flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

U.S. hotel construction pipeline remains steady with 5,572 projects in the works

Hotel Facilities

U.S. hotel construction pipeline remains steady with 5,572 projects in the works

The hotel construction pipeline grew incrementally in Q2 2023 as developers and franchise companies push through short-term challenges while envisioning long-term prospects, according to Lodging Econometrics.


By Lodging Econometrics | July 27, 2023
U.S. hotel construction pipeline remains steady with 5,572 projects in the works
Photo by Pixabay

According to the Q2 2023 United States Construction Pipeline Trend Report by Lodging Econometrics (LE), at the close of the second quarter, the hotel construction pipeline stands at 5,572 projects/660,061 rooms, with projects up 7% year-over-year (YOY) and rooms up 6% YOY.

The hotel construction pipeline grew incrementally quarter-over-quarter (QOQ), as developers and franchise companies push through short-term challenges while envisioning long-term prospects. Inflation, higher interest, rates and the general “wait and see” attitude of developers have prevailed in the economy in recent months; however, developers continue to believe in the strength of the economy long-term as witnessed by the continued growth in the pipeline. 

At the end of Q2, the total pipeline is only 5% from its all-time peak in terms of projects. Certainly, some head winds remain, but hotel developers are locking down prime locations for development now and in the coming months.

A bright spot for the economy and the hotel industry is the increased consumer confidence and sentiment which among other things has led to strong demand for guest rooms. This strong demand is expected to continue through the rest of the summer and into the fall with heavy tourist demand through August and the kick-off of the fall conference season after Labor Day.

Projects under construction have experienced modest QOQ growth over the past year and currently stand at 1,062 projects/141,681 rooms, up 10% and 8% YOY, respectively. Projects scheduled to start construction in the next 12 months saw an 11% increase in projects and 12% increase in rooms YOY, to stand at 2,232 projects/260,595 rooms at the close of the second quarter.

This increase highlights the fact that projects are progressing through the planning process and developers are sourcing funding to get “into the ground”. Year-over-year project counts in the early planning stage changed minimally and ended Q2 ’23 with 2,278 projects/257,785 rooms. The second quarter, however, marks the tenth consecutive quarter that the number of rooms in early planning has been over 200,000.

Upscale, upper-midscale hotel construction projects dominate

Upscale and upper midscale new construction projects dominate the pipeline at Q2, accounting for 62% of the projects and 57% of the rooms in the total U.S. construction pipeline. These two chain scales also represent 63% of the projects and 57% of the rooms anticipated to open through year-end 2023 and are expected to have the highest guest room growth rates through 2025.

Announced renovations and brand conversions, combined, reached record high project counts over the last four quarters, accounting for 1,939 projects/253,473 rooms, with upscale, upper midscale, and economy brands accounting for the majority of these projects at the end of 2023’s second quarter.

Extended-stay hotel projects have also been on the rise in the U.S., increasing consecutively over the last eight quarters. At the Q2 close, there were 2,083 extended-stay projects, with 214,557 rooms in the U.S. hotel construction pipeline. Extended-stay projects account for 32% of projects under construction in the total pipeline, 42% of projects scheduled to start construction in the next 12 months, and 36% of the projects in early planning across the U.S. 

In 2022, 130 extended-stay hotels opened, adding 13,647 rooms to the U.S. supply. For 2023, 180 extended-stay projects/18,713 rooms are expected to open. In 2024, 236 projects/24,281 rooms, and in 2025, 319 projects/32,798 rooms are forecast to open in the extended-stay segment. The extended stay segment is growing at 2.5 to 3.5 times the actual and forecasted industry growth rates from 2022-2025.

For the entire U.S., during the first and second quarters, 224 new hotels with 27,194 rooms opened. LE is forecasting another 384 projects/48,607 rooms to open in 2023 for a total of 608 new hotels/75,801 rooms by year-end. This represents a 1.4% increase in new supply for 2023. The total year-end forecast for 2023 represents a 22% YOY increase over the number of new hotels that opened in 2022, which stood at 475 hotels/56,157 rooms. 

In 2024, 700 new hotel projects with 79,422 rooms are expected to open, for another 1.4% increase in new supply growth. And announcing for the first time, LE analysts expect 808 projects/87,462 rooms to open in 2025 for a 1.5% increase in new supply.

Related Stories

| Aug 11, 2010

Colorado hospital wins LEED Gold

The main building of the Medical Center of the Rockies in Loveland, Colo., is a 136-bed regional medical center offering a full spectrum of services, with specialties in cardiac and trauma care. Constructed primarily of brick, native sandstone, and 85,000 sf of metal panels manufactured by Centria, the 600,000-sf main building, by Denver-based HLM Design, is one of the few hospitals in the nati...

| Aug 11, 2010

Design ups comfort, care in cancer center

A new cancer center is slated to open in fall 2011 at Banner Gateway Medical Center, Gilbert, Ariz. The three-story, 120,000-sf, $107 million cancer center will contain physician clinics, medical imaging, radiation oncology, infusion therapy, and support services. A/E firm Cannon Design has created a visually open, column-free interior to increase patient comfort and care.

| Aug 11, 2010

Charlotte hospital expands its surgery capabilities

The Chicago office of RTKL designed Carolinas HealthCare System's Mercy Medical Plaza, Charlotte, N.C. The 150,000-sf hospital houses 12 operating rooms with expanded pre-operative and recovery space, a pharmacy, and a central sterile processing unit. Tenant space occupies 75,000 sf. RTKL mimicked the materials and mass of older buildings on the campus but created a more modern look by using ex...

| Aug 11, 2010

And the world's tallest building is…

At more than 2,600 feet high, the Burj Dubai (right) can still lay claim to the title of world's tallest building—although like all other super-tall buildings, its exact height will have to be recalculated now that the Council on Tall Buildings and Urban Habitat (CTBUH) announced a change to its height criteria.

| Aug 11, 2010

Spa resort in harmony with mountain setting

The Sparkling Hill Resort and Wellness Hotel in Vernon, B.C., looks as if it was chiseled out of bedrock and jutting from the mountainside. Designed by the Victoria, B.C., office of Cannon Design, the 240,000-sf resort has 152 guest rooms with floor-to-ceiling windows and spa-like bathrooms, as well as a signature 20,000-sf whole-body wellness spa with treatment rooms designed to feel like they...

| Aug 11, 2010

Triangular tower targets travelers

Chicago-based Goettsch Partners is designing a new mixed-use high-rise for the Chinese city of Dalian, located on the Yellow Sea coast. Developed by Hong Kong-based China Resources Land Limited, the tower will have almost 1.1 million sf, which includes a 377-room Grand Hyatt hotel, 84 apartments, three restaurants, banquet space, and a spa and fitness center.

| Aug 11, 2010

Expanding retail complex is LEED pre-certified

The Promenade at Coconut Creek in Broward County, Fla., a live-work-play shopping and lifestyle center, is being expanded by 105,000 sf. When phase II of the 335,000-sf project is complete, the facility will house 75 retailers, restaurants, and related services, making it one of the largest mixed-use projects in northern Broward County.

| Aug 11, 2010

CityCenter projects get LEED Gold

MGM Mirage and Infinity World Development have received LEED Gold certification for the first three CityCenter projects: the ARIA Resort hotel tower, ARIA Resort convention center and theater, and the Vdara Hotel (above). The CityCenter developers anticipate Gold or Silver LEED certification for the project's remaining developments, which include a Mandarin Oriental hotel, a 500,000-sf retail a...

| Aug 11, 2010

Philadelphia cancer center seeks LEED certification

The New York office of Thornton Tomasetti provided structural engineering services for the Ruth and Raymond Perelman Center for Advanced Medicine in Philadelphia, a $232 million medical research center and advanced treatment center for cancer and cardiovascular disease. Designed by a joint venture of Perkins Eastman Architects and Rafael Vinõly Architects, the 340,000-sf facility will hous...

| Aug 11, 2010

High-level NICU opens in Washington, D.C.

Design to the highest distinction available by the American Academy of Pediatrics, the new Level IIIC neonatal intensive care unit (NICU) at Children's National Medical Center in Washington D.C., is equipped to care for the sickest premature babies, including those that require open-heart surgery. The 54-bed facility, designed by Karlsberger with KLMK Group as space planner, is four times large...

boombox1
boombox2
native1

More In Category



3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021