Tampa International Airport is about to see a major facelift come Dec. 2, according to The Tampa Tribune. The airport’s first floor of the terminal on the east end of baggage claim will be the first location to have work done. Directing traffic will be the airport’s main duty once construction is underway, with volunteers, signs and newly hired customer personnel guiding passengers as they exit planes.
The east end of the ground transportation floor will become the station for the airport’s people mover, a new addition to the building that features a light-rail train that shuttles passengers between the airport, the economy lot and the rental car facility. This renovation is expected to take three years.
The airport’s transfer level will see changes beginning in January. Shuttle walkways will be pushed back to create 50,000-sf of extra space on the third floor, which will accommodate more concessions. While there is no word yet on what new concessions will be added, travelers will begin to see new shops and restaurants opening in 2016.
The first phase of the plan will cost $1 billion and happen over a period of three years. It is expected to give thousands of people jobs while decongesting area roadways, allowing rental car companies to grow, and preparing the airport for a doubling of passengers by 2041. The project will also keep the airport running efficiently and effectively for the next 20-30 years.
For more information abut the project, visit www.tampaairport.com.
Related Stories
Market Data | May 18, 2022
Architecture Billings Index moderates slightly, remains strong
For the fifteenth consecutive month architecture firms reported increasing demand for design services in April, according to a new report today from The American Institute of Architects (AIA).
Building Team | May 18, 2022
Bjarke Ingels-designed KING Toronto releases its final set of luxury penthouses
In April 2020, a penthouse at KING Toronto sold for $16 million, the highest condo sale in Toronto that year or the year after.
Building Team | May 17, 2022
MKA’s Embodied Carbon Action Plan will include reporting on carbon reductions for selected projects
Magnusson Klemencic Associates (MKA) recently released its SE 2050 Embodied Carbon Action Plan (ECAP) for 2022.
University Buildings | May 16, 2022
Yale’s newly renovated Schwarzman Center enriches student campus social life
Robert A.M. Stern Architects (RAMSA) recently unveiled the design of their restoration of the Schwarzman Center at Yale University, which includes dining spaces, a bar, and a food shop.
K-12 Schools | May 16, 2022
Private faculty offices are becoming a thing of the past at all levels of education
Perkins & Will’s recent design projects are using the area to encourage collaboration.
Codes and Standards | May 16, 2022
AIA releases Justice in the Built Environment guide
The American Institute of Architects (AIA) recently published a new supplementary edition of the Guides for Equitable Practice, titled “Justice in the Built Environment.”
K-12 Schools | May 16, 2022
A Quaker high school in Maryland is the first in the U.S. to get WELL Gold certification
Designed by Stantec, a Quaker high school is the first in the US to receive WELL Gold certification, which recognizes a commitment to occupants’ health and well-being.
Building Team | May 13, 2022
Glass penthouses rise above Toronto’s tree line
In midtown Toronto, the nine-story midrise building Leaside Common has released its Penthouse Collection: two-floor penthouses that take inspiration from Philip Johnson’s Glass House in Connecticut.
Market Data | May 12, 2022
Monthly construction input prices increase in April
Construction input prices increased 0.8% in April compared to the previous month, according to an Associated Builders and Contractors analysis of U.S. Bureau of Labor Statistics’ Producer Price Index data released today.
Codes and Standards | May 12, 2022
Solar industry creates non-profit to remove barriers to clean energy deployment
The Solar Energy Industries Association (SEIA) is launching a 501(c)3 non-profit organization to accelerate the transition to carbon-free electricity.