AECOM, Parsons Brinckerhoff, Buro Happold top Building Design+Construction's 2013 ranking of the largest hotel engineering and engineering/architecture firms in the U.S.


By BD+C Staff | July 22, 2013
Grand Hyatt Beijing Hotel, Beijing, China; Courtesy: Parsons Brinckerhoff
Grand Hyatt Beijing Hotel, Beijing, China; Courtesy: Parsons Brinckerhoff

 

 

 

 

 

 

 

 

Rank Company 2012 Hospitality Revenue ($)
1 AECOM Technology Corp. $100,190,000
2 Parsons Brinckerhoff $28,900,000
3 Buro Happold Consulting Engineers $16,165,000
4 Rolf Jensen & Associates $7,600,000
5 Thornton Tomasetti $7,218,731
6 KPFF Consulting Engineers $6,000,000
7 Arup $5,527,371
8 Michael Baker Jr. $4,340,000
9 Wiss, Janney, Elstner Associates $2,880,000
10 WSP USA $2,696,642
11 Simpson Gumpertz & Heger $2,200,000
11 Aon Fire Protection Engineering $2,000,000
13 Clark Nexsen $1,450,223
14 Vanderweil Engineers $1,272,800
15 Glumac $1,252,000
16 Magnusson Klemencic Associates $1,239,089
17 Bala Consulting Engineers $1,200,000
18 M/E Engineering $1,134,350
19 TLC Engineering for Architecture $973,982
20 Environmental Systems Design $971,399
21 M-E Engineers $900,000
22 H&A Architects & Engineers $863,474
23 Paulus, Sokolowski and Sartor $750,000
24 AKF Group $739,000
25 KJWW Engineering Consultants $651,984
26 KLH Engineers $524,215
27 Walter P Moore $495,971
28 GHT Limited $450,000
29 Science Applications International Corp. $426,888
30 Interface Engineering $425,984
31 Allen & Shariff $400,000
32 Walker Parking Consultants $360,240
33 Bridgers & Paxton Consulting Engineers $337,378
34 Haynes Whaley Associates $301,003
35 CTLGroup $300,000
36 RDK Engineers $281,000
37 Henderson Engineers $272,858
38 H.F. Lenz $272,000
39 Smith Seckman Reid $270,470
40 Syska Hennessy Group $265,788
41 Primera Engineers $211,000
42 Coffman Engineers $200,000
43 Joseph R. Loring & Associates $155,000
44 Wallace Engineering $150,000
45 GRAEF $143,034
46 Dunham Associates $125,000
47 Karpinski Engineering $109,499
48 Barge, Waggoner, Sumner and Cannon $100,000
48 ThermalTech Engineering $100,000
50 Heapy Engineering $96,897
51 Spectrum Engineers $89,390
52 Newcomb & Boyd $87,850
53 TTG $85,000
54 Mazzetti $57,094
55 Sparling $40,399
56 Dewberry $33,605
57 FBA Engineering $30,000
58 Degenkolb Engineers $14,192
59 Davis, Bowen & Friedel $10,521
60 Kamm Consulting $3,500
61 Shive-Hattery $3,055
62 French & Parrello Associates $3,000

 

Read the Hotel Giants article 

 

Read BD+C's full Giants 300 Report

Related Stories

| Mar 27, 2012

Precast concrete used for affordable, sustainable housing in New York

Largest affordable housing development in the nation will provide housing for close to 500,000 people. 

| Mar 27, 2012

Groundbreaking held for Valencia College West Campus Building 10 in Orlando

Project led by design-build team of SchenkelShultz Architecture and McCree General Contractors, both of Orlando.

| Mar 27, 2012

Hollister Construction completes LEED Silver bank in Woodland Park, N.J.

Ground-up construction project included installation of solar panels.

| Mar 26, 2012

Jones Lang LaSalle completes construction of $536M Parkview Regional Medical Center

Hospital ushers in new era of local access to advanced medical treatments in Northeast Indiana.

| Mar 26, 2012

McCarthy tops off Math and Science Building at San Diego Mesa College

Designed by Architects | Delawie Wilkes Rodrigues Barker, the new San Diego Mesa College Math and Science Building will provide new educational space for students pursuing degree and certificate programs in biology, chemistry, physical sciences and mathematics.

| Mar 26, 2012

Los Angeles County to host free green building training

Opportunity for residential and commercial building professionals to gain insight on state and county green building standards and regulations.

| Mar 26, 2012

Ball State University completes nation's largest ground-source geothermal system

Ball State's geothermal system will replace four aging coal-fired boilers to provide renewable power that will heat and cool 47 university buildings, representing 5.5-million-sf on the 660-acre campus.

| Mar 22, 2012

Hawaiian architecture firm chooses FRP trellis system over traditional materials

MGA Architecture plans to add five more trellis systems on the neighboring building. 

| Mar 22, 2012

Moline Public Library uses copper as an exterior building material

Architects incorporate decorative copper panels to create the look of a heavy plate copper shingle. 

| Mar 21, 2012

10 common data center surprises

Technologies and best practices provide path for better preparation.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021