flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

USGBC pushes back LEED v4 deadline

USGBC pushes back LEED v4 deadline

LEED 2009 is extended through October 2016


By Peter Fabris, Contributing Editor | October 30, 2014

The U.S. Green Building Council will allow LEED users to register projects under the LEED 2009 rating system until Oct. 31, 2016. The original date for LEED 2009 registration to close was June 15, 2015.

Extending to October 2016 gives LEED users and members of the green building industry additional time to prepare for LEED v4, the latest version of LEED, which features increased rigor and multiple updates, USGBC says.

“When USGBC launched LEED v4 last year, we set out with one goal in mind – to raise the bar in a way that challenges the building industry to reach higher than ever before,” said Rick Fedrizzi, CEO & founding chair, USGBC. “However, the market has requested additional time to prepare for LEED v4, so we are responding.”

In a survey conducted at the 2014 Greenbuild conference, 61% of respondents said they are “not ready” or “unsure” if they are ready to pursue LEED v4 and require additional time to prepare. LEED v4 has been in the market for nearly one year and will remain available for those who are ready.

(http://us5.campaign-archive2.com/?u=ca55cb2e5c853bc823c1f59af&id=2e9f211184&e=e4f9394553)

Related Stories

| Aug 30, 2012

OSHA plans new crane-safety standards for demolition and underground work

The new rule will streamline OSHA’s standards by eliminating the separate cranes and derricks standard currently used for underground and demolition work.

| Aug 30, 2012

Federal government cancels defense contracts worth $2.15 billion

This action may foreshadow federal spending cuts scheduled for year's end if Congress takes no action on the federal budget.

| Aug 30, 2012

Public comment period is open for CRRC-1 standard

The CRRC-1 standard covers specimen preparation and test methods for measuring the initial and aged solar reflectance and thermal emittance of roofing products.

| Aug 30, 2012

LEED system's footprint reaches 2 billion sf, with 7 billion sf in the pipeline

About 7 billion more sf of commercial space is expected in the pipeline.

| Aug 30, 2012

Georgia drops LEED wood source standard on state projects

Currently, LEED green building standards only accept timber products certified by the Forest Stewardship Council (FSC).

| Aug 21, 2012

AGC offers second edition of the Federal Government Contractor: Ethics & Compliance Programs manual

This publication helps contractors appreciate the grounds for an alleged violation of the expected standards of business conduct and ethics, and to develop, implement, and document an effective ethics and compliance program.

| Aug 21, 2012

Federal Safe Building Code Incentive Act’s bipartisan support, no notable objection, bodes well for passage

The Safe Building Code Incentive Act would give states a little extra post-disaster federal funding if they enacted and enforced nationally recognized building codes for businesses and residences before disaster strikes.

| Aug 16, 2012

New York’s Barclays Center project accused of ignoring noise, pollution regulations

Construction crews racing to finish the Brooklyn Barclays Center are ignoring strict regulations to reduce noise and pollution, a new report by critics has found.

| Aug 16, 2012

Harness saves life of worker cleaning Washington state Capitol

Fall-protection equipment helped save the life of a worker who was cleaning the Washington state Capitol building in Olympia, after the platform he was using gave way.

| Aug 16, 2012

CSI webinar on August 21 focuses on electronic energy control

The Construction Specifications Institute (CSI) is sponsoring a free webinar on August 21 at 2:00 p.m. (EDT) on electronic energy control.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021