flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

UMass Medical School’s new Education and Research Building

University Buildings

UMass Medical School’s new Education and Research Building

ZGF and ARC/Architectural Resources Cambridge are designing the project.


By David Malone, Associate Editor | May 4, 2021
UMass Education and Research building exterior

Renderings courtesy ZGF

The new Education and Research Building, a nine-story biomedical research building at the University of Massachusetts Medical School, will support the development of therapeutics for some of the world’s most challenging diseases in a high-performance, sustainable environment.

The 350,000-sf facility will include space for 77 principal investigators and house the Medical School’s Horae Gene Therapy Center, the Departments of Neurology and Neurobiology, the Program in Molecular Medicine, a new Program in Human Genetics & Evolutionary Biology, and an FDA-compliant manufacturing facility for clinical trial therapeutics.

 

UMass education and research building circulation and gathering space

 

The project is being designed to meet ambitious sustainability goals, including achieving Net Zero Energy and LEED Gold certification and the integration of a high-performance double-skin facade and geothermal heat pumps. The interior features natural daylighting and transparency, active circulation, and large social and interaction spaces.

The project is slated to open in the fall of 2023. Shawmut Design and Construction will be the project’s construction manager.

 

UMass Education and Research Building lab space

Related Stories

| Nov 13, 2012

Have colleges + universities gone too far with "Quality of Life" buildings?

We'd like your input - recent projects, photo/s, renderings, and expert insight - on an important article we're working on for our Jan 2013 issue

| Nov 11, 2012

Greenbuild 2012 Report: Higher Education

More and more colleges and universities see sustainainably designed buildings as a given

| Oct 30, 2012

Lord, Aeck & Sargent announces four student life facility wins

Projects recognize the architecture firm’s expertise on a nationwide basis.

| Oct 4, 2012

2012 Reconstruction Awards Gold Winner: Wake Forest Biotech Place, Winston-Salem, N.C.

Reconstruction centered on Building 91.1, a historic (1937) five-story former machine shop, with its distinctive façade of glass blocks, many of which were damaged. The Building Team repointed, relocated, or replaced 65,869 glass blocks.

| Sep 19, 2012

Modular, LEED-Gold Certified Dormitory Accommodates Appalachian State University Growth

By using modular construction, the university was able to open a dorm a full year earlier than a similar dorm built at the same time with traditional construction.

| Sep 6, 2012

CPPI awarded $30.3 million contract for University of Florida’s Harrell Medical Education Building

The specialized interdisciplinary learning environment will serve as a focal point for integration and program development for all primary care educational activities in the College of Medicine.

| Sep 5, 2012

Skanska tops out residence hall complex at the University of Delaware

Construction firm achieves structural milestone for $71 million student housing expansion project.

| Aug 30, 2012

John S Clark Co. completes teaching lab at UNC Wilmington

Three-story building provides offices, classrooms, and labs.

| Aug 7, 2012

Pioneering revival

Financial setbacks didn’t stop this Building Team from transforming the country’s first women’s medical school into a new home for college students.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021