flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

U.S. hotel construction pipeline up 14% to close out 2022

Hotel Facilities

U.S. hotel construction pipeline up 14% to close out 2022

At the end of 2022’s fourth quarter, the U.S. construction pipeline was up 14% by projects and 12% by rooms year-over-year, according to Lodging Econometrics.


By Lodging Econometrics | January 23, 2023
U.S. hotel construction pipeline up 14% to close out 2022 Photo: Max Vakhtbovych via Pexels
Photo: Max Vakhtbovych via Pexels

In the most recent Construction Pipeline Trend Report for the United States (U.S.) from Lodging Econometrics (LE), at the close of 2022’s fourth quarter, the U.S. construction pipeline stands at 5,465 projects/650,626 rooms, up 14% by projects and 12% rooms Year-Over-Year (YOY).

In Q4, all stages of hotel construction in the U.S. experienced positive YOY growth. At the close of the quarter, there are 1,008 projects/135,492 rooms under construction, up 4% by projects and 3% rooms YOY. Projects scheduled to start construction in the next 12 months stand at 2,073 projects/235,222 rooms, up 14% by projects and 12% by rooms YOY. Projects and rooms in the early planning stage increased 18% and 17% YOY, respectively, reaching all-time high counts of 2,348 projects/279,912 rooms.

The 2023 outlook for the lodging industry looks strong, as it continues to recover from the lows experienced throughout the past two years. Although the U.S. and the hotel industry continue to face some economic challenges, travel and hotel bookings increased substantially during 2022 and the new construction pipeline in the U.S. continues to grow at a moderate pace with new project announcements and construction-starts increasing 35% YOY and 36% YOY, respectively. Hotel owners, investors, developers, and management groups see much opportunity in the year ahead.

At the end of the fourth quarter, brand conversion room counts reached record highs of 1,030 projects/102,162 rooms. The renovation pipeline also remained strong in Q4, reaching the highest project counts seen since Q1 2019, standing at 900 projects/148,105 rooms. Combined, renovation and conversion activity accounts for 1,930 projects/250,267 rooms, record-highs by projects and up 53% YOY by projects and 45% by rooms YOY.

Dallas, Atlanta lead the nation in hotel construction projects

The U.S. Markets with the greatest number of projects in the construction pipeline, at the end of the fourth quarter, are Dallas with 176 projects/20,790 rooms. Following are Atlanta with 145 projects/18,100 rooms, Los Angeles with 122 projects/19,419 rooms, Phoenix with 116 projects/16,229 rooms, and Nashville with 106 projects and 14,198 rooms.

Franchise companies topping the pipeline with the greatest project and rooms counts at Q4 are Marriott International with 1,490 projects/180,113 rooms, Hilton Worldwide with 1,378 projects/154,790 rooms, and InterContinental Hotels Group (IHG) with 789 projects/78,951 rooms.

The brands with the largest number of projects in the pipeline at Q4 close are Home2 Suites by Hilton, with 521 projects/53,735 rooms; Marriott’s TownePlace Suites with 320 projects/29,802 rooms; and InterContinental Hotels Group’s (IHG) Holiday Inn Express with 293 projects/27,817 rooms.

Throughout 2022, the U.S. opened 464 new hotels, accounting for 54,620 rooms, for a growth rate of 1.0%. LE analysts expect new hotel openings to increase in 2023 with 607 projects/72,665 rooms forecasted to open, representing a 1.3% supply increase; and in 2024, 722 projects/82,813 rooms are expected to open, for a 1.5% supply increase.

Related Stories

| Aug 11, 2010

Cannon Design’s European-inspired Sparkling Hill Resort breaks ground

Cannon Design, a leading international architectural, engineering and planning firm, is pleased to announce that the firm’s Sparkling Hill Resort and Wellness Hotel in Vernon, BC, has broken ground.

| Aug 11, 2010

10 tips for mitigating influenza in buildings

Adopting simple, common-sense measures and proper maintenance protocols can help mitigate the spread of influenza in buildings. In addition, there are system upgrades that can be performed to further mitigate risks. Trane Commercial Systems offers 10 tips to consider during the cold and flu season.

| Aug 11, 2010

Skanska, Turner most active in U.S. hotel construction, according to BD+C's Giants 300 report

A ranking of the Top 50 Hotel Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

McCarthy, Skanska among nation's largest healthcare contractors, according to BD+C's Giants 300 report

A ranking of the Top 50 Healthcare Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

AECOM, Arup, Gensler most active in commercial building design, according to BD+C's Giants 300 report

A ranking of the Top 100 Commercial Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

New book provides energy efficiency guidance for hotels

Recommendations on achieving 30% energy savings over minimum code requirements are contained in the newly published Advanced Energy Design Guide for Highway Lodging.   The energy savings guidance for design of new hotels provides a first step toward achieving a net-zero-energy building.

| Aug 11, 2010

Perkins+Will master plans Vedanta University teaching hospital in India

Working together with the Anil Agarwal Foundation, Perkins+Will developed the master plan for the Medical Precinct of a new teaching hospital in a remote section of Puri, Orissa, India. The hospital is part of an ambitious plan to develop this rural area into a global center of education and healthcare that would be on par with Harvard, Stanford, and Oxford.

| Aug 11, 2010

Turner Building Cost Index dips nearly 4% in second quarter 2009

Turner Construction Company announced that the second quarter 2009 Turner Building Cost Index, which measures nonresidential building construction costs in the U.S., has decreased 3.35% from the first quarter 2009 and is 8.92% lower than its peak in the second quarter of 2008. The Turner Building Cost Index number for second quarter 2009 is 837.

boombox1
boombox2
native1

More In Category



3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021