flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ULI report documents business case for building healthy projects

ULI report documents business case for building healthy projects

Sustainable and wellness-related design strategies embody a strong return on investment, according to a report by the Urban Land Institute.


By Urban Land Institute | April 11, 2014
ECO Modern Flats is a wellness-oriented apartment complex in Fayetteville, Ark.,
ECO Modern Flats is a wellness-oriented apartment complex in Fayetteville, Ark., created from reconstruction of a property built

The economic benefits of building healthy places are outlined in a new publication from the Urban Land Institute (ULI)Building for Wellness: The Business Case. Released this week at the ULI Spring Meeting in Vancouver, the report examines the investment payback on incorporating amenities that promote health and wellness, how developers have pursued this objective, and the resulting market response.

The report was prepared as part of ULI’s Building Healthy Places initiative, a two-year global program of work that seeks to raise awareness of the connections between health and the built environment, and to encourage the development of communities that are conducive to healthy living.   

Building for Wellness profiles 13 completed projects from around the world, including ten in the U.S., two in Asia Pacific and one in Europe, each representing one of three development strategies – renovation / redevelopment, new construction and master-planned communities. 

The report finds several common experiences across the developments examined:

  • Developers received a better-than-anticipated market response, and their expectations were exceeded in terms of leasing times, sales rates, rental and sales premiums and waiting lists.
  • The development costs attributable to the inclusion of wellness components were generally reported to be a minimal percentage of the overall development budget. Exceptions to this were limited to cases of highly amenitized master-planned communities, where the additional costs were partially offset by homebuilder and resale fees.
  • The operating expenses for the maintenance of wellness components were typically minimal, with these costs in master-planned communities being covered by homeowner fees. Expenses such as staff to market the wellness amenities at a business park or a full-time groundskeeper were considered worth the additional investment.
  • Programming, such as fitness classes, walking groups and wellness seminars, were widely used to offer additional opportunities as well as encourage the use of wellness facilities. An added perk: such programming can often be provided through partnerships with nonprofit organizations and local businesses.

Three of the projects featured – Selandra Rise in Casey, Australia; Mueller in Austin, Texas; and Park 20 I 20 in Haarlemmermeer, Netherlands – are currently under study by universities and foundations regarding their impact on workers’ and residents’ health. Two universities have previously concluded that Mueller residents increased their physical activity by 40 to 50 minutes per week after moving into the development 

“To improve the well-being of our communities, we need to demonstrate that building for wellness makes good business sense,” said ULI Chief Executive Officer Patrick L. Phillips. “Building for Wellness: The Business Case outlines clear examples of how developers have built exemplary projects that help improve the health of their users, without incurring prohibitive additional costs and with the benefit of improving the commercial performance of their investment.”

Projects profiled include:

  • The Century Building in Pittsburgh, Penn.  – An example of redevelopment, the project opened in 2009 with 60 workforce and market-rate apartments, 12,000 square feet of office space and 10,000 square feet of retail. Located in the downtown area, the development was the first in the city to achieve LEED Gold certification and has a Walk Score® rating of 100, indicating the location is a “walker’s paradise”.

About 15 percent of the construction budget was allocated to sustainable and wellness features. Clean indoor air was ensured through a non-smoking policy, use of non-toxic building materials, a geothermal heating system and a recovery ventilation system which have led to residents with asthma and allergies claiming their condition has improved since moving to the building. Secure bicycle storage is included for use by residents and office tenants, as well as an onsite fitness center.

The business case: the project was fully leased within 90 days, six months ahead of its original schedule, and it maintains a remarkably high 90-percent retention rate. Ongoing maintenance costs for features such as the fitness center and bicycle storage are minimal.   

  • Park 20 I 20 in Haarlemmermeer in the Netherlands  -- A new development, the project is located on an 11 hectare (28 acre) site approximately 8 kilometers (5 miles) outside of Amsterdam. The first phase of a mixed-use business park, it was completed in April 2013, with additional phases to be completed by 2018. The project is only 100 meters (330 feet) from train and bus transit, and with a Walk Score® rating of 72, it is considered to be a “very walkable” location.

The development’s buildings ensure clean indoor air by maximizing air circulation, eliminating traditional ductwork, providing operable windows and incorporating green walls. The shapes of the buildings maximize natural light, and artificial light is provided through LEDs, which are the closest alternative to sunlight. Park 20 I 20 is a car-free site, with multiple walking and biking paths across the development; and it provides access to offsite fitness facilities. The development also included onsite greenhouses that are used to grow food used in the onsite restaurant.

The business case: a project that is currently 100-percent leased at rates of €200 per square meter, representing a premium of 12 percent over local Class A new office buildings. Phase II of the office buildings is also 100-percent pre-leased.

  • Selandra Rise in Casey, Australia – A master-planned community on 115 hectares (284 acres) in the city of Casey, which is 50 kilometers (30 miles) south of Melbourne. It incorporates 65 townhouses and 793 two, three, four and five detached houses. The first phase, completed in 2011, features a range of health and wellness features.

All homes are within 300 meters of parkland and trails, providing easy pedestrian and bicycle access to small pocket parks, and larger destination parks, as well as an outdoor fitness station. Reliance on cars is reduced by the inclusion of bike lanes and tree-lined sidewalks with a “way-finding” system designed to show how quickly people can walk or cycle to their destination. A community facility centrally located in the development arranges up to 30 programs per month to promote a healthy lifestyle and social interaction.

The business case: Selandra Rise is the fastest selling community project in Australia with prices averaging $7,000 to $12,000 (in Australian dollars) higher than competitor projects. The cost of wellness components was only one to two percent of the total project cost, and operating costs are similar to those of the developer’s other projects.  

In addition to the Century Building, Park 20 I 20 in Haarlemmermeer, and Selandra Rise, other developments profiled in the publication are: ECO Modern Flats in Fayetteville, Ark.; Innovation Park, Charlotte, N.C.; 1221 Broadway, San Antonio, Texas; Jackson Walk, Jackson, Tenn.; Via6, Seattle, Wash.; The Interlace, Singapore; Via Verde, New York, N.Y.; Grow Community, Bainbridge Island, Wash.; Rancho Sahuarita, Tucson, Ariz.; and Mueller, Austin, Texas.

Copies of Building for Wellness are now available for download.

Related Stories

Sponsored | BD+C University Course | Jan 17, 2024

Waterproofing deep foundations for new construction

This continuing education course, by Walter P Moore's Amos Chan, P.E., BECxP, CxA+BE, covers design considerations for below-grade waterproofing for new construction, the types of below-grade systems available, and specific concerns associated with waterproofing deep foundations.

Sponsored | Performing Arts Centers | Jan 17, 2024

Performance-based facilities for performing arts boost the bottom line

A look at design trends for “budget-wise” performing arts facilities reveals ways in which well-planned and well-built facilities help performers and audiences get the most out of the arts. This continuing education course is worth 1.0 AIA learning unit.

Giants 400 | Jan 15, 2024

Top 130 Hospital Facility Architecture Firms for 2023

HKS, HDR, Stantec, CannonDesign, and Page Southerland Page top BD+C's ranking of the nation's largest hospital facility architecture and architecture engineering (AE) firms for 2023, as reported in the 2023 Giants 400 Report.

Airports | Jan 15, 2024

How to keep airports functional during construction

Gensler's aviation experts share new ideas about how to make the airport construction process better moving forward.

Adaptive Reuse | Jan 12, 2024

Office-to-residential conversions put pressure on curbside management and parking

With many office and commercial buildings being converted to residential use, two important issues—curbside management and parking—are sometimes not given their due attention. Cities need to assess how vehicle storage, bike and bus lanes, and drop-off zones in front of buildings may need to change because of office-to-residential conversions.

MFPRO+ News | Jan 12, 2024

As demand rises for EV chargers at multifamily housing properties, options and incentives multiply

As electric vehicle sales continue to increase, more renters are looking for apartments that offer charging options.

Student Housing | Jan 12, 2024

UC Berkeley uses shipping containers to block protestors of student housing project

The University of California at Berkeley took the drastic step of erecting a wall of shipping containers to keep protestors out of a site of a planned student housing complex. The $312 million project would provide badly needed housing at the site of People’s Park. 

Giants 400 | Jan 12, 2024

Top 10 Casino Architecture Firms for 2023

JCJ Architecture, HBG Design, Gensler, and WATG top BD+C's ranking of the nation's largest casino architecture and architecture engineering (AE) firms for 2023, as reported in the 2023 Giants 400 Report.

Senior Living Design | Jan 11, 2024

Designing for personal technology is crucial for senior living facilities

Today’s seniors are increasingly tech savvy. It isn’t enough to give senior living residents a pre-determined bundle of technology and assume that they’ll be satisfied.

Giants 400 | Jan 11, 2024

Top 40 Convention Center Architecture Firms for 2023

TVS, Populous, Arcadis North America, Gensler, and EUA top BD+C's ranking of the nation's largest convention center and event facility architecture and architecture engineering (AE) firms for 2023, as reported in the 2023 Giants 400 Report.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021