Construction has begun Los Angeles County on what is being called the nation’s largest Net Zero Plus retrofit of a commercial building.
The transformation of the 142,000-sf Electrical Training Center—which was formally announced 11 months ago—should be completed by Spring 2016. (Its grand opening is scheduled for April 21—Earth Day of that year.)
It will be renamed the Net Zero Plus Electrical Training Institute, and the building will demonstrate the future of smart energy efficiency, microgrid system integration, energy storage solutions, resiliency in the wake of a natural disaster or grid interruption, and advanced lighting controls and automated building management systems.
The International Brotherhood of Electrical Workers Local 11, with more than 13,000 members; and the Los Angeles Chapter of the National Electrical Contractors Association, which represents more than 400 electrical contractors in Los Angeles and Ventura Counties, are investing $13 million into this retrofit. The General Contractor on this project is Santa Fe Springs, Calif.-based PDE Total Energy Solutions, and the Electrical Contractor is Chatsworth, Calif.-based O’Bryant Electric.
California’s latest construction codes call for all new commercial buildings to be built to net zero standards by 2030. To that end, the union and association have also launched their Net Zero Plus initiative to accelerate the shift toward a clean-energy economy. This initiative is intended to help the building industry improve grid reliability, implement energy storage solutions, as well as advance energy independence, security, and building control. The initiative also aims at reducing the environmental impacts of commercial buildings, reduce electricity costs, and provide better analytics.
The Training Center instructs over 4,000 apprentices and journeymen electricians annually. The retrofitted facility “will set the standard for training as a replicable model for other electrical training centers around the country,” said Marvin Kropke, the Local’s business manager.
Den Henrich, president of PDE Total Energy Solutions, estimates that the retrofit would reduce the building’s energy consumption by between 15% and 30%. The retrofit will include the installation of one megawatt of solar photovoltaic panels, with two arrays on the roof and two solar shade systems with a charging station in the parking lot.
The energy usage reduction is projected to be 250,000 kWh per year, and the building will have the capacity to produce about one megawatt of energy. The building is also expected to achieve a 28.5-ton annual reduction in CO2 emissions.
The training center is working with the Los Angeles Department of Water and Power to develop, test, and implement strategies that lead to the adoption of energy efficient technologies with the utility’s customers, said David Jadot, PE, LADWP’s director.
Related Stories
| Nov 9, 2010
Turner Construction report: Green buildings still on the agenda
Green buildings continue to be on the agenda for real estate owners, developers, and corporate owner-occupants, according to the Turner 2010 Green Building Market Barometer. Key findings: Almost 90% of respondents said it was extremely or very likely they would incorporate energy-efficiency improvements in their new construction or renovation project, and 60% expected to incorporate improvements to water efficiency, indoor environmental quality, and green materials.
| Nov 2, 2010
11 Tips for Breathing New Life into Old Office Spaces
A slowdown in new construction has firms focusing on office reconstruction and interior renovations. Three experts from Hixson Architecture Engineering Interiors offer 11 tips for office renovation success. Tip #1: Check the landscaping.
| Nov 2, 2010
A Look Back at the Navy’s First LEED Gold
Building Design+Construction takes a retrospective tour of a pace-setting LEED project.
| Nov 2, 2010
Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’
Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.
| Nov 1, 2010
Sustainable, mixed-income housing to revitalize community
The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.
| Nov 1, 2010
Vancouver’s former Olympic Village shoots for Gold
The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 12, 2010
University of Toledo, Memorial Field House
27th Annual Reconstruction Awards—Silver Award. Memorial Field House, once the lovely Collegiate Gothic (ca. 1933) centerpiece (along with neighboring University Hall) of the University of Toledo campus, took its share of abuse after a new athletic arena made it redundant, in 1976. The ultimate insult occurred when the ROTC used it as a paintball venue.
| Oct 12, 2010
Cell and Genome Sciences Building, Farmington, Conn.
27th Annual Reconstruction Awards—Silver Award. Administrators at the University of Connecticut Health Center in Farmington didn’t think much of the 1970s building they planned to turn into the school’s Cell and Genome Sciences Building. It’s not that the former toxicology research facility was in such terrible shape, but the 117,800-sf structure had almost no windows and its interior was dark and chopped up.