flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top Hotel Engineering Firms [2013 Giants 300 Report]

Top Hotel Engineering Firms [2013 Giants 300 Report]

AECOM, Parsons Brinckerhoff, Buro Happold top Building Design+Construction's 2013 ranking of the largest hotel engineering and engineering/architecture firms in the U.S.


By BD+C Staff | July 22, 2013
Grand Hyatt Beijing Hotel, Beijing, China; Courtesy: Parsons Brinckerhoff
Grand Hyatt Beijing Hotel, Beijing, China; Courtesy: Parsons Brinckerhoff

 

 

 

 

 

 

 

 

Rank Company 2012 Hospitality Revenue ($)
1 AECOM Technology Corp. $100,190,000
2 Parsons Brinckerhoff $28,900,000
3 Buro Happold Consulting Engineers $16,165,000
4 Rolf Jensen & Associates $7,600,000
5 Thornton Tomasetti $7,218,731
6 KPFF Consulting Engineers $6,000,000
7 Arup $5,527,371
8 Michael Baker Jr. $4,340,000
9 Wiss, Janney, Elstner Associates $2,880,000
10 WSP USA $2,696,642
11 Simpson Gumpertz & Heger $2,200,000
11 Aon Fire Protection Engineering $2,000,000
13 Clark Nexsen $1,450,223
14 Vanderweil Engineers $1,272,800
15 Glumac $1,252,000
16 Magnusson Klemencic Associates $1,239,089
17 Bala Consulting Engineers $1,200,000
18 M/E Engineering $1,134,350
19 TLC Engineering for Architecture $973,982
20 Environmental Systems Design $971,399
21 M-E Engineers $900,000
22 H&A Architects & Engineers $863,474
23 Paulus, Sokolowski and Sartor $750,000
24 AKF Group $739,000
25 KJWW Engineering Consultants $651,984
26 KLH Engineers $524,215
27 Walter P Moore $495,971
28 GHT Limited $450,000
29 Science Applications International Corp. $426,888
30 Interface Engineering $425,984
31 Allen & Shariff $400,000
32 Walker Parking Consultants $360,240
33 Bridgers & Paxton Consulting Engineers $337,378
34 Haynes Whaley Associates $301,003
35 CTLGroup $300,000
36 RDK Engineers $281,000
37 Henderson Engineers $272,858
38 H.F. Lenz $272,000
39 Smith Seckman Reid $270,470
40 Syska Hennessy Group $265,788
41 Primera Engineers $211,000
42 Coffman Engineers $200,000
43 Joseph R. Loring & Associates $155,000
44 Wallace Engineering $150,000
45 GRAEF $143,034
46 Dunham Associates $125,000
47 Karpinski Engineering $109,499
48 Barge, Waggoner, Sumner and Cannon $100,000
48 ThermalTech Engineering $100,000
50 Heapy Engineering $96,897
51 Spectrum Engineers $89,390
52 Newcomb & Boyd $87,850
53 TTG $85,000
54 Mazzetti $57,094
55 Sparling $40,399
56 Dewberry $33,605
57 FBA Engineering $30,000
58 Degenkolb Engineers $14,192
59 Davis, Bowen & Friedel $10,521
60 Kamm Consulting $3,500
61 Shive-Hattery $3,055
62 French & Parrello Associates $3,000

 

Read the Hotel Giants article 

 

Read BD+C's full Giants 300 Report

Related Stories

| Mar 19, 2012

Smith Carter joins forces with Genivar

Smith Carter has a workforce of some 190 employees and designs complex buildings in challenging environments.

| Mar 19, 2012

HKS Selected for Baylor Medical Center at Waxahachie

Baylor Medical Center at Waxahachiewill incorporate advanced technology including telemedicine, digital imaging, remote patient monitoring, electronic medical records and computer patient records. 

| Mar 19, 2012

Mixed-use project redefines Midtown District in Plantation, Fla.

Stiles Construction is building the residential complex, which is one of Broward County’s first multifamily rental communities designed to achieve LEED certification from the USGBC. 

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

| Mar 16, 2012

Work on Oxnard, Calif. shopping center resumes after a three-year hiatus

Stalled since 2009, developers of the Collection at RiverPark decided to restart construction on the outdoor mall. 

| Mar 16, 2012

Stego embarks on HPD Pilot Program

Vapor barrier manufacturer strives to provide better green choices to designers and builders.

| Mar 16, 2012

Marvin Windows and Doors accepting entries for fourth-annual myMarvin Architect’s Challenge

Architects in U.S. and abroad offered the chance to showcase their very best work.

| Mar 14, 2012

Hearing to decide fate of unfinished Harmon in Las Vegas under way

The testimony began with CityCenter consulting engineer Chukwuma Ekwueme methodically showing photo after photo of parts of the Harmon, where he and his team had chipped away the concrete pillars and beams to examine the steel reinforcing bars inside.

| Mar 14, 2012

Firestone names 2012 Master Contractor Award Winners

Annual award acknowledges industry’s top roofing professionals.

| Mar 14, 2012

Plans for San Francisco's tallest building revamped

The glassy white high-rise would be 60 stories and 1,070 feet tall with an entrance at First and Mission streets.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021