flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The U.S. construction pipeline remains robust through the first half of 2020, despite pandemic

Market Data

The U.S. construction pipeline remains robust through the first half of 2020, despite pandemic

Projects currently under construction stand at 1,771 projects/235,467 rooms, up 3% and 1% respectively, YOY.


By Lodging Econometrics | July 27, 2020

Courtesy Pixabay

Analysts at Lodging Econometrics (LE) report that at the close of the second quarter of 2020, the total U.S. hotel construction pipeline stands at 5,582 projects/687,801 rooms, down a mere 1% by projects and rooms, Year-Over-Year (YOY). Remarkably, despite some project cancelations, postponements, and delays, there has been minimal impact on the U.S. construction pipeline. Contrary to what is being experienced with hotel operations, the pipeline remains robust as interest rates are at all-time lows. 

Projects currently under construction stand at 1,771 projects/235,467 rooms, up 3% and 1% respectively, YOY. Projects scheduled to start construction in the next 12 months total 2,389 projects/276,247 rooms. Projects in the early planning stage stand at 1,422 projects/176,087 rooms. As expected, developers with projects under construction are still experiencing some opening delays. However, projects continue to move forward, albeit with extended timelines. As was the case at the end of the first quarter, developers with projects scheduled to start construction in the next 12 months continue to monitor current events and make adjustments to their construction start and opening dates. 

In the first half of 2020, the U.S. opened 313 new hotels with 36,992 rooms. Additionally, there were 481 new projects with 56,823 rooms announced into the pipeline in the first half of 2020. Of those totals, 169 new project announcements with 20,359 rooms occurred in the second quarter. With franchise development staff largely working from home, non-essential travel halted, and with the on-going pandemic, the ability to get a new development deal signed has slowed. This has resulted in a 53% decrease in new project announcements compared to the second quarter of 2019 when 359 projects/44,895 rooms were recorded. 

With the arrival of summer, the country has begun to see an uptick in domestic leisure travel. As a result, more and more hotels are re-opening, and many others have begun to move-up renovation plans and/or are repositioning their property with a brand conversion. In the first half of 2020, LE recorded 1,465 active renovation projects/314,043 rooms and 1,196 active conversion projects/136,110 rooms throughout the United States.

Related Stories

Market Data | Sep 3, 2020

6 must reads for the AEC industry today: September 3, 2020

New affordable housing comes to the Bronx and California releases guide for state water policy.

Market Data | Sep 2, 2020

Coronavirus has caused significant construction project delays and cancellations

Yet demand for skilled labor is high, new survey finds.

Market Data | Sep 2, 2020

5 must reads for the AEC industry today: September 2, 2020

Precast concrete tower honors United AIrlines Flight 93 victims and public and private nonresidential construction spending slumps.

Market Data | Sep 2, 2020

Public and private nonresidential construction spending slumps in July

Industry employment declines from July 2019 in two-thirds of metros.

Market Data | Aug 31, 2020

5 must reads for the AEC industry today: August 31, 2020

The world's first LEED Platinum integrated campus and reopening campus performance arts centers.

Market Data | Aug 21, 2020

5 must reads for the AEC industry today: August 21, 2020

Student housing in the COVID-19 era and wariness of elevators may stymie office reopening.

Market Data | Aug 20, 2020

6 must reads for the AEC industry today: August 20, 2020

Japan takes on the public restroom and a look at the evolution of retail.

Market Data | Aug 19, 2020

6 must reads for the AEC industry today: August 19, 2020

July architectural billings remained stalled and Florida becomes third state to adopt concrete repair code.

Market Data | Aug 18, 2020

July architectural billings remained stalled

Clients showed reluctance to sign contracts for new design projects during July.

Market Data | Aug 18, 2020

Nonresidential construction industry won’t start growing again until next year’s third quarter

But labor and materials costs are already coming down, according to latest JLL report.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021