flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

University of Louisville Student Success Building will be new heart of engineering program

University Buildings

University of Louisville Student Success Building will be new heart of engineering program

The 115,000-sf structure will expand lab space, consolidate functions


By Peter Fabris, Contributing Editor | July 17, 2024
University of Louisville's J.B. Speed School of Engineering Student Success Building. Rendering courtesy SmithGroup
University of Louisville's J.B. Speed School of Engineering Student Success Building. Rendering courtesy SmithGroup

A new Student Success Building will serve as the heart of the newly designed University of Louisville’s J.B. Speed School of Engineering. The 115,000-sf structure will greatly increase lab space and consolidate student services to one location.

Currently admissions counselors, academic counselors, tutors, student success coordinators, co-op counselors, and other support teams are located on different floors and in multiple buildings. The plan groups all the support teams into a single connected office suite. A central help desk at the main entrance will assist students to receive the most appropriate support services. Shared collaborative spaces will facilitate regular meetings among the different teams, and shared office support will streamline internal operations.

The new university building will serve as a valuable “home base” for students, especially during their first year. It will house classes, provide access to tutoring, enable meetings with academic and co-op counselors, host student success seminars, offer study spaces and meeting rooms for student groups, and feature an informal recreational area.

Maker space at University of Louisville's J.B. Speed School of Engineering Student Success Building. Rendering courtesy SmithGroup
Maker space at the University of Louisville's J.B. Speed School of Engineering Student Success Building. Rendering courtesy SmithGroup

An engineering garage space will serve as a hub for hands-on learning and competition team activities. This area will provide ample room for students to work on projects, build prototypes, and conduct experiments. It will be equipped with specialized tools, machinery, and materials to support various engineering disciplines. The garage space will not only enhance students’ technical skills but also promote teamwork, collaboration, and problem-solving abilities. Engineering students will have the opportunity to participate in competitions, where they can apply their knowledge, learn from their peers, and showcase their innovations.

The second and third floors will house lab space for the university’s Conn Center for Renewable Energy Research, where researchers will study solar power, green fuels, and materials. Construction is underway, with an expected completion date of summer 2025.

Owner and/or developer: University of Louisville
Design architect: SmithGroup
Architect of record: Luckett & Farley
MEP engineer: Luckett & Farley
Structural engineer: SmithGroup
General contractor/construction manager: Whittenberg Construction

University of Louisville's J.B. Speed School of Engineering Student Success Building. Rendering courtesy SmithGroup
Rendering courtesy SmithGroup
University of Louisville's J.B. Speed School of Engineering Student Success Building. Rendering courtesy SmithGroup
Rendering courtesy SmithGroup
University of Louisville's J.B. Speed School of Engineering Student Success Building. Rendering courtesy SmithGroup
Rendering courtesy SmithGroup
University of Louisville's J.B. Speed School of Engineering Student Success Building. Rendering courtesy SmithGroup
Rendering courtesy SmithGroup
University of Louisville's J.B. Speed School of Engineering Student Success Building. Rendering courtesy SmithGroup
Rendering courtesy SmithGroup
University of Louisville's J.B. Speed School of Engineering Student Success Building. Rendering courtesy SmithGroup
Rendering courtesy SmithGroup

Related Stories

University Buildings | Jan 6, 2020

Making it: Gen Z learns by doing

This fundamental shift in learning style will have an impact on higher-education space planning.

University Buildings | Dec 17, 2019

Two LMN Architects-designed academic science buildings move forward for completion next year

These facilities will bring several disciplines under one roof.

University Buildings | Dec 12, 2019

HOK will design the Florida Gators new football facility

The facility will be named after longtime donor to the University of Florida and the University Athletic Association James W. “Bill” Heavener.

Wood | Dec 6, 2019

The University of Arkansas is now home to America’s largest mass timber building

A design collaborative led by Leers Weinzapfel Associates, Modus Studio, Mackey Mitchell Architects, and OLIN designed the project.

University Buildings | Nov 1, 2019

Design unveiled for the University of Maryland’s School of Public Policy building

LEO A DALY, in association with VJAA, designed the building.

University Buildings | Oct 28, 2019

Eight projects showcase the latest trends in student housing

Join us on a tour of select student residences at some of America’s top four-year colleges and universities.

University Buildings | Sep 30, 2019

UMass Amherst’s Worcester Commons to be built on an existing parking lot

Shawmut, in partnership with Perry Dean Rogers and Connor Architecture, are designing the project.

University Buildings | Sep 23, 2019

Engineering Innovation Hub completes on SUNY New Paltz campus

Urbahn Architects designed the project.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021