Tishman Construction Corporation is managing the construction of a new, $160-million, 14-story, 510,000-sf Philadelphia Family Courthouse for the Pennsylvania Department of General Services (DGS) at the northwest corner of 15th and Arch streets. With excavation almost complete and foundations having begun, the building is planned to be completed by the Spring of 2014.
The Family Courthouse project is the largest construction project in Philadelphia since the Pennsylvania Convention Center expansion and the renovation of the former 30th Street Post Office for the IRS. Tishman successfully delivered the convention center three months early as part of a joint venture.
The courthouse building, designed by EwingCole, is pursuing LEED Silver certification. The first level of the building will include the main entrance, court queuing and security, a vehicular port for prisoners being brought to the building for court appearances, building support areas, and the parking lobby. The second level will include court support offices, prisoner holding cells, and a public vending area accessed by elevator and escalator. BD+C
Related Stories
| Sep 14, 2011
Lend Lease’s role in 9/11 Memorial & Museum
Lend Lease is honored to be the general contractor for the National September 11 Memorial & Museum project at the World Trade Center site in New York City.
| Sep 14, 2011
Thornton Tomasetti’s Poon named to the Council on Tall Buildings and Urban Habitat’s Board of Trustees
During his 30-plus years of experience, Poon has been responsible for the design and construction of super high-rise structures, mixed-used buildings, hotels, airports, arenas and residential buildings worldwide.
| Sep 12, 2011
PVs play new roles as a teaching tool
Solar installations are helping K-12 schools around the country save money and teach students the intricacies of renewable energy sources.
| Sep 12, 2011
Living Buildings: Are AEC Firms up to the Challenge?
Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.
| Sep 12, 2011
First phase of plan to revitalize Florida's Hialeah Park announced
This is the first project of a master plan developed to revive the historic racetrack.
| Sep 9, 2011
Kauffman Center for the Performing Arts in Kansas City opens this month
Theatre Projects played the lead role in theatre design and planning as well as in engineering the customized theatre equipment. BNIM in Kansas City served as the executive architect.
| Sep 9, 2011
$22 million investment made in energy efficient building maker
The buildings use at least 25% less energy than the strictest building codes in the U.S., and as much as 80% less energy in certain parts of the country.
| Sep 8, 2011
Two promoted at ajc architects
ajc architects announced the promotion of Joshua W. Greene, AIA, NCARB, LEED Green Associate to Associate Principal of the firm. The firm also announced that Kent Rigby, AIA, has been promoted to Associate Architect.
| Sep 7, 2011
KSS Architects wins AIA NJ design award
The project was one of three to win the award in the category of Architectural/Non-Residential.