flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top Hotel Engineering Firms [2013 Giants 300 Report]

Top Hotel Engineering Firms [2013 Giants 300 Report]

AECOM, Parsons Brinckerhoff, Buro Happold top Building Design+Construction's 2013 ranking of the largest hotel engineering and engineering/architecture firms in the U.S.


By BD+C Staff | July 22, 2013
Grand Hyatt Beijing Hotel, Beijing, China; Courtesy: Parsons Brinckerhoff
Grand Hyatt Beijing Hotel, Beijing, China; Courtesy: Parsons Brinckerhoff

 

 

 

 

 

 

 

 

Rank Company 2012 Hospitality Revenue ($)
1 AECOM Technology Corp. $100,190,000
2 Parsons Brinckerhoff $28,900,000
3 Buro Happold Consulting Engineers $16,165,000
4 Rolf Jensen & Associates $7,600,000
5 Thornton Tomasetti $7,218,731
6 KPFF Consulting Engineers $6,000,000
7 Arup $5,527,371
8 Michael Baker Jr. $4,340,000
9 Wiss, Janney, Elstner Associates $2,880,000
10 WSP USA $2,696,642
11 Simpson Gumpertz & Heger $2,200,000
11 Aon Fire Protection Engineering $2,000,000
13 Clark Nexsen $1,450,223
14 Vanderweil Engineers $1,272,800
15 Glumac $1,252,000
16 Magnusson Klemencic Associates $1,239,089
17 Bala Consulting Engineers $1,200,000
18 M/E Engineering $1,134,350
19 TLC Engineering for Architecture $973,982
20 Environmental Systems Design $971,399
21 M-E Engineers $900,000
22 H&A Architects & Engineers $863,474
23 Paulus, Sokolowski and Sartor $750,000
24 AKF Group $739,000
25 KJWW Engineering Consultants $651,984
26 KLH Engineers $524,215
27 Walter P Moore $495,971
28 GHT Limited $450,000
29 Science Applications International Corp. $426,888
30 Interface Engineering $425,984
31 Allen & Shariff $400,000
32 Walker Parking Consultants $360,240
33 Bridgers & Paxton Consulting Engineers $337,378
34 Haynes Whaley Associates $301,003
35 CTLGroup $300,000
36 RDK Engineers $281,000
37 Henderson Engineers $272,858
38 H.F. Lenz $272,000
39 Smith Seckman Reid $270,470
40 Syska Hennessy Group $265,788
41 Primera Engineers $211,000
42 Coffman Engineers $200,000
43 Joseph R. Loring & Associates $155,000
44 Wallace Engineering $150,000
45 GRAEF $143,034
46 Dunham Associates $125,000
47 Karpinski Engineering $109,499
48 Barge, Waggoner, Sumner and Cannon $100,000
48 ThermalTech Engineering $100,000
50 Heapy Engineering $96,897
51 Spectrum Engineers $89,390
52 Newcomb & Boyd $87,850
53 TTG $85,000
54 Mazzetti $57,094
55 Sparling $40,399
56 Dewberry $33,605
57 FBA Engineering $30,000
58 Degenkolb Engineers $14,192
59 Davis, Bowen & Friedel $10,521
60 Kamm Consulting $3,500
61 Shive-Hattery $3,055
62 French & Parrello Associates $3,000

 

Read the Hotel Giants article 

 

Read BD+C's full Giants 300 Report

Related Stories

| Dec 20, 2011

Third annual Gingerbread Build-off winners announced

Nine awards were handed out acknowledging the most unique and creative gingerbread structures completed.

| Dec 20, 2011

Aragon Construction leading build-out of foursquare office

The modern, minimalist build-out will have elements of the foursquare “badges” in different aspects of the space, using glass, steel, and vibrantly painted gypsum board.

| Dec 20, 2011

HOAR Construction opens Austin, Texas office

Major projects in central Texas spur firm’s growth.

| Dec 19, 2011

HGA renovates Rowing Center at Cornell University

Renovation provides state-of-the-art waterfront facility.

| Dec 19, 2011

Chicago’s Aqua Tower wins international design award

Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.

| Dec 19, 2011

Summit Design+Build selected as GC for Chicago recon project

The 130,000 square foot building is being completely renovated.

| Dec 19, 2011

USGBC welcomes new board directors?

Board responsible for articulating and upholding the vision, values, mission of organization.

| Dec 19, 2011

Davis Construction breaks ground on new NIAID property

The new offices will total 490,998 square feet in a 10-story building with two wings of 25,000 square feet each. 

| Dec 19, 2011

Survey: Job growth driving demand for office and industrial real estate in Southern California

Annual USC Lusk Center for Real Estate forecast reveals signs of slow market recovery.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021