A few months ago, Tesla confirmed reports that the company was looking to establish a factory in Shanghai to better serve the Chinese market. On Oct. 17, Tesla announced it had secured the rights to a 210-acre piece of land in Lingang, Shanghai on which it will build Gigafactory 3.
The electric car company plans to build Gigafactory 3 on an accelerated construction schedule in order to get the factory up and running as quickly as possible in the face of new tariffs. Between import tariffs and ocean transport costs, Tesla is operating at a 55% to 60% cost disadvantage compared to the same car produced locally in China.
See Also: Under-development solar panels snap together and turn waste heat into hot water
Construction is expected to begin in the near future and take about two years, and $2 billion, before the factory can produce vehicles. It will take another two or three years from that point before the factory is at full power, which will allow it to produce about 500,000 vehicles per year.
Gigafactory 3 will be the first Gigafactory outside of the United States. Gigafactory 1 is located at the Tahoe Reno Industrial Center in Nevada. Gigafactory 2 is located in Buffalo, N.Y.
Related Stories
Giants 400 | Aug 19, 2022
2022 Giants 400 Report: Tracking the nation's largest architecture, engineering, and construction firms
Now 46 years running, Building Design+Construction's 2022 Giants 400 Report rankings the largest architecture, engineering, and construction firms in the U.S. This year a record 519 AEC firms participated in BD+C's Giants 400 report. The final report includes more than 130 rankings across 25 building sectors and specialty categories.
Industrial Facilities | Jul 26, 2022
As industrial sector sizzles, investors watch impact of inflation and interest rates
Demand continues to top supply, especially on the coasts, according to latest CommercialEdge report.
Urban Planning | Jul 19, 2022
The EV charger station market is appealing to investors and developers, large and small
The latest entry, The StackCharge, is designed to make recharging time seem shorter.
Multifamily Housing | Jun 21, 2022
Two birds, one solution: Can we solve urban last-mile distribution and housing challenges at the same time?
When it comes to the development of both multifamily housing and last-mile distribution centers, particularly in metropolitan environments, each presents its own series of challenges and hurdles. One solution: single-use structures.
Industrial Facilities | Jun 17, 2022
A new Innovation Center in Wyoming focuses on finding sustainable ways to use coal
The 10-acre site is part of the area’s R&D push.
Self-Storage Facilities | May 19, 2022
A steady increase in new self-storage space is meeting growing need in large metros and their suburbs
Rent Café’s study projects a 9 percent bump in the nation’s existing inventory.
Adaptive Reuse | May 18, 2022
An auto plant in Detroit to get a retread as mixed-use housing
Fisher 21 Lofts could be the largest minority-led redevelopment in the city’s history.
Industrial Facilities | Apr 30, 2022
CapRock Partners taps into industrial space demand
The investment firm is committed to building 15 million sf of warehouses.
Industrial Facilities | Apr 14, 2022
JLL's take on the race for industrial space
In the previous decade, the inventory of industrial space couldn’t keep up with demand that was driven by the dual surges of the coronavirus and online shopping. Vacancies declined and rents rose. JLL has just published a research report on this sector called “The Race for Industrial Space.” Mehtab Randhawa, JLL’s Americas Head of Industrial Research, shares the highlights of a new report on the industrial sector's growth.
Industrial Facilities | Apr 6, 2022
Development underway for Missouri’s largest logistics park
Hunt Midwest envisions 27 buildings will be completed over the next 10 years.