flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top University Sector Engineering Firms [2013 Giants 300 Report]

Top University Sector Engineering Firms [2013 Giants 300 Report]

Affiliated Engineers, URS, AECOM top Building Design+Construction's 2013 ranking of the largest university sector engineering and engineering/architecture firms in the U.S.


By BD+C Staff | July 22, 2013
Advanced Energy Research and Technology Center, Stony Brook University; courtesy
Advanced Energy Research and Technology Center, Stony Brook University; courtesy Affiliated Engineers

 

 

 

 

 

 

 

 

 

Rank Company 2012 University Revenue ($)
1 Affiliated Engineers $47,202,000
2 URS Corp. $39,211,852
3 AECOM Technology Corp. $33,000,000
4 Buro Happold Consulting Engineers $28,695,000
5 Burns & McDonnell $25,635,000
6 STV $21,121,000
7 Parsons Brinckerhoff $19,000,000
8 Clark Nexsen $18,141,790
9 Vanderweil Engineers $15,062,100
10 KJWW Engineering Consultants $13,554,873
11 KPFF Consulting Engineers $13,000,000
12 Dewberry $12,978,808
13 Arup $11,901,904
14 Simpson Gumpertz & Heger $10,000,000
15 Bard, Rao + Athanas Consulting Engineers $9,800,000
16 Eaton Energy Solutions $8,444,164
17 TTG $6,945,100
18 Wiss, Janney, Elstner Associates $6,920,000
19 Walker Parking Consultants $6,812,298
20 Bergmann Associates $6,780,000
21 Thornton Tomasetti $6,359,540
22 Interface Engineering $6,343,831
23 Newcomb & Boyd $6,203,693
24 Heapy Engineering $6,147,420
25 P2S Engineering $5,680,501
26 AKF Group $5,419,000
27 RMF Engineering Design $5,300,000
28 M/E Engineering $5,161,300
29 WSP USA $5,087,811
30 RDK Engineers $4,508,000
31 Shive-Hattery $4,264,381
32 Glumac $4,240,000
33 M-E Engineers $3,500,000
34 SSOE Group $3,332,322
35 H.F. Lenz $3,013,000
36 Joseph R. Loring & Associates $3,000,000
37 Spectrum Engineers $2,987,125
38 TLC Engineering for Architecture $2,944,786
39 Syska Hennessy Group $2,849,438
40 Science Applications International Corp. $2,559,263
41 Smith Seckman Reid $2,519,005
42 GRAEF $2,488,859
43 Rolf Jensen & Associates $2,400,000
44 Walter P Moore $2,396,672
45 Sparling $2,394,462
46 Stanley Consultants $2,322,986
47 Peter Basso Associates $2,300,000
48 KCI Technologies $2,100,000
49 Aon Fire Protection Engineering $2,000,000
49 Middough $2,000,000
51 CJL Engineering $1,896,957
52 Brinjac Engineering $1,811,357
53 Michael Baker Jr. $1,800,000
54 ThermalTech Engineering $1,800,000
55 Henderson Engineers $1,760,023
56 French & Parrello Associates $1,650,000
57 Ross & Baruzzini $1,510,533
58 Primera Engineers $1,489,000
59 Environmental Systems Design $1,418,526
60 Bala Consulting Engineers $1,350,000
61 Bridgers & Paxton Consulting Engineers $1,349,511
62 CTLGroup $1,100,000
63 Degenkolb Engineers $1,079,993
64 Mazzetti $1,038,952
65 Karpinski Engineering $1,037,079
66 Allen & Shariff $1,000,000
67 Dunham Associates $850,000
68 Paulus, Sokolowski and Sartor $800,000
69 Wallace Engineering $750,000
70 Haynes Whaley Associates $697,591
71 OLA Consulting Engineers $600,000
72 Wick Fisher White $585,140
73 GHT Limited $300,000
74 Magnusson Klemencic Associates $214,612
75 Kamm Consulting $126,305
76 Coffman Engineers $110,000
77 Davis, Bowen & Friedel $97,200
78 G&W Engineering $95,000
79 Total Building Commissioning $75,975
80 KLH Engineers $51,615
81 FBA Engineering $50,000
82 GRW $47,152
83 Guernsey $41,913
84 Apogee Consulting Group $14,000

 

Back to the University Sector Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

| Aug 11, 2010

Florida mixed-use complex includes retail, residential

The $325 million Atlantic Plaza II lifestyle center will be built on 8.5 acres in Delray Beach, Fla. Designed by Vander Ploeg & Associates, Boca Raton, the complex will include six buildings ranging from three to five stories and have 182,000 sf of restaurant and retail space. An additional 106,000 sf of Class A office space and a residential component including 197 apartments, townhouses, ...

| Aug 11, 2010

Restoration gives new life to New Formalism icon

The $30 million upgrade, restoration, and expansion of the Mark Taper Forum in Los Angeles was completed by the team of Rios Clementi Hale Studios (architect), Harley Ellis Devereaux (executive architect/MEP), KPFF (structural engineer), and Taisei Construction (GC). Work on the Welton Becket-designed 1967 complex included an overhaul of the auditorium, lighting, and acoustics.

| Aug 11, 2010

Best AEC Firms to Work For

2006 FreemanWhite Hnedak Bobo Group McCarthy Building Companies, Inc. Shawmut Design and Construction Walter P Moore 2007 Anshen+Allen Arup Bovis Lend Lease Cannon Design Jones Lang LaSalle Perkins+Will SmithGroup SSOE, Inc. Timothy Haahs & Associates, Inc. 2008 Gilbane Building Co. HDR KJWW Engineering Consultants Lord, Aeck & Sargent Mark G.

| Aug 11, 2010

High-Performance Workplaces

Building Teams around the world are finding that the workplace is changing radically, leading owners and tenants to reinvent corporate office buildings to compete more effectively on a global scale. The good news is that this means more renovation and reconstruction work at a time when new construction has stalled to a dribble.

| Aug 11, 2010

Great Solutions: Business Management

22. Commercial Properties Repositioned for University USE Tocci Building Companies is finding success in repositioning commercial properties for university use, and it expects the trend to continue. The firm's Capital Cove project in Providence, R.I., for instance, was originally designed by Elkus Manfredi (with design continued by HDS Architects) to be a mixed-use complex with private, market-...

| Aug 11, 2010

Nurturing the Community

The best seat in the house at the new Seahawks Stadium in Seattle isn't on the 50-yard line. It's in the southeast corner, at the very top of the upper bowl. "From there you have a corner-to-corner view of the field and an inspiring grasp of the surrounding city," says Kelly Kerns, project leader with architect/engineer Ellerbe Becket, Kansas City, Mo.

| Aug 11, 2010

AIA Course: Historic Masonry — Restoration and Renovation

Historic restoration and preservation efforts are accelerating throughout the U.S., thanks in part to available tax credits, awards programs, and green building trends. While these projects entail many different building components and systems, façade restoration—as the public face of these older structures—is a key focus. Earn 1.0 AIA learning unit by taking this free course from Building Design+Construction.

| Aug 11, 2010

BIM adoption tops 80% among the nation's largest AEC firms, according to BD+C's Giants 300 survey

The nation's largest architecture, engineering, and construction companies are on the BIM bandwagon in a big way, according to Building Design+Construction's premier Top 50 BIM Adopters ranking, published as part of the 2009 Giants 300 survey. Of the 320 AEC firms that participated in Giants survey, 83% report having at least one BIM seat license in house, half have more than 30 seats, and near...

| Aug 11, 2010

World's tallest all-wood residential structure opens in London

At nine stories, the Stadthaus apartment complex in East London is the world’s tallest residential structure constructed entirely in timber and one of the tallest all-wood buildings on the planet. The tower’s structural system consists of cross-laminated timber (CLT) panels pieced together to form load-bearing walls and floors. Even the elevator and stair shafts are constructed of prefabricated CLT.

| Aug 11, 2010

Integrated Project Delivery builds a brave, new BIM world

Three-dimensional information, such as that provided by building information modeling, allows all members of the Building Team to visualize the many components of a project and how they work together. BIM and other 3D tools convey the idea and intent of the designer to the entire Building Team and lay the groundwork for integrated project delivery.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021