flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | Jun 10, 2019

Intl. Code Council releases Natural Disaster Preparedness Guide

Provides tips for staying safe during and after a hurricane or severe weather.

Codes and Standards | Jun 7, 2019

Market conditions indicate slower growth in industrial real estate sector

E-commerce, market oversupply, rising interest rates to dampen hot market.

Codes and Standards | Jun 3, 2019

Haskell invests in BLOX, creator of modular-based delivery method

‘Represents important part of Haskell’s future strategy,’ says CEO.

Codes and Standards | May 31, 2019

RELi 2.0 standard for sustainability, resilience being piloted

Will be open to LEED-registered or -certified projects, with introductory pricing and support.

Codes and Standards | May 24, 2019

USGBC receives funding for LEED for Cities and Communities Program

Bank of America provides $500,000 grant to certify 15 U.S. cities.

Codes and Standards | May 24, 2019

AIA updates Interiors Contract Documents

Six revised documents available for interior construction projects.

Codes and Standards | May 23, 2019

Northern California casino offers a template for resilient microgrids

Solar power with batteries and backup generators provide weeks of self-reliance.

Codes and Standards | May 23, 2019

Austin creates innovative plan to boost affordable housing

Approach includes loosened zoning, incentives for higher density in lower-cost and mixed-income developments.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021