Trimble and Frank Gehry announced today that they have entered into a strategic alliance to collaborate to transform the construction industry by further connecting the office to on-site construction technologies.
As part of the alliance, Trimble has acquired Gehry Technologies, the software and consulting services business that has been instrumental in delivering Frank Gehry’s visionary designs while keeping cost and schedule in line for his clients.
The alliance combines deep Architecture, Engineering and Construction (AEC) industry experience with advanced construction technology to empower visionary designers such as Gehry Partners to build groundbreaking projects on time, under budget and without change orders—enabling designers, builders and operators to collaborate more efficiently.
"This merger is a dream for me. In Trimble, we find a partner who has like-minded ambitions and goals to create efficiencies in the AEC industry that allow the creativity of the architectural profession to flourish and deliver value-added creative solutions within the realities of our economic times. I am very excited to expand our mission with a great new partner," said Frank Gehry.
“We are honored to enter into an association with Frank,” said Steven W. Berglund, president and CEO of Trimble. “His unique architectural vision has always challenged the conventional. Equally impactful are his views on the potential for transforming the entire design-build-operate continuum. Gehry Technologies has been key in allowing Frank to realize the potential of his designs without compromising cost or schedule. Together, we expect that our common commitment and our combined capabilities will accelerate the adoption of technology in this trillion-dollar industry with resulting breakout benefits. We are delighted with the prospect of working with Frank as he continues his strong personal advocacy for change in the construction industry.”
Based in Los Angeles, Calif., Gehry Technologies is an AEC technology company that provides design and project management solutions, consulting services and project collaboration software tools. Gehry Technologies solutions include GTeam™ software, a Web-based 3D file management and project collaboration platform, building information modeling (BIM) technology as well as advanced project delivery services for leading owners, architects, engineers, builders, fabricators and industry professionals worldwide. The solutions allow customers of all sizes to communicate more effectively, improve design and construction quality, and accelerate project cycle times.
Gehry Technologies’ consulting services aid in the design, execution and management of the build environment. With a globally distributed team of architects, engineers, builders and computer scientists, the company delivers solutions that define and optimize project delivery processes and tools, enabling creative architecture with integrated engineering, high-precision fabrication and assembly, and improved risk management.
The combination of Gehry Technologies solutions and professional services with Trimble’s broad technology portfolio in positioning, BIM, analytics and visualization, automated machine guidance and real-time telematics accelerates total lifecycle solutions that will allow architects, engineers, contractors and owners to access data captured during the building planning, design, construction and renovation phases, providing deeper insight, better operating decisions and better asset performance.
Gehry Technologies will be reported in Trimble's Engineering and Construction Segment. Financial terms were not disclosed.
Related Stories
| Dec 17, 2010
Luxury condos built for privacy
A new luxury condominium tower in Los Angeles, The Carlyle has 24 floors with 78 units. Each of the four units on each floor has a private elevator foyer. The top three floors house six 5,000-sf penthouses that offer residents both indoor and outdoor living space. KMD Architects designed the 310,000-sf structure, and Elad Properties was project developer.
| Dec 17, 2010
Subway entrance designed to exude Hollywood charm
The Hollywood/Vine Metro portal and public plaza in Los Angeles provides an entrance to the Red Line subway and the W Hollywood Hotel. Local architect Rios Clementi Hale Studio designed the portal and plaza to flow with the landmark theaters and plazas that surround it.
| Dec 17, 2010
New engineering building goes for net-zero energy
A new $90 million, 250,000-sf classroom and laboratory facility with a 450-seat auditorium for the College of Electrical and Computer Engineering at the University of Illinois at Urbana/Champaign is aiming for LEED Platinum.
| Dec 17, 2010
Vietnam business center will combine office and residential space
The 300,000-sm VietinBank Business Center in Hanoi, Vietnam, designed by Foster + Partners, will have two commercial towers: the first, a 68-story, 362-meter office tower for the international headquarters of VietinBank; the second, a five-star hotel, spa, and serviced apartments. A seven-story podium with conference facilities, retail space, restaurants, and rooftop garden will connect the two towers. Eco-friendly features include using recycled heat from the center’s power plant to provide hot water, and installing water features and plants to improve indoor air quality. Turner Construction Co. is the general contractor.
| Dec 17, 2010
Toronto church converted for condos and shopping
Reserve Properties is transforming a 20th-century church into Bellefair Kew Beach Residences, a residential/retail complex in The Beach neighborhood of Toronto. Local architecture firm RAWdesign adapted the late Gothic-style church into a five-story condominium with 23 one- and two-bedroom units, including two-story penthouse suites. Six three-story townhouses also will be incorporated. The project will afford residents views of nearby Kew Gardens and Lake Ontario. One façade of the church was updated for retail shops.
| Dec 17, 2010
ARRA-funded Navy hospital aims for LEED Gold
The team of Clark/McCarthy, HKS Architects, and Wingler & Sharp are collaborating on the design of a new naval hospital at Camp Pendleton in Southern California. The $451 million project is the largest so far awarded by the U.S. Navy under the American Recovery and Reinvestment Act. The 500,000-sf, 67-bed hospital, to be located on a 70-acre site, will include facilities for emergency and primary care, specialty care clinics, surgery, and intensive care. The Building Team is targeting LEED Gold.
| Dec 17, 2010
Arizona outpatient cancer center to light a ‘lantern of hope’
Construction of the Banner MD Anderson Cancer Center in Gilbert, Ariz., is under way. Located on the Banner Gateway Medical Center campus near Phoenix, the three-story, 131,000-sf outpatient facility will house radiation oncology, outpatient imaging, multi-specialty clinics, infusion therapy, and various support services. Cannon Design incorporated a signature architectural feature called the “lantern of hope” for the $90 million facility.
| Dec 17, 2010
Cladding Do’s and Don’ts
A veteran structural engineer offers expert advice on how to avoid problems with stone cladding and glass/aluminum cladding systems.
| Dec 17, 2010
5 Tips on Building with SIPs
Structural insulated panels are gaining the attention of Building Teams interested in achieving high-performance building envelopes in commercial, industrial, and institutional projects.
| Dec 17, 2010
How to Win More University Projects
University architects representing four prominent institutions of higher learning tell how your firm can get the inside track on major projects.