flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Three new members elected to AISC Board of Directors

Three new members elected to AISC Board of Directors

New members will immediately begin serving on the AISC Board of Directors, assisting with the organization's planning and leadership in the steel construction industry.


By Posted by Tim Gregorski, Senior Editor | October 15, 2012

The American Institute of Steel Construction (AISC) announced the election of three new members to its Board of Directors at its recent Annual Meeting in Miami. Robert Philip Stupp, Jr., executive vice president of Stupp Bros., Inc., St. Louis, Lawrence F. Kruth, P.E., vice president of engineering, technology and safety at Douglas Steel Fabricating Corporation, Lansing, Mich., and Mark W. Trimble, P.E., marketing manager at Huntington Steel & Supply Company, Huntington, W.Va., will immediately begin serving on the AISC Board of Directors, assisting with the organization's planning and leadership in the steel construction industry.

Stupp currently serves as executive vice president of Stupp Bros., Inc., St. Louis, and is also president of its fabrication segment and subsidiary Hammert's Iron Works, Inc.  Previously, he served for three years as assistant general manager for Stupp's bridge division, Stupp Bridge Company, and before that was vice president for more than a decade when it was named Stupp Bros. Bridge & Iron Co. For the past nine years, he's served as director of the Central Fabricators Association in Chicago and is also a member of AISC's Ad Hoc Committee on Barcode Standards. His father is Robert (Bob) P. Stupp, a former AISC chairman of the board and the longest-serving board member in AISC's history. AISC's prestigious Robert P. Stupp Award for Leadership Excellence was created in 1998 in his honor in recognition of his unparalleled leadership in the steel construction industry.

Kruth is vice president of engineering, technology and safety at Douglas Steel Fabricating Corporation, Lansing, Mich., and a member of its Board of Directors. With more than 30 years of structural engineering experience, he's responsible for managing the engineering department, advancing technology in the company as well as all safety for the shop and field. Previously, he served for seven years as a project manager for the company. He serves as Chair of the AISC Safety Committee and is a member of the AISC Research Committee. He's also a member of AISC's TC6 Connection Design Specification Committee, AISC's TC13 Quality Control & Assurance Specification Committee as well as a member of the AISC Specification Committee. He's been appointed to the MIOSHA Part 26, Structural Steel Erection Advisory Committee and MIOSHA Part 10, Lifting & Digging Advisory Committee.

Trimble is marketing manager for Huntington Steel & Supply Company, Huntington, W.Va., and one of six executive team members charged with business development and client satisfaction. He's been with the company for about 20 years and started out as manager of its structural fabrication division. Previously, he owned and managed an engineering and surveying practice in Kentucky. He's a past president of both the West Virginia Steel Fabricators Association and West Virginia Society of Professional Engineers. Currently he's a member of AISC's Planning Committee for NASCC: The Steel Conference. +

Related Stories

| Sep 21, 2022

Demand for design services accelerates

Demand for design services from U.S. architecture firms grew at an accelerated pace in August, according to a new report today from The American Institute of Architects (AIA).

K-12 Schools | Sep 21, 2022

Architecture that invites everyone to dance

If “diversity” is being invited to the party in education facilities, “inclusivity” is being asked to dance, writes Emily Pierson-Brown, People Culture Manager with Perkins Eastman.

| Sep 20, 2022

NIBS develops implementation plan for digital transformation of built environment

The National Institute of Building Sciences (NIBS) says it has developed an implementation and launch plan for a sweeping digital transformation of the built environment.

| Sep 20, 2022

New Long Beach office building reflects Mid-Century Modern garden-style motif

The new Long Beach, Calif., headquarters of Laserfiche, a provider of intelligent content management and business process automation software, was built on a brownfield parcel previously considered undevelopable.

| Sep 19, 2022

New York City construction site inspections, enforcement found ‘inadequate’

A new report by the New York State Comptroller found that New York City construction site inspections and regulation enforcement need improvement.

| Sep 16, 2022

Fairfax County, Va., considers impactful code change to reduce flood risk

Fairfax County, Va., in the Washington, D.C., metro region is considering a major code change to reduce the risk from floods.

Multifamily Housing | Sep 15, 2022

Heat Pumps in Multifamily Projects

RMI's Lacey Tan gives the basics of heat pumps and how they can reduce energy costs and carbon emissions in apartment projects.

| Sep 15, 2022

Monthly construction input prices dip in August

Construction input prices decreased 1.4% in August compared to the previous month, according to an Associated Builders and Contractors analysis of U.S. Bureau of Labor Statistics Producer Price Index data released today.

| Sep 15, 2022

First LEED Platinum, net zero and net zero water synagogue opens

Kol Emeth Center, the world’s first LEED Platinum, net zero and net zero water synagogue, opened recently in Palo Alto, Calif.

| Sep 14, 2022

Fires on Amazon warehouse roofs seemingly caused by faulty PV installations

Amazon has made installing solar panels on rooftops a key part of its ESG strategy, but a series of events last year show how challenging greening up major facilities can be.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021