According to the 2023 year-end U.S. Construction Pipeline Trend Report from Lodging Econometrics (LE), the pipeline stands at 5,964 projects/693,963 rooms. The pipeline hit record project counts at Q4, with the addition of 260 hotel construction projects and 21,287 rooms over last quarter, and a 9% increase by projects and a 7% increase by rooms year-over-year (YOY). The previous project count high was Q2 2008 with 5,883 projects.
At the close of 2023’s fourth quarter, there are 1,118 projects/141,768 rooms under construction, up 11% by projects and 5% by rooms YOY. Hotel projects scheduled to start within the next 12 months stand at 2,259 projects/261,582 rooms, up 9% by projects and 11% by rooms YOY. Projects and rooms in the early planning stage hit all-time highs at Q4, standing at 2,587 projects/290,613 rooms, and up 9% by projects and 4% by rooms YOY.
RELATED CONTENT:
Notably, the number of combined hotel renovations and brand conversion projects in the U.S. continued its upward growth trend through the end of 2023, closing the year with record project and room counts of 2,028 projects/303,330 rooms.
The upper midscale segment has the highest project count of all chain scales in the total U.S. hotel construction pipeline at the Q4 close, reaching an all-time high of 2,245 projects/218,112 rooms. The second largest is the upscale category, which has 1,445 projects/177,999 rooms. Together, these two chain scales comprise 62% of all projects in the country’s total pipeline at the Q4 close.
Rate cuts point to positive but cautious outlook for hotel construction
The recent Federal Reserve signaling of three 25-basis-point interest rate cuts in 2024 and additional cuts in 2025 sends a positive but cautious outlook for U.S. hotel development in the year ahead. With the anticipation of multiple rate cuts in 2024, hotel development seems poised for constructive growth well beyond 2024. The primary reason lies in less expensive borrowing costs, providing long-awaited relief on interest rates. This is expected to have a favorable impact not only on new construction but acquisitions, renovations, and conversions as well.
Despite the positive outlook, lenders continue to be vigilant, and many investors continue with a “wait and see” attitude; holding out hope for potentially deeper rate cuts. We expect this cautious, yet optimistic approach will continue through 2024, however, we expect to see investors re-engaging, which, as we can tell by the pipeline numbers and record-high project counts, has already begun. We expect lending volume to increase slowly in the first half of 2024 and then gradually pick up the pace in the second half of the year.
In 2023, the U.S. had 474 new hotels/60,436 rooms open, a 1.1% growth rate in new supply, bringing the total U.S. census to 59,636 hotels/5,655,356 rooms. In 2024, LE analysts expect the existing supply of hotels in the U.S. to increase 1.4% with the opening of 677 new hotels and 79,518 rooms. The LE forecast for new hotel openings shows this growth trajectory will continue through 2025, with another 799 new hotels/85,654 rooms forecast to open by year-end 2025 and further growth anticipated for 2026 and beyond.
Related Stories
| Aug 11, 2010
Manhattan's Gouverneur Healthcare Services tops out renovation, expansion
One year after breaking ground, the Building Team for the renovation and expansion of the Gouverneur Healthcare Services facility on Manhattan's Lower East Side topped out the $180 million project. Designed by New York-based RMJM, the development involves a 316,000-sf renovation and 108,000-sf addition that will house a 295-bed nursing facility and five-story ambulatory care center.
| Aug 11, 2010
Decline expected as healthcare slows, but hospital work will remain steady
The once steady 10% growth rate in healthcare construction spending has slowed, but hasn't entirely stopped. Spending is currently 1.7% higher than the same time last year when construction materials costs were 8% higher. The 2.5% monthly jobsite spending decline since last fall is consistent with the decline in materials costs.
| Aug 11, 2010
Luxury Hotel required faceted design
Goettsch Partners, Chicago, designed a new five-star, 214-room hotel for the King Abdullah Financial District (KAFD) in Riyadh, Saudi Arabia. The design-build project, with Saudi Oger Ltd. as contractor and Rayadah Investment Co. as developer, has a three-story podium supporting a 17-story glass tower with a nine-story opening that allows light to penetrate the mass of the building.
| Aug 11, 2010
Alabama hospital gets a four-story addition
Birmingham, Ala.-based Hoar Construction has completed the North Tower addition at Thomas Hospital in Fairhope, Ala. The four-story, 123,000-sf addition accommodates an ER on the first floor, 32 private patient rooms and nursing support on the second and third floors, and room for 32 planned patient rooms on the top floor.
| Aug 11, 2010
Florida mixed-use complex includes retail, residential
The $325 million Atlantic Plaza II lifestyle center will be built on 8.5 acres in Delray Beach, Fla. Designed by Vander Ploeg & Associates, Boca Raton, the complex will include six buildings ranging from three to five stories and have 182,000 sf of restaurant and retail space. An additional 106,000 sf of Class A office space and a residential component including 197 apartments, townhouses, ...
| Aug 11, 2010
America's Greenest Hospital
Hospitals are energy gluttons. With 24/7/365 operating schedules and stringent requirements for air quality in ORs and other clinical areas, an acute-care hospital will gobble up about twice the energy per square foot of, say, a commercial office building. It is an achievement worth noting, therefore, when a major hospital achieves LEED Platinum status, especially when that hospital attains 14 ...
| Aug 11, 2010
3 Hospitals, 3 Building Teams, 1 Mission: Optimum Sustainability
It's big news in any city when a new billion-dollar hospital is announced. Imagine what it must be like to have not one, not two, but three such blockbusters in the works, each of them tracking LEED-NC Gold certification from the U.S. Green Building Council. That's the case in San Francisco, where three new billion-dollar-plus healthcare facilities are in various stages of design and constructi...
| Aug 11, 2010
Westin Hotel
Mid-twentieth-century projects are in a state of limbo. In many cities, safeguards against quick demolition don't even cover “new” buildings built after 1939, yet many such buildings may be obsolete by current standards. The Farmers and Mechanics Savings Bank, located in downtown Minneapolis, was one such building, a rare example of architecture from a time when American design was ...
| Aug 11, 2010
Platinum Award: Monumentally Hip Hotel Conversion
At one time the tallest building west of the Mississippi, the Foshay Tower has stood proudly on the Minneapolis skyline since 1929. Built by Wilbur Foshay as a tribute to the Washington Monument, the 30-story obelisk served as an office building—and cultural icon—for more than 70 years before the Ryan Companies and co-developer RWB Holdings partnered with Starwood Hotels & Resor...
| Aug 11, 2010
Hilton President Hotel
Once an elegant and fashionably trendy locale, the Presidential Hotel played host to the 1928 Republican National Convention where Herbert Hoover was nominated for President, and acted as a hot spot for Kansas City Jazz in the '30s and '40s. The hotel was eventually abandoned in 1984, at which point it became a haven for vagabonds and pigeons, collecting animal waste and incurring significant s...