flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Under Armour unveils phase one of 50-acre Baltimore headquarters

Office Buildings

Under Armour unveils phase one of 50-acre Baltimore headquarters

The campus will be located in Baltimore’s $5.5 billion Port Covington redevelopment project.


By David Malone, Associate Editor | November 15, 2016

Rendering courtesy of Under Armour

The first phase of Under Armour’s new Baltimore Headquarters has officially been revealed. The plans were shown to Baltimore’s Urban Design and Architecture Review Panel, Bizjournals.com reports.

Included in the first phase are two office buildings and a 1,500-space parking garage. The garage will provide over 306,000 sf across 11 floors. Three of the floors will be set aside for use by visitors with the remaining eight used for employees.

The office buildings will hold 1,500 employees, though it is not yet known which divisions or departments these employees will come from, and will sit on vacant land near a closed Sam’s Club that has been converted to Under Armour offices.

Some members of the panel were worried the first phase’s parking garage, which could measure 120-feet tall and 800-feet wide, will be too large and “monolithic.” One panelist suggested splitting the building into two or redesigning the façade and staggering it in order to break up the huge building. Another panelist was worried the garage would block public access to the nearby Ferry Bar Park.

While the overall cost of the project is unknown and details are still sparse, what is known is that the new headquarters will reside in the $5.5 billion redevelopment of Port Covington, which will total around 4 million sf.

Sagamore Development Co., the private real estate arm of Kevin Plank, Under Armour’s CEO, is developing the campus and the surrounding infrastructure of Port Covington. In order to help pay for the infrastructure of the Port Covington project, Sagamore has received $660 million in tax-increment financing. Sagamore will reimburse the city for the bonds via taxes in the future.

A 100,000-sf manufacturing plant, field house, park, and 3 million sf of office space will all be included in the Port Covington development.

Related Stories

Mixed-Use | Dec 12, 2017

A new live/work neighborhood is about to get under way in Omaha, Neb.

Walkability and recreation will be key features of West Farm.

Office Buildings | Nov 6, 2017

Battle for 50K: Amazon HQ2 pushes cities to rethink urban development

In using an open RFP process with a tight timeline, Amazon created a frenzied, almost hackathon-like atmosphere that it hoped would spark next-level creativity when it comes to urban redevelopment.

Adaptive Reuse | Oct 23, 2017

A tableware storage space is reset to accommodate an investment firm’s headquarters in Raleigh, N.C.

This adaptive reuse establishes more direct visual and physical connections to a growing city. 

Office Buildings | Oct 20, 2017

Hybridization of the co-working experience

Exploring potential innovations for the co-working industry.

Giants 400 | Oct 19, 2017

Race for talent drives office designs

Is the shift toward attracting younger workers too much or not enough?

Giants 400 | Oct 18, 2017

Top 105 office construction firms

Turner Construction Co., Structure Tone, and Holder Construction top BD+C’s ranking of the nation’s largest office sector contractors and construction management firms, as reported in the 2017 Giants 300 Report.

Giants 400 | Oct 17, 2017

Top 60 office engineering firms

AECOM, WSP, and Thornton Tomasetti top BD+C’s ranking of the nation’s largest office sector engineering and EA firms, as reported in the 2017 Giants 300 Report.

Giants 400 | Oct 17, 2017

Top 110 office architecture firms

Gensler, Jacobs, and HOK top BD+C’s ranking of the nation’s largest office sector architecture and AE firms, as reported in the 2017 Giants 300 Report.

Reconstruction & Renovation | Sep 28, 2017

Plans for Chicago’s historic Post Office building revealed by 601W Companies and Gensler

The redevelopment project is currently the largest in the nation.

boombox1
boombox2
native1

More In Category



Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.


MFPRO+ News

San Francisco unveils guidelines to streamline office-to-residential conversions

The San Francisco Department of Building Inspection announced a series of new building code guidelines clarifying adaptive reuse code provisions and exceptions for converting office-to-residential buildings. Developed in response to the Commercial to Residential Adaptive Reuse program established in July 2023, the guidelines aim to increase the viability of converting underutilized office buildings into housing by reducing regulatory barriers in specific zoning districts downtown. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021