“BIM not just for new buildings”
January 2012
How the Ohio State University Medical Center converted 55 existing buildings from AutoCAD to BIM to improve quality and speed of decision making for facility management, maintenance, and future renovations.
“Two new BIM tools that make your project easier to manage”
December 2011
Two innovations demonstrate how fabricators and owner’s reps are stepping in to fill the gaps between construction and design that can be exposed by working with a 3D model.
/two-new-bim-tools-make-your-project-easier-manage
“Handy apps for AEC professionals”
April 2012
Helpful mobile apps for everyday design and construction tasks, Including BIM/VDC. Our fave: MagicPlan, which uses GPS to help you quickly measure and draw a floor plan of any room.
/18-handy-tablet-apps-aec-professionals
“Top 25 BIM AEC Firms: BIM finally starting to pay off for AEC firms, but there’s a long way to go”
July 2012
Survey of top 25 Giants 300 firms on their use of BIM. BD+C editors asked: Is BIM paying off—through cost savings, higher quality, or client satisfaction? See what leaders at Barton Malow, NELSON, Magnusson Klemencic Associates, KJWW Engineering, Syska Hennessy Group, EwingCole, Graef, and BRPH say about their firms’ use of BIM.
/bim-finally-starting-pay-aec-firms
“BIM in the academy: Lessons for the AEC industry”
May 2012
John Tocci, Jr., Manager of Virtual Design and Construction at Gilbane Building Company, reviews BIM in Academia, a new book that looks to reevaluate BIM’s place in the world of architectural education.
“BIM becomes VDC:A case study in disruption”
December 2012
The growth of BIM is heralding a true disruption in the construction industry, says John Tobin, LEED AP, Director of Architecture at EYP Architecture & Engineering. It is transforming markets and revolutionizing expectations.
Related Stories
| Feb 15, 2011
Iconic TWA terminal may reopen as a boutique hotel
The Port Authority of New York and New Jersey hopes to squeeze a hotel with about 150 rooms in the space between the old TWA terminal and the new JetBlue building. The old TWA terminal would serve as an entry to the hotel and hotel lobby, which would also contain restaurants and shops.
| Feb 15, 2011
New Orleans' rebuilt public housing architecture gets mixed reviews
The architecture of New Orleans’ new public housing is awash with optimism about how urban-design will improve residents' lives—but the changes are based on the idealism of an earlier era that’s being erased and revised.
| Feb 15, 2011
LAUSD commissions innovative prefab prototypes for future building
The LA Unified School District, under the leadership of a new facilities director, reversed course regarding prototypes for its new schools and engaged architects to create compelling kit-of-parts schemes that are largely prefabricated.
| Feb 15, 2011
New 2030 Challenge to include carbon footprint of building materials and products
Architecture 2030 has just broadened the scope of its 2030 Challenge, issuing an additional challenge regarding the climate impact of building products. The 2030 Challenge for Products aims to reduce the embodied carbon (meaning the carbon emissions equivalent) of building products 50% by 2030.
| Feb 15, 2011
New Urbanist Andrés Duany: We need a LEED Brown rating
Andrés Duany advocates a "LEED Brown" rating that would give contractors credit for using traditional but low cost measures that are not easy to quantify or certify. He described these steps as "the original green," and "what we did when we didn't have money." Ostensibly, LEED Brown would be in addition to the current Silver, Gold and Platinum ratings.
| Feb 15, 2011
AIA on President Obama's proposed $1 billion investment in energy conservation
The President’s budget increases the value of investment in energy conservation in commercial buildings by roughly $1 billion, reports AIA 2011 President Clark Manus, FAIA. The significant increase from the current tax deduction of $1.80 per sq. ft. now on the books is an increase for which the AIA has been advocating in order to encourage energy conservation.
| Feb 14, 2011
Sustainable Roofing: A Whole-Building Approach
According to sustainability experts, the first step toward designing an energy-efficient roofing system is to see roof materials and systems as an integral component of the enclosure and the building as a whole. Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Feb 11, 2011
Four Products That Stand Up to Hurricanes
What do a panelized wall system, a newly developed roof hatch, spray polyurethane foam, and a custom-made curtain wall have in common? They’ve been extensively researched and tested for their ability to take abuse from the likes of Hurricane Katrina.