flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Trimble acquires Gehry Technologies, aims to create tools for linking office and job site

Trimble acquires Gehry Technologies, aims to create tools for linking office and job site

'This merger is a dream for me,' said Frank Gehry of the deal. Financial terms were not disclosed.


By Trimble | September 8, 2014
The Cleveland Clinic Abu Dhabi is one of Gehry Technologies' latest projects. Re
The Cleveland Clinic Abu Dhabi is one of Gehry Technologies' latest projects. Rendering: courtesy Gehry Technologies

Trimble and Frank Gehry announced today that they have entered into a strategic alliance to collaborate to transform the construction industry by further connecting the office to on-site construction technologies. 

As part of the alliance, Trimble has acquired Gehry Technologies, the software and consulting services business that has been instrumental in delivering Frank Gehry’s visionary designs while keeping cost and schedule in line for his clients.

The alliance combines deep Architecture, Engineering and Construction (AEC) industry experience with advanced construction technology to empower visionary designers such as Gehry Partners to build groundbreaking projects on time, under budget and without change orders—enabling designers, builders and operators to collaborate more efficiently. 

"This merger is a dream for me. In Trimble, we find a partner who has like-minded ambitions and goals to create efficiencies in the AEC industry that allow the creativity of the architectural profession to flourish and deliver value-added creative solutions within the realities of our economic times. I am very excited to expand our mission with a great new partner," said Frank Gehry.  

“We are honored to enter into an association with Frank,” said Steven W. Berglund, president and CEO of Trimble. “His unique architectural vision has always challenged the conventional. Equally impactful are his views on the potential for transforming the entire design-build-operate continuum. Gehry Technologies has been key in allowing Frank to realize the potential of his designs without compromising cost or schedule. Together, we expect that our common commitment and our combined capabilities will accelerate the adoption of technology in this trillion-dollar industry with resulting breakout benefits. We are delighted with the prospect of working with Frank as he continues his strong personal advocacy for change in the construction industry.” 

Based in Los Angeles, Calif., Gehry Technologies is an AEC technology company that provides design and project management solutions, consulting services and project collaboration software tools. Gehry Technologies solutions include GTeam™ software, a Web-based 3D file management and project collaboration platform, building information modeling (BIM) technology as well as advanced project delivery services for leading owners, architects, engineers, builders, fabricators and industry professionals worldwide. The solutions allow customers of all sizes to communicate more effectively, improve design and construction quality, and accelerate project cycle times.

Gehry Technologies’ consulting services aid in the design, execution and management of the build environment. With a globally distributed team of architects, engineers, builders and computer scientists, the company delivers solutions that define and optimize project delivery processes and tools, enabling creative architecture with integrated engineering, high-precision fabrication and assembly, and improved risk management.

The combination of Gehry Technologies solutions and professional services with Trimble’s broad technology portfolio in positioning, BIM, analytics and visualization, automated machine guidance and real-time telematics accelerates total lifecycle solutions that will allow architects, engineers, contractors and owners to access data captured during the building planning, design, construction and renovation phases, providing deeper insight, better operating decisions and better asset performance.

Gehry Technologies will be reported in Trimble's Engineering and Construction Segment. Financial terms were not disclosed.

Related Stories

| Apr 5, 2011

Top 10 Buildings: Women in Architecture

Making selections of top buildings this week led to a surprising discovery about the representation of women in architecture, writes Tom Mallory, COO and co-founder, OpenBuildings.com. He discovered that finding female-created architecture, when excluding husband/wife teams, is extremely difficult and often the only work he came across was akin to interior design.

| Apr 5, 2011

What do Chengdu, Lagos, and Chicago have in common?

They’re all “world middleweight cities” that are likely to become regional megacities (10 million people) by 2025—along with Dongguan, Guangzhou, Hangzhou, Shenzhen, Tianjin, and Wuhan (China); Kinshasa (Democratic Republic of the Congo); Jakarta (Indonesia); Lahore (Pakistan); and Chennai (India), according to a new report from McKinsey Global Institute: “Urban World: Mapping the economic power of cities”.

| Mar 30, 2011

China's low-carbon future city

In 2005, the Chinese government announced its target to reduce energy consumption per GDP unit by 20% by the year 2010. After a multi-billion investment, that target has been reached. The Chinese Climate Protection Program’s goal to increase energy efficiency, develop renewable energies, and promote energy savings while reducing pollutant emissions and strengthening environmental protection is reflected in the “Future City” by SBA Design.

| Mar 30, 2011

Is the AEC industry at risk of losing its next generation leaders without better mentoring?

After two or three horrifying years for the AEC industry, we are finally seeing the makings of a turnaround. However, data developed by Kermit Baker as part of the AIA Work-on-the-Boards survey program indicates that between 17% and 22% of design firms are eliminating positions for interns and staff with less than six years of experience. This data suggests the industry is at risk of losing a large segment of its next generation of leaders if something isn't done to improve mentoring across the profession.

| Mar 29, 2011

City's design, transit system can ease gas costs

Some cities in the U.S. are better positioned to deal with rising gas prices than others because of their design and transit systems, according to CEOs for Cities, a Chicago-based nonprofit that works to build stronger cities. The key factor: whether residents have to drive everywhere, or have other options.

| Mar 29, 2011

Chicago’s Willis Tower to become a vertical solar farm

Chicago’s iconic Willis Tower (formerly the Sears Tower) is set to become a massive solar electric plant with the installation of a pilot solar electric glass project.

| Mar 29, 2011

Read up on Amazon.com's new green HQ

Phase IV of Amazon’s new headquarters in Seattle is nearly complete. The company has built 10 of the 11 buildings planned for its new campus in the South Lake Union neighborhood, and is on-track for a 2013 grand opening.

| Mar 29, 2011

Portuguese architect Eduardo Souto de Moura wins Pritzker Architecture Prize

Portugese architect Eduardo Souto de Moura, whose precisely-honed buildings reflect the influence of the late Chicago modernist Mies van der Rohe, is the 2011 winner of the Pritzker Architecture Prize, the field's highest honor.

| Mar 25, 2011

Qatar World Cup may feature carbon-fiber ‘clouds’

Engineers at Qatar University’s Department of Mechanical and Industrial Engineering are busy developing what they believe could act as artificial “clouds,” man-made saucer-type structures suspended over a given soccer stadium, working to shield tens of thousands of spectators from suffocating summer temperatures that regularly top 115 degrees Fahrenheit.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021