flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top Hotel Architecture Firms [2013 Giants 300 Report]

Top Hotel Architecture Firms [2013 Giants 300 Report]

Gensler, WATG, HKS top Building Design+Construction's 2013 ranking of the largest hotel architecture and architecture/engineering firms in the U.S.


By BD+C Staff | July 22, 2013
Nova Hotel, Abuja, Nigeria; Courtesy: WATG
Nova Hotel, Abuja, Nigeria; Courtesy: WATG

 

 

 

 

 

 

 

 

Rank Company 2012 Hospitality Revenue ($)
1 Gensler $69,090,000
2 WATG / Wimberly Interiors $54,713,000
3 HKS $32,000,000
4 Leo A Daly $19,999,621
5 RTKL Associates $19,730,000
6 Hnedak Bobo Group $17,425,000
7 Perkins Eastman $11,600,000
8 Kohn Pedersen Fox Associates $11,251,800
9 Cuningham Group Architecture $10,019,865
10 HOK $10,011,000
11 BBG-BBGM $9,800,000
12 DLR Group $9,700,000
13 Perkins+Will $8,979,352
14 Cooper Carry $8,185,526
15 BLT Architects $7,430,000
16 FRCH Design Worldwide $6,400,000
17 VOA Associates $6,381,110
18 OZ Architecture $5,494,842
19 Smallwood, Reynolds, Stewart, Stewart & Associates $5,483,292
20 Callison $4,624,539
21 Baskervill $4,413,000
22 Skidmore, Owings & Merrill $4,320,000
23 IBI Group $4,067,059
24 Solomon Cordwell Buenz $4,000,000
25 Cambridge Seven Associates $3,841,000
26 Goettsch Partners $3,690,000
27 Adache Group Architects $3,600,000
28 Stantec $3,468,683
29 EwingCole $3,000,000
30 AXIS Architecture + Design $1,734,749
31 ZGF Architects $1,486,279
32 Rule Joy Trammell + Rubio $1,410,000
33 Kaplan McLaughlin Diaz $1,404,799
34 LawKingdon Architecture $1,400,000
35 RDH Interests $1,383,119
36 Morris Architects $1,350,000
37 Perkowitz+Ruth Architects $1,289,176
38 Ware Malcomb $1,134,000
39 HLW International $1,000,000
39 Fishbeck, Thompson, Carr & Huber $1,000,000
41 GBBN Architects $975,000
42 Kirksey Architecture $846,101
43 EDI International $754,000
44 PageSoutherlandPage $620,000
45 SMMA | Symmes Maini & McKee Associates $550,000
46 Jerde Partnership, The $500,000
47 MBH Architects $467,000
48 RSP Architects $452,000
49 WDG Architecture $439,998
50 LARGE Architecture $410,105
51 Environetics $366,993
52 Harley Ellis Devereaux $365,000
53 Legat Architects $360,000
54 BBS Architects, Landscape Architects and Engineers $340,000
55 Niles Bolton Associates $311,797
56 Moody Nolan $300,000
57 CTA Architects Engineers $290,000
58 Little $270,000
59 RNL $252,000
60 Westlake Reed Leskosky $250,000
61 LS3P $212,797
62 FXFOWLE Architects $173,487
63 NTD Architecture $171,153
64 Nadel $156,242
65 Ennead Architects $150,000
65 Goodwyn, Mills & Cawood $150,000
67 Gresham, Smith and Partners $128,262
68 PHX Architecture $120,000
69 Hoffmann Architects $113,000
70 Sasaki Associates $97,585
71 CASCO $85,000
72 JRS Architect $75,000
73 Beyer Blinder Belle Architects & Planners $18,065
74 Hoefer Wysocki Architecture $18,000
75 Epstein $10,300
76 NELSON $4,372
77 Wight & Co. $1,000

 

Read the Hotel Giants article 

 

Read BD+C's full Giants 300 Report

Related Stories

| Apr 12, 2011

Rutgers students offered choice of food and dining facilities

The Livingston Dining Commons at Rutgers University’s Livingston Campus in New Brunswick, N.J., was designed by Biber Partnership, Summit, N.J., to offer three different dining rooms that connect to a central servery.

| Apr 12, 2011

Retail complex enjoys prime Abu Dhabi location

The Galleria at Sowwah Square in Abu Dhabi will be built in a prime location within Sowwah Island that also includes a five-star Four Seasons Hotel, the healthcare facility Cleveland Clinic Abu Dhabi, and nearly two million sf of Class A office space.

| Apr 12, 2011

Luxury New York high rise adjacent to the High Line

Located adjacent to New York City’s High Line Park, 500 West 23rd Street will offer 111 luxury rental apartments when it opens later this year.

| Apr 12, 2011

College of New Jersey facility will teach teachers how to teach

The College of New Jersey broke ground on its 79,000-sf School of Education building in Ewing, N.J.

| Apr 12, 2011

Mental hospital in Boston redeveloped as healthcare complex

An abandoned state mental health facility in Boston’s prestigious Longwood Medical Area is being transformed into the Mass Mental Health Center, a four-building mixed-use complex that includes a mental health day hospital, a clinical and office building, a medical research facility for Brigham and Women’s Hospital, and a residential facility.

| Apr 12, 2011

Miami courthouse design does justice to children and the environment

Suffolk Construction broke ground recently for the Miami-Dade County Children’s Courthouse, a $328 million project the firm has a 30-month contract to complete.

| Apr 12, 2011

Long-awaited San Francisco center is music to jazz organization’s ears

After 28 years, SFJAZZ is getting its first permanent home. The San Francisco-based nonprofit, which is dedicated to advancing the art of jazz through concerts and educational programs, contracted local design firm Mark Cavagnero Associates and general contractor Hathaway Dinwiddie to create a modern performance center in the city’s Hayes Valley neighborhood

| Apr 12, 2011

Entrance pavilion adds subtle style to Natural History Museum of Los Angeles

A $13 million gift from the Otis Booth Foundation is funding a new entrance pavilion at the Natural History Museum of Los Angeles County. CO Architects, Los Angeles, is designing the frameless structure with an energy-efficient curtain wall, vertical suspension rods, and horizontal knife plates to make it as transparent as possible.

| Apr 12, 2011

BIM Grows Up: Separating Hype from Reality in a 3D World

While BIM adoption still lags in both design and construction, some enterprising owners, architects, and contractors are unlocking the potential of this dynamic technology.

| Apr 12, 2011

Metal cladding: Enhancing design with single-skin panels, MCMs, and IMPs

Single-skin metal panels, metal composite panels, and insulated metal panels can add both aesthetic and functional value to your projects, if you use them correctly.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021