flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

U.S. hotel construction pipeline remains steady with 5,572 projects in the works

Hotel Facilities

U.S. hotel construction pipeline remains steady with 5,572 projects in the works

The hotel construction pipeline grew incrementally in Q2 2023 as developers and franchise companies push through short-term challenges while envisioning long-term prospects, according to Lodging Econometrics.


By Lodging Econometrics | July 27, 2023
U.S. hotel construction pipeline remains steady with 5,572 projects in the works
Photo by Pixabay

According to the Q2 2023 United States Construction Pipeline Trend Report by Lodging Econometrics (LE), at the close of the second quarter, the hotel construction pipeline stands at 5,572 projects/660,061 rooms, with projects up 7% year-over-year (YOY) and rooms up 6% YOY.

The hotel construction pipeline grew incrementally quarter-over-quarter (QOQ), as developers and franchise companies push through short-term challenges while envisioning long-term prospects. Inflation, higher interest, rates and the general “wait and see” attitude of developers have prevailed in the economy in recent months; however, developers continue to believe in the strength of the economy long-term as witnessed by the continued growth in the pipeline. 

At the end of Q2, the total pipeline is only 5% from its all-time peak in terms of projects. Certainly, some head winds remain, but hotel developers are locking down prime locations for development now and in the coming months.

A bright spot for the economy and the hotel industry is the increased consumer confidence and sentiment which among other things has led to strong demand for guest rooms. This strong demand is expected to continue through the rest of the summer and into the fall with heavy tourist demand through August and the kick-off of the fall conference season after Labor Day.

Projects under construction have experienced modest QOQ growth over the past year and currently stand at 1,062 projects/141,681 rooms, up 10% and 8% YOY, respectively. Projects scheduled to start construction in the next 12 months saw an 11% increase in projects and 12% increase in rooms YOY, to stand at 2,232 projects/260,595 rooms at the close of the second quarter.

This increase highlights the fact that projects are progressing through the planning process and developers are sourcing funding to get “into the ground”. Year-over-year project counts in the early planning stage changed minimally and ended Q2 ’23 with 2,278 projects/257,785 rooms. The second quarter, however, marks the tenth consecutive quarter that the number of rooms in early planning has been over 200,000.

Upscale, upper-midscale hotel construction projects dominate

Upscale and upper midscale new construction projects dominate the pipeline at Q2, accounting for 62% of the projects and 57% of the rooms in the total U.S. construction pipeline. These two chain scales also represent 63% of the projects and 57% of the rooms anticipated to open through year-end 2023 and are expected to have the highest guest room growth rates through 2025.

Announced renovations and brand conversions, combined, reached record high project counts over the last four quarters, accounting for 1,939 projects/253,473 rooms, with upscale, upper midscale, and economy brands accounting for the majority of these projects at the end of 2023’s second quarter.

Extended-stay hotel projects have also been on the rise in the U.S., increasing consecutively over the last eight quarters. At the Q2 close, there were 2,083 extended-stay projects, with 214,557 rooms in the U.S. hotel construction pipeline. Extended-stay projects account for 32% of projects under construction in the total pipeline, 42% of projects scheduled to start construction in the next 12 months, and 36% of the projects in early planning across the U.S. 

In 2022, 130 extended-stay hotels opened, adding 13,647 rooms to the U.S. supply. For 2023, 180 extended-stay projects/18,713 rooms are expected to open. In 2024, 236 projects/24,281 rooms, and in 2025, 319 projects/32,798 rooms are forecast to open in the extended-stay segment. The extended stay segment is growing at 2.5 to 3.5 times the actual and forecasted industry growth rates from 2022-2025.

For the entire U.S., during the first and second quarters, 224 new hotels with 27,194 rooms opened. LE is forecasting another 384 projects/48,607 rooms to open in 2023 for a total of 608 new hotels/75,801 rooms by year-end. This represents a 1.4% increase in new supply for 2023. The total year-end forecast for 2023 represents a 22% YOY increase over the number of new hotels that opened in 2022, which stood at 475 hotels/56,157 rooms. 

In 2024, 700 new hotel projects with 79,422 rooms are expected to open, for another 1.4% increase in new supply growth. And announcing for the first time, LE analysts expect 808 projects/87,462 rooms to open in 2025 for a 1.5% increase in new supply.

Related Stories

| Aug 11, 2010

See what $3,000 a month will get you at Chicago’s Aqua Tower

Magellan Development Group has opened three display models for the rental portion of Chicago’s highly anticipated Aqua Tower, designed by Jeanne Gang. Lease rates range from $1,498 for a studio to $3,111 for a two-bedroom unit with lake views.

| Aug 11, 2010

Architecture Billings Index flat in May, according to AIA

After a slight decline in April, the Architecture Billings Index was up a tenth of a point to 42.9 in May. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending. Any score above 50 indicates an increase in billings.

| Aug 11, 2010

Construction employment declined in 333 of 352 metro areas in June

Construction employment declined in all but 19 communities nationwide this June as compared to June-2008, according to a new analysis of metropolitan-area employment data released today by the Associated General Contractors of America.  The analysis shows that few places in America have been spared the widespread downturn in construction employment over the past year.

| Aug 11, 2010

VA San Diego Healthcare System Building 1 Seismic Correction
San Diego, Calif.

Three decades after its original construction in the early 1970s, the Veterans Affairs San Diego Healthcare System Building 1 fell far short of current seismic codes. This not only put the building and its occupants—patients, doctors, nurses, visitors, and administrative staff—at risk in the event of a major earthquake, it violated a California state mandate requiring all hospitals to either retrofit or rebuild.

| Aug 11, 2010

Casino Queen breaks ground on $2.15 million entertainment venue

The Casino Queen in East St. Louis, Ill., is raising the stakes in its bid to capture a larger share of the local gaming market with the start of construction on a new $2.15 million sports bar and entertainment venue that will enhance the overall experience for guests.

| Aug 11, 2010

Outdated office tower becomes Nashville’s newest boutique hotel

A 1960s office tower in Nashville, Tenn., has been converted into a 248-room, four-star boutique hotel. Designed by Earl Swensson Associates, with PowerStrip Studio as interior designer, the newly converted Hutton Hotel features 54 suites, two penthouse apartments, 13,600 sf of meeting space, and seven “cardio” rooms.

| Aug 11, 2010

HDR, Perkins+Will top BD+C's ranking of the nation's 100 largest healthcare design firms

A ranking of the Top 100 Healthcare Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

boombox1
boombox2
native1

More In Category



3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021