flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Tennessee Tech University’s new recreation and fitness center opens

University Buildings

Tennessee Tech University’s new recreation and fitness center opens

Wold | HFR Design designed the project.


By David Malone, Associate Editor | April 15, 2021
Tennessee Tech University Marc L. Burnett Student Recreation & Fitness Center aerial

Photos: Wold | HFR Design

The Marc L. Burnett Student Recreation & Fitness Center has officially opened on Tennessee Tech University’s campus. 

The new facility, designed by Wold | HFR Design, is twice the size of the 1991 facility it replaces and provides a new focal point at the campus entrance. The design and materials reflect a contemporary interpretation of the Georgian style architecture prevalent on campus.

 

Tennessee Tech University rec and fitness center

 

The three-story, 165,000-sf recreation and fitness facility includes a basketball gym and multi-activity court, a racquetball courts, retractable bleachers for spectators, a 13,000-sf weight room, a 6,000-sf cardio room, a climbing wall, a golf simulator, an elevated track, an aquatic center, a dance studio, a game room, and a wellness and nutrition area. Additionally, an expanded childcare space, offices, and large group exercise areas are included.

Basketball and pickleball courts are included outside and an outdoor pursuits component allows student to rent equipment such as kayaks and camping gear. The facility was completed in August 2020 but the grand opening was postponed until April 2021 due to the COVID-19 pandemic.

Related Stories

| Nov 13, 2012

Have colleges + universities gone too far with "Quality of Life" buildings?

We'd like your input - recent projects, photo/s, renderings, and expert insight - on an important article we're working on for our Jan 2013 issue

| Nov 11, 2012

Greenbuild 2012 Report: Higher Education

More and more colleges and universities see sustainainably designed buildings as a given

| Oct 30, 2012

Lord, Aeck & Sargent announces four student life facility wins

Projects recognize the architecture firm’s expertise on a nationwide basis.

| Oct 4, 2012

2012 Reconstruction Awards Gold Winner: Wake Forest Biotech Place, Winston-Salem, N.C.

Reconstruction centered on Building 91.1, a historic (1937) five-story former machine shop, with its distinctive façade of glass blocks, many of which were damaged. The Building Team repointed, relocated, or replaced 65,869 glass blocks.

| Sep 19, 2012

Modular, LEED-Gold Certified Dormitory Accommodates Appalachian State University Growth

By using modular construction, the university was able to open a dorm a full year earlier than a similar dorm built at the same time with traditional construction.

| Sep 6, 2012

CPPI awarded $30.3 million contract for University of Florida’s Harrell Medical Education Building

The specialized interdisciplinary learning environment will serve as a focal point for integration and program development for all primary care educational activities in the College of Medicine.

| Sep 5, 2012

Skanska tops out residence hall complex at the University of Delaware

Construction firm achieves structural milestone for $71 million student housing expansion project.

| Aug 30, 2012

John S Clark Co. completes teaching lab at UNC Wilmington

Three-story building provides offices, classrooms, and labs.

| Aug 7, 2012

Pioneering revival

Financial setbacks didn’t stop this Building Team from transforming the country’s first women’s medical school into a new home for college students.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021