds most people don’t think environmental problems significant enough to prioritize action.

Codes and Standards | Sep 20, 2019

OSHA has a new chief for its construction directorate

Former Army medical staffer Scott Ketcham has extensive OSHA experience.

Codes and Standards | Sep 20, 2019

American Wood Council updates free Connection Calculator

Tool includes cross-laminated timber connection provisions and post-frame ring shank nails.

Codes and Standards | Sep 19, 2019

Virtual reconnaissance of Bahamas finds some structures performed well during Dorian

Amid devastation, lives likely saved by resilient buildings.

Codes and Standards | Sep 19, 2019

Obama-era Waters of the U.S. rule revoked

New rule expected to define protected waterways more narrowly.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021