Ware Malcomb, an award-winning international design firm, today announced that Matt Chaiken has been promoted to Vice President in the firm’s Denver office. Chaiken joins the firm’s executive team, oversees the leadership of the Denver office and leads Ware Malcomb’s largest corporate accounts.
Chaiken joined Ware Malcomb as Project Architect in the firm’s Architecture Studio in 2004 and helped build and grow the firm’s architecture and interior design practice in the Denver market. In 2006, he was promoted to Studio Manager and, later that year, to Regional Director. Over the past 16 years, Chaiken has successfully expanded the firm’s Denver operations with new clients, services and project types. Select high-profile projects designed by Ware Malcomb in the area include: TruStile’s office/manufacturing headquarters in Denver; 1900 Grant Street office repositioning in Denver; Kärcher’s North American headquarters in Aurora; Crossroads Commerce Center in Denver; and the Leopold Bros. distillery in Denver.
“We are appreciative of Matt’s leadership, which has helped us build a strong, connected culture,” said Matt Brady, Executive Vice President of Ware Malcomb. “He was an early champion of our civil engineering practice and has an important leadership role with some of our largest corporate accounts. We look forward to his contributions for many years to come.”
A licensed architect in Colorado, Kansas, Montana, Ohio, Oklahoma, Texas, Virginia, and Wyoming, Chaiken has wide experience across all facets of architecture. He has overseen a variety of industrial, office, distribution, technology and retail projects throughout his career. Chaiken is NCARB certified, a LEED Accredited Professional, and a member of NAIOP. He holds a Bachelor of Architecture degree from the University of Kansas. Chaiken has been a speaker at national and local commercial real estate industry events and authored multiple thought leadership articles.
Related Stories
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.
| Oct 13, 2010
Hospital tower gets modern makeover
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.
| Oct 13, 2010
Modern office design accentuates skyline views
Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.
| Oct 13, 2010
Hospital and clinic join for better patient care
Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.
| Oct 13, 2010
Biloxi’s convention center bigger, better after Katrina
The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.
| Oct 13, 2010
Science building supports enrollment increases
The new Kluge-Moses Science Building at Piedmont Virginia Community College, in Charlottesville, is part of a campus update designed and managed by the Lukmire Partnership. The 34,000-sf building is designed to be both a focal point of the college and a recruitment mechanism to get more students enrolling in healthcare programs.
| Oct 13, 2010
Cancer hospital plans fifth treatment center
Construction is set to start in December on the new Cancer Treatment Centers of America’s $55 million hospital in Newnan, Ga. The 225,000-sf facility will have 25 universal inpatient beds, two linear accelerator vaults, an HDR/Brachy therapy vault, and a radiology and imaging unit.
| Oct 13, 2010
Apartment complex will offer affordable green housing
Urban Housing Communities, KTGY Group, and the City of Big Bear Lake (Calif.) Improvement Agency are collaborating on The Crossings at Big Bear Lake, the first apartment complex in the city to offer residents affordable, eco-friendly homes. KTGY designed 28 two-bedroom, two-story townhomes and 14 three-bedroom, single-story flats, averaging 1,100 sf each.
| Oct 13, 2010
Residences bring students, faculty together in the Middle East
A new residence complex is in design for United Arab Emirates University in Al Ain, UAE, near Abu Dhabi. Plans for the 120-acre mixed-use development include 710 clustered townhomes and apartments for students and faculty and common areas for community activities.