Rivers are often times the more utilitarian of the different types of bodies of water. Oceans and lakes are thought of as fun places to partake in water sports, go for a swim, or just relax on their sandy beaches, and ponds are seen as serene and relaxing spots to go fishing or to sit back and enjoy the wildlife. Meanwhile, rivers are often viewed as the highways of the water world; they are connectors and pathways to something bigger and better. Boats and barges travel up and down them as they make their way to or from an ocean or lake leading to heavy traffic and plenty of pollution.
Sure, maybe we walk along riverwalks or enjoy lunch on an outdoor patio where the rushing water can be heard, but, thanks to the heavy water traffic and pollution, rivers are often only enjoyed as ambiance, not as a place to actually take a dip and cool down on a hot summer day.
Some cities, however, are trying to return these heavily polluted and trafficked rivers back into swimmable destinations for the enjoyment of locals and visitors alike. New York has a proposed floating pool for one of its rivers and river pools already exist in cities like Zurich, Berlin, and Paris, and now, the Yarra River in Melbourne, Australia is looking to join this list.
According to inhabitat.com, the non-profit organization Yarra Swim Co. is looking to make the heavily polluted Yarra River swimmable once more. One of the first major steps they are taking to achieve this goal is to work with Arup to develop a Yarra River pool. While, technically, swimming in the pool wouldn’t be the same thing as swimming in the Yarra, it would be the first step in bringing swimming back to the waterway.
The plans call for a self-contained pool that floats in the Yarra River, however, Arup and Yarra Swim Co. are looking into ways to filter and clean the surrounding water so that it can be used to supply the water in the pool, which is kind of like swimming in the river itself, right? Currently, Arup says there is a patent pending for this type of technology.
Yarra Swim Co. hopes the pool will help to change public opinion about the polluted waterway and be the push needed to rally people around the idea of cleaning the river for good. Ultimately, Yarra Swim Co. hopes the river can be cleaned thoroughly enough so the race to Prince's Bridge, which was once one of the largest swimming competitions in the world, can once again be held.
Funds to build the pool, which, in Australian dollars would cost around $6 and $8 million, may be raised through a combination of crowdfunding, sponsorships, and grants. If all goes according to plan, the pool could be open to the public by 2019 or 2020.
So while people may not be swimming in the Yarra anytime in the near future (at least, not without imbibing in a few rounds of liquid courage first), the pool, especially if the patent pending technology works, could be the first step in the overall process of making the Yarra River swimmable once again.
Photo Credit: Daderot, Wikimedia Commons
Related Stories
| Aug 26, 2013
Chicago Bears kick off season at renovated Halas Hall
An upgraded locker room, expanded weight room, and updated dining room with an outdoor patio greeted the Chicago Bears when they arrived at Halas Hall for practice this month. The improvements are part of a major expansion and renovation of the Bears’ headquarters in Lake Forest, Ill., completed by Mortenson Construction in less than seven months.
| Aug 22, 2013
Sports Facility Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest sports facility design and construction firms, as reported in the 2013 Giants 300 Report.
| Aug 22, 2013
Energy-efficient glazing technology [AIA Course]
This course discuses the latest technological advances in glazing, which make possible ever more efficient enclosures with ever greater glazed area.
| Aug 20, 2013
First look: $550 million Billie Jean King National Tennis Center renovation
The United States Tennis Association has announced its plans for a sweeping transformation of the USTABillie Jean King National Tennis Center that will include the construction of two new stadiums, as well as a retractable roof over Arthur Ashe Stadium. The transformation will be implemented in three phases to begin at the conclusion of the 2013 US Open, with the goal of overall completion by the 2018 US Open.
| Aug 14, 2013
Green Building Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest green design and construction firms.
| Aug 13, 2013
USGBC joins forces with Green Sports Alliance to promote sustainable venues
The U.S. Green Building Council (USGBC) has announced a collaboration with the Green Sports Alliance, a prominent nonprofit organization supporting the development and promotion of green building initiatives in professional and collegiate sports.
| Jul 29, 2013
2013 Giants 300 Report
The editors of Building Design+Construction magazine present the findings of the annual Giants 300 Report, which ranks the leading firms in the AEC industry.
| Jul 19, 2013
Renovation, adaptive reuse stay strong, providing fertile ground for growth [2013 Giants 300 Report]
Increasingly, owners recognize that existing buildings represent a considerable resource in embodied energy, which can often be leveraged for lower front-end costs and a faster turnaround than new construction.
| Jul 3, 2013
World's biggest freestanding building opens in China
Measuring a stout 100 meters high, 500 meters long, and 400 meters wide, the New Century Global Centre in the Tianfu New District of Chengdu, China, is officially the world's largest freestanding building.
| Jul 3, 2013
Mall of America will double in size after $2.5 billion expansion
The nation's largest indoor mall will undergo a $2.5 billion, 10-year expansion project that will add attractions like an NHL-sized skating rink and an indoor water park.