Rank | Company | 2012 Hospitality Revenue ($) |
1 | AECOM Technology Corp. | $100,190,000 |
2 | Parsons Brinckerhoff | $28,900,000 |
3 | Buro Happold Consulting Engineers | $16,165,000 |
4 | Rolf Jensen & Associates | $7,600,000 |
5 | Thornton Tomasetti | $7,218,731 |
6 | KPFF Consulting Engineers | $6,000,000 |
7 | Arup | $5,527,371 |
8 | Michael Baker Jr. | $4,340,000 |
9 | Wiss, Janney, Elstner Associates | $2,880,000 |
10 | WSP USA | $2,696,642 |
11 | Simpson Gumpertz & Heger | $2,200,000 |
11 | Aon Fire Protection Engineering | $2,000,000 |
13 | Clark Nexsen | $1,450,223 |
14 | Vanderweil Engineers | $1,272,800 |
15 | Glumac | $1,252,000 |
16 | Magnusson Klemencic Associates | $1,239,089 |
17 | Bala Consulting Engineers | $1,200,000 |
18 | M/E Engineering | $1,134,350 |
19 | TLC Engineering for Architecture | $973,982 |
20 | Environmental Systems Design | $971,399 |
21 | M-E Engineers | $900,000 |
22 | H&A Architects & Engineers | $863,474 |
23 | Paulus, Sokolowski and Sartor | $750,000 |
24 | AKF Group | $739,000 |
25 | KJWW Engineering Consultants | $651,984 |
26 | KLH Engineers | $524,215 |
27 | Walter P Moore | $495,971 |
28 | GHT Limited | $450,000 |
29 | Science Applications International Corp. | $426,888 |
30 | Interface Engineering | $425,984 |
31 | Allen & Shariff | $400,000 |
32 | Walker Parking Consultants | $360,240 |
33 | Bridgers & Paxton Consulting Engineers | $337,378 |
34 | Haynes Whaley Associates | $301,003 |
35 | CTLGroup | $300,000 |
36 | RDK Engineers | $281,000 |
37 | Henderson Engineers | $272,858 |
38 | H.F. Lenz | $272,000 |
39 | Smith Seckman Reid | $270,470 |
40 | Syska Hennessy Group | $265,788 |
41 | Primera Engineers | $211,000 |
42 | Coffman Engineers | $200,000 |
43 | Joseph R. Loring & Associates | $155,000 |
44 | Wallace Engineering | $150,000 |
45 | GRAEF | $143,034 |
46 | Dunham Associates | $125,000 |
47 | Karpinski Engineering | $109,499 |
48 | Barge, Waggoner, Sumner and Cannon | $100,000 |
48 | ThermalTech Engineering | $100,000 |
50 | Heapy Engineering | $96,897 |
51 | Spectrum Engineers | $89,390 |
52 | Newcomb & Boyd | $87,850 |
53 | TTG | $85,000 |
54 | Mazzetti | $57,094 |
55 | Sparling | $40,399 |
56 | Dewberry | $33,605 |
57 | FBA Engineering | $30,000 |
58 | Degenkolb Engineers | $14,192 |
59 | Davis, Bowen & Friedel | $10,521 |
60 | Kamm Consulting | $3,500 |
61 | Shive-Hattery | $3,055 |
62 | French & Parrello Associates | $3,000 |
Read the Hotel Giants article
Read BD+C's full Giants 300 Report
Related Stories
| Nov 1, 2010
John Pearce: First thing I tell designers: Do your homework!
John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.
| Nov 1, 2010
Vancouver’s former Olympic Village shoots for Gold
The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.