Rank | Company | 2012 BIM Revenue ($) |
1 | Gensler | $484,286,130 |
2 | HOK | $385,700,000 |
3 | HDR Architecture | $299,828,000 |
4 | Perkins+Will | $270,225,000 |
5 | Skidmore, Owings & Merrill | $267,601,700 |
6 | HKS | $216,000,000 |
7 | Stantec | $197,000,000 |
8 | Cannon Design | $165,000,000 |
9 | RTKL | $131,834,950 |
10 | SmithGroupJJR | $105,598,000 |
11 | EYP | $85,381,169 |
12 | Corgan | $79,216,442 |
13 | ZGF Architects | $75,004,322 |
14 | Hammel, Green and Abrahamson | $74,300,000 |
15 | PageSoutherlandPage | $69,330,000 |
16 | Flad Architects | $65,200,000 |
17 | Fentress Architects | $57,800,000 |
18 | HMC Architects | $54,590,674 |
19 | DLR Group | $53,000,000 |
20 | Perkins Eastman | $50,750,000 |
21 | Ennead Architects | $50,130,000 |
22 | HNTB Archtecture | $48,840,828 |
23 | SHW Group | $46,817,128 |
24 | BSA LifeStructures | $45,582,887 |
25 | Kohn Pedersen Fox Associates | $43,254,418 |
26 | Cooper Carry | $35,772,963 |
27 | Shepley Bulfinch Richardson & Abbott | $35,689,160 |
28 | Harley Ellis Devereaux | $34,512,000 |
29 | Little | $32,828,600 |
30 | Sasaki Associates | $32,477,625 |
31 | WHR Architects | $32,315,287 |
32 | Kaplan McLaughlin Diaz | $32,000,000 |
33 | EwingCole | $30,000,000 |
34 | WDG Architecture | $29,224,000 |
35 | CO Architects | $28,845,000 |
36 | Cuningham Group Architecture | $28,628,186 |
37 | Moseley Architects | $28,139,757 |
38 | Array Architects | $26,933,863 |
39 | OZ Architecture | $25,752,000 |
40 | FKP Architects | $25,000,000 |
41 | FXFOWLE Architects | $24,637,693 |
42 | Payette | $23,827,500 |
43 | Morris Architects | $23,400,000 |
44 | LPA | $22,801,366 |
45 | Moody Nolan | $22,100,000 |
46 | LS3P | $22,099,802 |
47 | CTA Architects Engineers | $21,614,667 |
48 | Ballinger | $21,254,852 |
49 | Kirksey Architecture | $21,152,542 |
50 | IBI Group | $20,867,271 |
51 | Francis Cauffman | $20,518,122 |
52 | Westlake Reed Leskosky | $20,480,000 |
53 | PGAL | $20,320,000 |
54 | S/L/A/M Collaborative, The | $20,202,859 |
55 | Albert Kahn Family of Companies | $19,576,600 |
56 | Fanning/Howey Associates | $19,200,000 |
57 | RNL | $18,955,000 |
58 | Cambridge Seven Associates | $18,200,000 |
59 | Hnedak Bobo Group | $17,105,000 |
60 | Hoefer Wysocki Architecture | $16,608,000 |
61 | Taylor | $16,196,847 |
62 | Astorino | $16,134,495 |
63 | LMN Architects | $16,060,800 |
64 | Epstein | $15,031,000 |
65 | Fletcher-Thompson | $14,925,000 |
66 | Integrated Design Group | $14,598,910 |
67 | FGM Architects | $14,100,100 |
68 | VOA Associates | $12,699,000 |
69 | SMMA | Symmes Maini & McKee Associates | $11,677,437 |
70 | NTD Architecture | $11,613,804 |
71 | GBBN Architects | $10,050,000 |
72 | Lee, Burkhart, Liu | $9,450,000 |
73 | SLATERPAULL Architects | $9,101,937 |
74 | Legat Architects | $8,952,000 |
75 | Margulies Perruzzi Architects | $8,875,543 |
76 | Davis Brody Bond | $8,649,455 |
77 | Ziegler Cooper Architects | $8,000,000 |
78 | HLW International | $8,000,000 |
79 | MBH Architects | $7,301,000 |
80 | Good Fulton & Farrell | $6,935,144 |
81 | Heery International | $6,700,000 |
82 | Wight & Co. | $6,663,600 |
83 | Reynolds, Smith and Hills | $6,540,000 |
84 | Lord, Aeck & Sargent | $6,276,000 |
85 | RBB Architects | $6,262,236 |
86 | WATG / Wimberly Interiors | $6,006,000 |
87 | H3 Hardy Collaboration Architecture | $5,313,000 |
88 | Gresham, Smith and Partners | $5,178,894 |
89 | Swanke Hayden Connell Asrchitects | $5,000,000 |
90 | Anderson Mikos Architects | $4,675,000 |
91 | Baskervill | $4,390,000 |
92 | Architekton | $3,824,417 |
93 | WD Partners | $3,740,000 |
94 | FreemanWhite | $3,594,638 |
95 | FRCH Design Worldwide | $3,566,844 |
96 | Carrier Johnson + Culture | $2,920,746 |
97 | LARGE Architecture | $2,830,756 |
98 | BBG-BBGM | $2,800,000 |
99 | Ware Malcomb | $2,654,000 |
100 | NELSON | $2,076,490 |
101 | PBK | $2,010,000 |
102 | Perkowitz+Ruth Architects | $1,925,652 |
103 | KZF Design | $1,768,442 |
104 | Environetics | $1,600,000 |
105 | CASCO | $1,500,000 |
106 | Beyer Blinder Belle Architects & Planners | $1,410,858 |
107 | DLA Architects | $1,132,740 |
108 | api(+) | $1,100,000 |
109 | Massa Montalto Architects | $1,063,453 |
110 | Omniplan Architects | $1,027,000 |
111 | Emersion Design | $1,023,928 |
112 | Harvard Jolly Architecture | $762,000 |
113 | LawKingdon Architecture | $750,000 |
114 | Nadel | $618,000 |
115 | TEG Architects - The Estopinal Group | $528,135 |
116 | BBS Architects, Landscape Architects and Engineers | $470,000 |
117 | Rule Joy Trammell + Rubio | $275,000 |
118 | PHX Architecture | $120,000 |
119 | JRS Architect | $25,000 |
120 | H+L Architecture | $10,827 |
Back to the BIM Giants article
Read the full 2013 Giants 300 Report
Related Stories
| Nov 2, 2010
Energy Analysis No Longer a Luxury
Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.
| Nov 2, 2010
Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’
Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.
| Nov 2, 2010
Historic changes to commercial building energy codes drive energy efficiency, emissions reductions
Revisions to the commercial section of the 2012 International Energy Conservation Code (IECC) represent the largest single-step efficiency increase in the history of the national, model energy. The changes mean that new and renovated buildings constructed in jurisdictions that follow the 2012 IECC will use 30% less energy than those built to current standards.
| Nov 1, 2010
Sustainable, mixed-income housing to revitalize community
The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.
| Nov 1, 2010
John Pearce: First thing I tell designers: Do your homework!
John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.
| Nov 1, 2010
Vancouver’s former Olympic Village shoots for Gold
The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.