flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top K-12 School Sector Architecture Firms [2013 Giants 300 Report]

Top K-12 School Sector Architecture Firms [2013 Giants 300 Report]

DLR, SHW top Building Design+Construction's 2013 ranking of the largest K-12 school sector architecture and architecture/engineering firms in the U.S.


By BD+C Staff | July 22, 2013
Rank Company 2012 K-12 Revenue ($)
1 DLR Group $38,250,000
2 SHW Group $32,328,843
3 PBK $31,760,000
4 IBI Group $27,977,860
5 HMC Architects $25,407,164
6 Stantec $21,586,209
7 Fanning/Howey Associates $20,247,000
8 Perkins+Will $19,938,211
9 Heery International $16,561,303
10 LPA $14,438,017
11 NTD Architecture $13,129,833
12 Perkins Eastman $13,050,000
13 Corgan $12,086,022
14 S/L/A/M Collaborative, The $11,581,000
15 NAC|Architecture $11,460,923
16 Moseley Architects $11,434,168
17 Fletcher-Thompson $9,620,000
18 FGM Architects $9,288,111
19 Leo A Daly $8,661,304
20 SMMA | Symmes Maini & McKee Associates $7,900,000
21 Wight & Co. $6,992,632
22 SEI Design Group $6,898,000
23 DLA Architects $5,999,790
24 SLATERPAULL Architects $5,726,536
25 Legat Architects $5,310,000
26 LS3P $5,111,880
27 Cuningham Group Architecture $4,866,792
28 Little $4,283,800
29 Ashley McGraw Architects $4,032,194
30 EwingCole $4,000,000
31 BBS Architects, Landscape Architects and Engineers $3,350,000
32 Harley Ellis Devereaux $3,134,000
33 Harvard Jolly Architecture $2,910,511
34 CTA Architects Engineers $2,868,705
35 Cooper Carry $2,856,159
36 Astorino $2,710,000
37 Goodwyn, Mills & Cawood $2,620,000
38 FXFOWLE Architects $2,610,644
39 Moody Nolan $2,500,000
40 Reynolds, Smith and Hills $2,180,000
41 Swanke Hayden Connell Asrchitects $2,000,000
42 GBBN Architects $1,600,000
43 Massa Montalto Architects $1,596,189
44 KZF Design $1,548,386
45 PGAL $1,520,000
46 Smallwood, Reynolds, Stewart, Stewart & Associates $1,490,039
47 Shepley Bulfinch Richardson & Abbott $1,413,440
48 Mithun $1,189,000
49 Environetics $1,188,686
50 HLW International $1,000,000
51 CASCO $940,000
52 Ennead Architects $880,000
53 Gensler $800,000
54 Sasaki Associates $797,830
55 Albert Kahn Family of Companies $687,568
56 HNTB Archtecture $629,682
57 CO Architects $629,000
58 OZ Architecture $565,653
59 Westlake Reed Leskosky $500,000
60 Good Fulton & Farrell $482,510
61 Rule Joy Trammell + Rubio $450,000
62 Kirksey Architecture $423,050
63 DesignGroup $408,989
64 LMN Architects $379,300
65 Hoffmann Architects $337,000
66 Morris Architects $300,000
66 Sherlock, Smith & Adams $300,000
68 Davis Brody Bond $279,429
69 TEG Architects - The Estopinal Group $278,901
70 RSP Architects $261,000
71 LawKingdon Architecture $250,000
72 JRS Architect $225,000
73 Nadel $218,464
74 Epstein $205,000
75 Adache Group Architects $200,000
76 VOA Associates $162,515
77 SRG Partnership $152,268
78 Ware Malcomb $75,000
79 Niles Bolton Associates $50,757
80 Hensley Lamkin Rachel $41,000
81 Omniplan Architects $34,217

 

Back to the K-12 School Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

Office Buildings | Mar 21, 2024

BOMA updates floor measurement standard for office buildings

The Building Owners and Managers Association (BOMA) International has released its latest floor measurement standard for office buildings, BOMA 2024 for Office Buildings – ANSI/BOMA Z65.1-2024.

Healthcare Facilities | Mar 18, 2024

A modular construction solution to the mental healthcare crisis

Maria Ionescu, Senior Medical Planner, Stantec, shares a tested solution for the overburdened emergency department: Modular hub-and-spoke design.

Codes and Standards | Mar 18, 2024

New urban stormwater policies treat rainwater as a resource

U.S. cities are revamping how they handle stormwater to reduce flooding and capture rainfall and recharge aquifers. New policies reflect a change in mindset from treating stormwater as a nuisance to be quickly diverted away to capturing it as a resource.

Plumbing | Mar 18, 2024

EPA to revise criteria for WaterSense faucets and faucet accessories

The U.S. Environmental Protection Agency (EPA) plans to revise its criteria for faucets and faucet accessories to earn the WaterSense label. The specification launched in 2007; since then, most faucets now sold in the U.S. meet or exceed the current WaterSense maximum flow rate of 1.5 gallons per minute (gpm). 

MFPRO+ New Projects | Mar 18, 2024

Luxury apartments in New York restore and renovate a century-old residential building

COOKFOX Architects has completed a luxury apartment building at 378 West End Avenue in New York City. The project restored and renovated the original residence built in 1915, while extending a new structure east on West 78th Street. 

Multifamily Housing | Mar 18, 2024

YWCA building in Boston’s Back Bay converted into 210 affordable rental apartments

Renovation of YWCA at 140 Clarendon Street will serve 111 previously unhoused families and individuals.

Healthcare Facilities | Mar 17, 2024

5 criteria to optimize medical office design

Healthcare designers need to consider privacy, separate areas for practitioners, natural light, outdoor spaces, and thoughtful selection of materials for medical office buildings.

Construction Costs | Mar 15, 2024

Retail center construction costs for 2024

Data from Gordian shows the most recent costs per square foot for restaurants, social clubs, one-story department stores, retail stores and movie theaters in select cities.

Architects | Mar 15, 2024

4 ways to streamline your architectural practice

Vessel Architecture's Lindsay Straatmann highlights four habits that have helped her discover the key to mastering efficiency as an architect.

Healthcare Facilities | Mar 15, 2024

First comprehensive cancer hospital in Dubai to host specialized multidisciplinary care

Stantec was selected to lead the design team for the Hamdan Bin Rashid Cancer Hospital, Dubai’s first integrated, comprehensive cancer hospital. Named in honor of the late Sheikh Hamdan Bin Rashid Al Maktoum, the hospital is scheduled to open to patients in 2026.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021