flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

These three hoteliers make up two-thirds of all new hotel development in the U.S.

Hotel Facilities

These three hoteliers make up two-thirds of all new hotel development in the U.S.

With a combined 3,523 projects and 400,490 rooms in the pipeline, Marriott, Hilton, and InterContinental dominate the U.S. hotel construction sector.


By Lodging Econometrics | October 31, 2022
These three hoteliers make up two-thirds of all new hotel development in the U.S.

Photo: Jonathan Kemper via Unsplash

According to the quarterly United States Construction Pipeline Trend Report from Lodging Econometrics (LE), the franchise companies with the largest construction pipelines at the end of Q3 2022 are led by Marriott International with 1,385 projects/168,725 rooms. Following Marriott is Hilton Worldwide with 1,351 projects/152,383 rooms, and InterContinental Hotels Group (IHG) with 787 projects/79,382 rooms.

Combined, these three companies account for 66% of the projects and 64% of the rooms in the total pipeline. Each company has seen growth year-over-year.

These three franchise companies also have the most projects and rooms in each stage of the construction pipeline. Marriott leads with the greatest number of projects in the under construction stage with 259 projects/35,946 rooms, then Hilton with 248 projects/31,698 rooms, and IHG with 135 projects/15,688 rooms currently under construction.

At the close of the third quarter, Marriott also leads with the most projects scheduled to start construction in the next 12 months with 739 projects/87,626 rooms, followed by IHG with 484 projects/46,957 rooms, and Hilton with 333 projects/38,043 rooms.

Hilton set record high project and rooms counts in the early planning stage at the Q3 close, totaling 770 projects/82,642 rooms. Marriott currently has 387 projects/45,153 rooms in early planning and IHG closed the quarter with 168 projects/16,737 rooms in the early planning stage.

Hotel construction by brand 

The brands of each of these companies with the largest number of projects in the pipeline at Q3 are Hilton’s Home2 Suites with 494 projects/50,809 rooms; IHG’s Holiday Inn Express with 297 projects/28,323; and Marriott’s TownePlace Suites with 291 projects/27,329 rooms. Other prominent brands in the pipeline for these franchise companies are the Hampton by Hilton brands with 281 projects/28,543 rooms; Marriott’s Fairfield Inn with 238 projects/21,988 rooms; and IHG’s Avid Hotel brand with 135 projects/11,445 rooms.

Through the end of the third quarter, Marriott opened 102 new hotels/12,908 rooms. Hilton opened 90 new hotels/10,834 rooms, and IHG opened 40 projects/4,120 rooms.


ALSO SEE: Top 115 Hotel Sector Architecture and AE Firms for 2022


 

LE analysts forecast Marriott will open the most new hotels in 2023 with 168 hotels/20,952 rooms. Next is Hilton with 136 new hotels/17,049 rooms, followed by IHG with 89 new hotels/9,588 rooms. In 2024, LE forecasts that Marriott will open 192 new hotels/22,815 rooms. Hilton is expected to open 154 new hotels/16,967 rooms and IHG is expected to open 142 new hotels/14,596 rooms.

Related Stories

| Aug 11, 2010

Colorado hospital wins LEED Gold

The main building of the Medical Center of the Rockies in Loveland, Colo., is a 136-bed regional medical center offering a full spectrum of services, with specialties in cardiac and trauma care. Constructed primarily of brick, native sandstone, and 85,000 sf of metal panels manufactured by Centria, the 600,000-sf main building, by Denver-based HLM Design, is one of the few hospitals in the nati...

| Aug 11, 2010

Design ups comfort, care in cancer center

A new cancer center is slated to open in fall 2011 at Banner Gateway Medical Center, Gilbert, Ariz. The three-story, 120,000-sf, $107 million cancer center will contain physician clinics, medical imaging, radiation oncology, infusion therapy, and support services. A/E firm Cannon Design has created a visually open, column-free interior to increase patient comfort and care.

| Aug 11, 2010

Charlotte hospital expands its surgery capabilities

The Chicago office of RTKL designed Carolinas HealthCare System's Mercy Medical Plaza, Charlotte, N.C. The 150,000-sf hospital houses 12 operating rooms with expanded pre-operative and recovery space, a pharmacy, and a central sterile processing unit. Tenant space occupies 75,000 sf. RTKL mimicked the materials and mass of older buildings on the campus but created a more modern look by using ex...

| Aug 11, 2010

And the world's tallest building is…

At more than 2,600 feet high, the Burj Dubai (right) can still lay claim to the title of world's tallest building—although like all other super-tall buildings, its exact height will have to be recalculated now that the Council on Tall Buildings and Urban Habitat (CTBUH) announced a change to its height criteria.

| Aug 11, 2010

Spa resort in harmony with mountain setting

The Sparkling Hill Resort and Wellness Hotel in Vernon, B.C., looks as if it was chiseled out of bedrock and jutting from the mountainside. Designed by the Victoria, B.C., office of Cannon Design, the 240,000-sf resort has 152 guest rooms with floor-to-ceiling windows and spa-like bathrooms, as well as a signature 20,000-sf whole-body wellness spa with treatment rooms designed to feel like they...

| Aug 11, 2010

Triangular tower targets travelers

Chicago-based Goettsch Partners is designing a new mixed-use high-rise for the Chinese city of Dalian, located on the Yellow Sea coast. Developed by Hong Kong-based China Resources Land Limited, the tower will have almost 1.1 million sf, which includes a 377-room Grand Hyatt hotel, 84 apartments, three restaurants, banquet space, and a spa and fitness center.

| Aug 11, 2010

Expanding retail complex is LEED pre-certified

The Promenade at Coconut Creek in Broward County, Fla., a live-work-play shopping and lifestyle center, is being expanded by 105,000 sf. When phase II of the 335,000-sf project is complete, the facility will house 75 retailers, restaurants, and related services, making it one of the largest mixed-use projects in northern Broward County.

| Aug 11, 2010

CityCenter projects get LEED Gold

MGM Mirage and Infinity World Development have received LEED Gold certification for the first three CityCenter projects: the ARIA Resort hotel tower, ARIA Resort convention center and theater, and the Vdara Hotel (above). The CityCenter developers anticipate Gold or Silver LEED certification for the project's remaining developments, which include a Mandarin Oriental hotel, a 500,000-sf retail a...

| Aug 11, 2010

Philadelphia cancer center seeks LEED certification

The New York office of Thornton Tomasetti provided structural engineering services for the Ruth and Raymond Perelman Center for Advanced Medicine in Philadelphia, a $232 million medical research center and advanced treatment center for cancer and cardiovascular disease. Designed by a joint venture of Perkins Eastman Architects and Rafael Vinõly Architects, the 340,000-sf facility will hous...

| Aug 11, 2010

High-level NICU opens in Washington, D.C.

Design to the highest distinction available by the American Academy of Pediatrics, the new Level IIIC neonatal intensive care unit (NICU) at Children's National Medical Center in Washington D.C., is equipped to care for the sickest premature babies, including those that require open-heart surgery. The 54-bed facility, designed by Karlsberger with KLMK Group as space planner, is four times large...

boombox1
boombox2
native1

More In Category



3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021