flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Ware Malcomb promotes Matt Chaiken to vice president

Building Team

Ware Malcomb promotes Matt Chaiken to vice president

Chaiken joins the firm’s executive team, oversees the leadership of the Denver office and leads Ware Malcomb’s largest corporate accounts.


By Ware Malcomb | June 13, 2022
Matt Chaiken promotion
Courtesy Ware Malcomb.

Ware Malcomb, an award-winning international design firm, today announced that Matt Chaiken has been promoted to Vice President in the firm’s Denver office. Chaiken joins the firm’s executive team, oversees the leadership of the Denver office and leads Ware Malcomb’s largest corporate accounts.

Chaiken joined Ware Malcomb as Project Architect in the firm’s Architecture Studio in 2004 and helped build and grow the firm’s architecture and interior design practice in the Denver market. In 2006, he was promoted to Studio Manager and, later that year, to Regional Director. Over the past 16 years, Chaiken has successfully expanded the firm’s Denver operations with new clients, services and project types. Select high-profile projects designed by Ware Malcomb in the area include: TruStile’s office/manufacturing headquarters in Denver; 1900 Grant Street office repositioning in Denver; Kärcher’s North American headquarters in Aurora; Crossroads Commerce Center in Denver; and the Leopold Bros. distillery in Denver.

“We are appreciative of Matt’s leadership, which has helped us build a strong, connected culture,” said Matt Brady, Executive Vice President of Ware Malcomb. “He was an early champion of our civil engineering practice and has an important leadership role with some of our largest corporate accounts. We look forward to his contributions for many years to come.” 
A licensed architect in Colorado, Kansas, Montana, Ohio, Oklahoma, Texas, Virginia, and Wyoming, Chaiken has wide experience across all facets of architecture. He has overseen a variety of industrial, office, distribution, technology and retail projects throughout his career. Chaiken is NCARB certified, a LEED Accredited Professional, and a member of NAIOP. He holds a Bachelor of Architecture degree from the University of Kansas. Chaiken has been a speaker at national and local commercial real estate industry events and authored multiple thought leadership articles.

Related Stories

| Nov 2, 2010

A Look Back at the Navy’s First LEED Gold

Building Design+Construction takes a retrospective tour of a pace-setting LEED project.

| Nov 2, 2010

Wind Power, Windy City-style

Building-integrated wind turbines lend a futuristic look to a parking structure in Chicago’s trendy River North neighborhood. Only time will tell how much power the wind devices will generate.

| Nov 2, 2010

Energy Analysis No Longer a Luxury

Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.

| Nov 2, 2010

Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’

Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021