flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

U.S. hotel construction is booming, with a record-high 5,964 projects in the pipeline

Hotel Facilities

U.S. hotel construction is booming, with a record-high 5,964 projects in the pipeline

The hotel construction pipeline hit record project counts at Q4, with the addition of 260 projects and 21,287 rooms over last quarter, according to Lodging Econometrics.


By Lodging Econometrics | January 22, 2024
U.S. hotel construction is booming, with a record-high 5,964 projects in the pipeline - Photo by The Anam on Unsplash
Photo by The Anam on Unsplash

According to the 2023 year-end U.S. Construction Pipeline Trend Report from Lodging Econometrics (LE), the pipeline stands at 5,964 projects/693,963 rooms. The pipeline hit record project counts at Q4, with the addition of 260 hotel construction projects and 21,287 rooms over last quarter, and a 9% increase by projects and a 7% increase by rooms year-over-year (YOY). The previous project count high was Q2 2008 with 5,883 projects.

At the close of 2023’s fourth quarter, there are 1,118 projects/141,768 rooms under construction, up 11% by projects and 5% by rooms YOY. Hotel projects scheduled to start within the next 12 months stand at 2,259 projects/261,582 rooms, up 9% by projects and 11% by rooms YOY. Projects and rooms in the early planning stage hit all-time highs at Q4, standing at 2,587 projects/290,613 rooms, and up 9% by projects and 4% by rooms YOY.


RELATED CONTENT:


Notably, the number of combined hotel renovations and brand conversion projects in the U.S. continued its upward growth trend through the end of 2023, closing the year with record project and room counts of 2,028 projects/303,330 rooms.

The upper midscale segment has the highest project count of all chain scales in the total U.S. hotel construction pipeline at the Q4 close, reaching an all-time high of 2,245 projects/218,112 rooms. The second largest is the upscale category, which has 1,445 projects/177,999 rooms. Together, these two chain scales comprise 62% of all projects in the country’s total pipeline at the Q4 close.

Rate cuts point to positive but cautious outlook for hotel construction

The recent Federal Reserve signaling of three 25-basis-point interest rate cuts in 2024 and additional cuts in 2025 sends a positive but cautious outlook for U.S. hotel development in the year ahead. With the anticipation of multiple rate cuts in 2024, hotel development seems poised for constructive growth well beyond 2024. The primary reason lies in less expensive borrowing costs, providing long-awaited relief on interest rates. This is expected to have a favorable impact not only on new construction but acquisitions, renovations, and conversions as well.

Despite the positive outlook, lenders continue to be vigilant, and many investors continue with a “wait and see” attitude; holding out hope for potentially deeper rate cuts. We expect this cautious, yet optimistic approach will continue through 2024, however, we expect to see investors re-engaging, which, as we can tell by the pipeline numbers and record-high project counts, has already begun. We expect lending volume to increase slowly in the first half of 2024 and then gradually pick up the pace in the second half of the year.

In 2023, the U.S. had 474 new hotels/60,436 rooms open, a 1.1% growth rate in new supply, bringing the total U.S. census to 59,636 hotels/5,655,356 rooms. In 2024, LE analysts expect the existing supply of hotels in the U.S. to increase 1.4% with the opening of 677 new hotels and 79,518 rooms. The LE forecast for new hotel openings shows this growth trajectory will continue through 2025, with another 799 new hotels/85,654 rooms forecast to open by year-end 2025 and further growth anticipated for 2026 and beyond.

Related Stories

| Aug 11, 2010

Colorado hospital wins LEED Gold

The main building of the Medical Center of the Rockies in Loveland, Colo., is a 136-bed regional medical center offering a full spectrum of services, with specialties in cardiac and trauma care. Constructed primarily of brick, native sandstone, and 85,000 sf of metal panels manufactured by Centria, the 600,000-sf main building, by Denver-based HLM Design, is one of the few hospitals in the nati...

| Aug 11, 2010

Design ups comfort, care in cancer center

A new cancer center is slated to open in fall 2011 at Banner Gateway Medical Center, Gilbert, Ariz. The three-story, 120,000-sf, $107 million cancer center will contain physician clinics, medical imaging, radiation oncology, infusion therapy, and support services. A/E firm Cannon Design has created a visually open, column-free interior to increase patient comfort and care.

| Aug 11, 2010

Charlotte hospital expands its surgery capabilities

The Chicago office of RTKL designed Carolinas HealthCare System's Mercy Medical Plaza, Charlotte, N.C. The 150,000-sf hospital houses 12 operating rooms with expanded pre-operative and recovery space, a pharmacy, and a central sterile processing unit. Tenant space occupies 75,000 sf. RTKL mimicked the materials and mass of older buildings on the campus but created a more modern look by using ex...

| Aug 11, 2010

And the world's tallest building is…

At more than 2,600 feet high, the Burj Dubai (right) can still lay claim to the title of world's tallest building—although like all other super-tall buildings, its exact height will have to be recalculated now that the Council on Tall Buildings and Urban Habitat (CTBUH) announced a change to its height criteria.

| Aug 11, 2010

Spa resort in harmony with mountain setting

The Sparkling Hill Resort and Wellness Hotel in Vernon, B.C., looks as if it was chiseled out of bedrock and jutting from the mountainside. Designed by the Victoria, B.C., office of Cannon Design, the 240,000-sf resort has 152 guest rooms with floor-to-ceiling windows and spa-like bathrooms, as well as a signature 20,000-sf whole-body wellness spa with treatment rooms designed to feel like they...

| Aug 11, 2010

Triangular tower targets travelers

Chicago-based Goettsch Partners is designing a new mixed-use high-rise for the Chinese city of Dalian, located on the Yellow Sea coast. Developed by Hong Kong-based China Resources Land Limited, the tower will have almost 1.1 million sf, which includes a 377-room Grand Hyatt hotel, 84 apartments, three restaurants, banquet space, and a spa and fitness center.

| Aug 11, 2010

Expanding retail complex is LEED pre-certified

The Promenade at Coconut Creek in Broward County, Fla., a live-work-play shopping and lifestyle center, is being expanded by 105,000 sf. When phase II of the 335,000-sf project is complete, the facility will house 75 retailers, restaurants, and related services, making it one of the largest mixed-use projects in northern Broward County.

| Aug 11, 2010

CityCenter projects get LEED Gold

MGM Mirage and Infinity World Development have received LEED Gold certification for the first three CityCenter projects: the ARIA Resort hotel tower, ARIA Resort convention center and theater, and the Vdara Hotel (above). The CityCenter developers anticipate Gold or Silver LEED certification for the project's remaining developments, which include a Mandarin Oriental hotel, a 500,000-sf retail a...

| Aug 11, 2010

Philadelphia cancer center seeks LEED certification

The New York office of Thornton Tomasetti provided structural engineering services for the Ruth and Raymond Perelman Center for Advanced Medicine in Philadelphia, a $232 million medical research center and advanced treatment center for cancer and cardiovascular disease. Designed by a joint venture of Perkins Eastman Architects and Rafael Vinõly Architects, the 340,000-sf facility will hous...

| Aug 11, 2010

High-level NICU opens in Washington, D.C.

Design to the highest distinction available by the American Academy of Pediatrics, the new Level IIIC neonatal intensive care unit (NICU) at Children's National Medical Center in Washington D.C., is equipped to care for the sickest premature babies, including those that require open-heart surgery. The 54-bed facility, designed by Karlsberger with KLMK Group as space planner, is four times large...

boombox1
boombox2
native1

More In Category



3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021