flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Choose the Right Material for the Right Job​, Part 2​

Choose the Right Material for the Right Job​, Part 2​


July 23, 2015

John Neal shares his story on how sticking to the engineer’s spec at a job’s start can prevent costly repairs and service disruptions later.

Tags

Related Stories

Sponsored | Plumbing | Nov 13, 2015

Getting the Most Value When You Value Engineer DWV Systems

There are lots of places in a DWV system where value can be captured, but there are applications where what looks like value can mask risks that you might not want to take.

Sponsored | Plumbing | Oct 9, 2015

Porsche luxury meets Viega innovations

Occupants of the Porsche Design Tower on the shoreline of Florida’s Sunny Isles Beach will experience the best view in the city

Sponsored | Plumbing | Aug 18, 2015

​Make sure the money you save in VE isn't destroyed in a lawsuit

​Getting the PVC vs. Cast Iron choice right

Sponsored | Plumbing | Mar 13, 2015

Viega ProPress for stainless looks good at UNH

One of the oldest buildings on the University of New Hampshire (UNH) campus, Huddleston Hall is a multipurpose facility, which includes dormitories, classrooms and an event center.

Building Materials | Feb 19, 2015

Prices for construction materials fall in January, following plummet of oil prices

The decline in oil and petroleum prices finally showed up in the produce price index data, according to ABC Chief Economist Anirban Basu.

| Dec 8, 2014

The global sanitation crisis leads to 2.5 million deaths every year

When we see the incredible technology being produced by global plumbing manufacturers, it’s hard to conceive why no viable technical solution to the global sanitation issue has come forth, writes BD+C's Robert Cassidy.

boombox1
boombox2
native1

More In Category


Plumbing

EPA to revise criteria for WaterSense faucets and faucet accessories

The U.S. Environmental Protection Agency (EPA) plans to revise its criteria for faucets and faucet accessories to earn the WaterSense label. The specification launched in 2007; since then, most faucets now sold in the U.S. meet or exceed the current WaterSense maximum flow rate of 1.5 gallons per minute (gpm). 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021