Affiliated Engineers, URS, AECOM top Building Design+Construction's 2013 ranking of the largest university sector engineering and engineering/architecture firms in the U.S.


By BD+C Staff | July 22, 2013
Advanced Energy Research and Technology Center, Stony Brook University; courtesy
Advanced Energy Research and Technology Center, Stony Brook University; courtesy Affiliated Engineers

 

 

 

 

 

 

 

 

 

Rank Company 2012 University Revenue ($)
1 Affiliated Engineers $47,202,000
2 URS Corp. $39,211,852
3 AECOM Technology Corp. $33,000,000
4 Buro Happold Consulting Engineers $28,695,000
5 Burns & McDonnell $25,635,000
6 STV $21,121,000
7 Parsons Brinckerhoff $19,000,000
8 Clark Nexsen $18,141,790
9 Vanderweil Engineers $15,062,100
10 KJWW Engineering Consultants $13,554,873
11 KPFF Consulting Engineers $13,000,000
12 Dewberry $12,978,808
13 Arup $11,901,904
14 Simpson Gumpertz & Heger $10,000,000
15 Bard, Rao + Athanas Consulting Engineers $9,800,000
16 Eaton Energy Solutions $8,444,164
17 TTG $6,945,100
18 Wiss, Janney, Elstner Associates $6,920,000
19 Walker Parking Consultants $6,812,298
20 Bergmann Associates $6,780,000
21 Thornton Tomasetti $6,359,540
22 Interface Engineering $6,343,831
23 Newcomb & Boyd $6,203,693
24 Heapy Engineering $6,147,420
25 P2S Engineering $5,680,501
26 AKF Group $5,419,000
27 RMF Engineering Design $5,300,000
28 M/E Engineering $5,161,300
29 WSP USA $5,087,811
30 RDK Engineers $4,508,000
31 Shive-Hattery $4,264,381
32 Glumac $4,240,000
33 M-E Engineers $3,500,000
34 SSOE Group $3,332,322
35 H.F. Lenz $3,013,000
36 Joseph R. Loring & Associates $3,000,000
37 Spectrum Engineers $2,987,125
38 TLC Engineering for Architecture $2,944,786
39 Syska Hennessy Group $2,849,438
40 Science Applications International Corp. $2,559,263
41 Smith Seckman Reid $2,519,005
42 GRAEF $2,488,859
43 Rolf Jensen & Associates $2,400,000
44 Walter P Moore $2,396,672
45 Sparling $2,394,462
46 Stanley Consultants $2,322,986
47 Peter Basso Associates $2,300,000
48 KCI Technologies $2,100,000
49 Aon Fire Protection Engineering $2,000,000
49 Middough $2,000,000
51 CJL Engineering $1,896,957
52 Brinjac Engineering $1,811,357
53 Michael Baker Jr. $1,800,000
54 ThermalTech Engineering $1,800,000
55 Henderson Engineers $1,760,023
56 French & Parrello Associates $1,650,000
57 Ross & Baruzzini $1,510,533
58 Primera Engineers $1,489,000
59 Environmental Systems Design $1,418,526
60 Bala Consulting Engineers $1,350,000
61 Bridgers & Paxton Consulting Engineers $1,349,511
62 CTLGroup $1,100,000
63 Degenkolb Engineers $1,079,993
64 Mazzetti $1,038,952
65 Karpinski Engineering $1,037,079
66 Allen & Shariff $1,000,000
67 Dunham Associates $850,000
68 Paulus, Sokolowski and Sartor $800,000
69 Wallace Engineering $750,000
70 Haynes Whaley Associates $697,591
71 OLA Consulting Engineers $600,000
72 Wick Fisher White $585,140
73 GHT Limited $300,000
74 Magnusson Klemencic Associates $214,612
75 Kamm Consulting $126,305
76 Coffman Engineers $110,000
77 Davis, Bowen & Friedel $97,200
78 G&W Engineering $95,000
79 Total Building Commissioning $75,975
80 KLH Engineers $51,615
81 FBA Engineering $50,000
82 GRW $47,152
83 Guernsey $41,913
84 Apogee Consulting Group $14,000

 

Back to the University Sector Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

Museums | Aug 11, 2010

Design guidelines for museums, archives, and art storage facilities

This column diagnoses the three most common moisture challenges with museums, archives, and art storage facilities and provides design guidance on how to avoid them.

| Aug 11, 2010

Broadway-style theater headed to Kentucky

One of Kentucky's largest performing arts venues should open in 2011—that's when construction is expected to wrap up on Eastern Kentucky University's Business & Technology Center for Performing Arts. The 93,000-sf Broadway-caliber theater will seat 2,000 audience members and have a 60×24-foot stage proscenium and a fly loft.

| Aug 11, 2010

People+Firms

| Aug 11, 2010

Citizenship building in Texas targets LEED Silver

The Department of Homeland Security's new U.S. Citizenship and Immigration Services facility in Irving, Texas, was designed by 4240 Architecture and developed by JDL Castle Corporation. The focal point of the two-story, 56,000-sf building is the double-height, glass-walled Ceremony Room where new citizens take the oath.

| Aug 11, 2010

Carpenters' union helping build its own headquarters

The New England Regional Council of Carpenters headquarters in Dorchester, Mass., is taking shape within a 1940s industrial building. The Building Team of ADD Inc., RDK Engineers, Suffolk Construction, and the carpenters' Joint Apprenticeship Training Committee, is giving the old facility a modern makeover by converting the existing two-story structure into a three-story, 75,000-sf, LEED-certif...

| Aug 11, 2010

Utah research facility reflects Native American architecture

A $130 million research facility is being built at University of Utah's Salt Lake City campus. The James L. Sorenson Molecular Biotechnology Building—a USTAR Innovation Center—is being designed by the Atlanta office of Lord Aeck & Sargent, in association with Salt-Lake City-based Architectural Nexus.

| Aug 11, 2010

San Bernardino health center doubles in size

Temecula, Calif.-based EDGE was awarded the contract for California State University San Bernardino's health center renovation and expansion. The two-phase, $4 million project was designed by RSK Associates, San Francisco, and includes an 11,000-sf, tilt-up concrete expansion—which doubles the size of the facility—and site and infrastructure work.

| Aug 11, 2010

Goettsch Partners wins design competition for Soochow Securities HQ in China

Chicago-based Goettsch Partners has been selected to design the Soochow Securities Headquarters, the new office and stock exchange building for Soochow Securities Co. Ltd. The 21-story, 441,300-sf project includes 344,400 sf of office space, an 86,100-sf stock exchange, classrooms, and underground parking.

| Aug 11, 2010

New hospital expands Idaho healthcare options

Ascension Group Architects, Arlington, Texas, is designing a $150 million replacement hospital for Portneuf Medical Center in Pocatello, Idaho. An existing facility will be renovated as part of the project. The new six-story, 320-000-sf complex will house 187 beds, along with an intensive care unit, a cardiovascular care unit, pediatrics, psychiatry, surgical suites, rehabilitation clinic, and ...

| Aug 11, 2010

Colonnade fixes setback problem in Brooklyn condo project

The New York firm Scarano Architects was brought in by the developers of Olive Park condominiums in the Williamsburg section of Brooklyn to bring the facility up to code after frame out was completed. The architects designed colonnades along the building's perimeter to create the 15-foot setback required by the New York City Planning Commission.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021