flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Texas Goes Bigger with High-Profile Community Rowing House

Texas Goes Bigger with High-Profile Community Rowing House

Community rowing club chooses sustainable cladding for its modern rowing house


By Nichiha | October 9, 2012

When the opportunity arose to introduce a progressive new look for the newly constructed Austin Boathouse, Joseph LaRocca knew that he had the perfect product solution to create an innovative design primarily for performance rating and clean modern appearance. Located in downtown Austin, the Austin Boathouse is the home of the Austin Rowing Club, a non-profit organization promoting the sport of rowing in Austin, Texas. The Austin Boathouse was a three-year high-profile project, centrally located and surrounded by active biking and running trails, used by thousands of residents each day.

LaRocca, principal architect at GSC Architects, chose to base the project design on the Nichiha panels because of the aesthetics and qualities of the panels, including the modular design; sustainability of materials; clean, crisp reveals; and the ability to utilize custom colors to fit the surrounding community. 

“The design of the Austin Parks and Recreation Department Boathouse required a durable exterior material capable of withstanding weathering effects and community wear-and-tear,” commented LaRocca. “The City of Austin wanted a structure that made a visual statement, and that utilized sustainable materials.  In the end, the Nichiha panels hit all of the goals, and helped create a building that the citizens of Austin will be proud stewards of for many years to come.”

Architect
Joseph LaRocca
GSC Architects

Location
Austin, TX

Project Type
New Construction

Product
Illumination Series

Project Features

  • Clean, Modern Look
  • Color Xpressions System
  • Modularity
  • Sustainability
  • Durability
  • Versatility
  • Modified Rainscreen System
  • Cost Savings

Panel thickness, modularity, and rainscreen approach to cladding were key attributes to the utilization of Nichiha panels. Nichiha’s Illumination Series Panels with Color Xpressions (color customization) were a perfect choice to reflect the image of the city and create a standout focal point for a locally known landmark. The Illumination Series panels provide a durable and versatile design, with a modern look and feel, complementing the current community landscape, at the fraction of the price of metal panels.

“We love the look of the Nichiha Illumination panels. We wanted the clean, modern look of metal, and Nichiha was the only manufacturer who could accomplish the aesthetic we wanted and remain environmentally-friendly,” stated LaRocca.

Challenge

To find durable, modern-looking panels with the design aesthetics and qualities to compliment the surrounding community.

Solution

The Illumination Series panels provided a durable, sustainable and versatile design, with a clean crisp modern look and feel, complementing the current community landscape, at the fraction of the price of metal panels.

Results

Nichiha was able to provide the client with the desired look and feel to complement the Austin Boathouse, utilizing high-performance, and durable exterior cladding panels. +

Related Stories

| Dec 7, 2011

ICS Builders and BKSK Architects complete St. Hilda’s House in Manhattan

The facility's design highlights the inherent link between environmental consciousness and religious reverence.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Dec 5, 2011

Fraser Brown MacKenna wins Green Gown Award

Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.

| Dec 2, 2011

What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20

Nominate a colleague, peer, or even yourself. Applications available here.

| Nov 29, 2011

First EPD awarded to exterior roof and wall products manufacturer

EPD is a standardized, internationally recognized tool for providing information on a product’s environmental impact. 

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 22, 2011

Corporate America adopting revolutionary technology

The survey also found that by 2015, the standard of square feet allocated per employee is expected to drop from 200 to estimates ranging from 50 to 100 square feet per person dependent upon the industry sector. 

| Nov 8, 2011

Transforming a landmark coastal resort

Originally built in 1973, the building had received several alterations over the years but the progressive deterioration caused by the harsh salt water environment had never been addressed.

boombox1
boombox2
native1

More In Category

Brick and Masonry

A journey through masonry reclad litigation

This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021