flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top BIM/VDC articles of 2011-2012

Top BIM/VDC articles of 2011-2012

A compendium of BD+Cs top building information modeling and virtual design + construction articles from 2011-12.


By By BD+C Staff | January 3, 2013
A compendium of BD+Cs top building information modeling and virtual design + con
A compendium of BD+Cs top building information modeling and virtual design + construction articles from 2011-12.
This article first appeared in the January 2013 issue of BD+C.

“BIM not just for new buildings”
January 2012

How the Ohio State University Medical Center converted 55 existing buildings from AutoCAD to BIM to improve quality and speed of decision making for facility management, maintenance, and future renovations.

/bim-not-just-new-buildings

 

 

“Two new BIM tools that make your project easier to manage”
December 2011

Two innovations demonstrate how fabricators and owner’s reps are stepping in to fill the gaps between construction and design that can be exposed by working with a 3D model.

/two-new-bim-tools-make-your-project-easier-manage

 

 

 

 

 

 

 

 

 

 

“Handy apps for AEC professionals”
April 2012

Helpful mobile apps for everyday design and construction tasks, Including BIM/VDC. Our fave: MagicPlan, which uses GPS to help you quickly measure and draw a floor plan of any room.

/18-handy-tablet-apps-aec-professionals

 

 

 

 

 

 

“Top 25 BIM AEC Firms: BIM finally starting to pay off for AEC firms, but there’s a long way to go”
July 2012

Survey of top 25 Giants 300 firms on their use of BIM. BD+C editors asked: Is BIM paying off—through cost savings, higher quality, or client satisfaction? See what leaders at Barton Malow, NELSON, Magnusson Klemencic Associates, KJWW Engineering, Syska Hennessy Group, EwingCole, Graef, and BRPH say about their firms’ use of BIM.

/bim-finally-starting-pay-aec-firms

 

 

 

“BIM in the academy: Lessons for the AEC industry”
May 2012

John Tocci, Jr., Manager of Virtual Design and Construction at Gilbane Building Company, reviews BIM in Academia, a new book that looks to reevaluate BIM’s place in the world of architectural education.

/bim-academy

 

 

 

 

 

 

 

 

 

“BIM becomes VDC:A case study in disruption”
December 2012

The growth of BIM is heralding a true disruption in the construction industry, says John Tobin, LEED AP, Director of Architecture at EYP Architecture & Engineering. It is transforming markets and revolutionizing expectations.

http://www.BDCnetwork.com/bim-becomes-vdc. +

Related Stories

| Dec 6, 2011

Mortenson Construction completes Elk Wind Project in Iowa

By the end of 2011, Mortenson will have built 17 wind projects in the state generating a total of 1894 megawatts of renewable power.

| Dec 6, 2011

?ThyssenKrupp acquires Sterling Elevators Services

The acquisition of Sterling Elevator Services Corporation is the third acquisition completed by ThyssenKrupp Elevator AG in the last three months in North America. 

| Dec 6, 2011

Vivenzio named vice president of building performance practice at Thornton Tomasetti’s New York Office

Vivenzio, a licensed architect in New York and New Jersey, has more than 28 years of experience in architectural project management, construction administration, building diagnostic services and forensic investigation.

| Dec 6, 2011

New office building features largest solar panel system in New Orleans

Woodward Design+Build celebrates grand opening of new green headquarters in Central City.

| Dec 5, 2011

New York and San Francisco receive World Green Building Council's Government Leadership Awards

USGBC commends two U.S. cities for their innovation in green building leadership.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Dec 5, 2011

Fraser Brown MacKenna wins Green Gown Award

Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.

| Dec 5, 2011

RJM Construction begins building Nova Classical Academy in St. Paul

As the general contractor, RJM is constructing the 94,000-sf building that will consolidate the St. Paul school’s two other locations. 

| Dec 5, 2011

Gables Residential brings mixed-use building to Houston's Tanglewood area

The design integrates a detailed brick and masonry facade, acknowledging the soft pastel color palette of the surrounding Mediterranean heritage of Tanglewood.

| Dec 5, 2011

SchenkelShultz Architecture designs Dr. Phillips Charities Headquarters building in Orlando

The building incorporates sustainable architectural features, environmentally friendly building products, energy-efficient systems, and environmentally-sensitive construction practices.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021