flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Wolf Point high-rise development begins construction in Chicago

Wolf Point high-rise development begins construction in Chicago

Pedestrian areas, 100,000 sf of parks, and a river walk will be part of Wolf Point.


By BD+C Staff | July 30, 2014
Designed by Pelli Clarke Pelli Architects, the 48-story luxury residential tower
Designed by Pelli Clarke Pelli Architects, the 48-story luxury residential tower is part of a three-tower mixed-use development

On July 18th, construction began on a 48-story luxury residential tower in Chicago. Part of a larger master plan designed by Pelli Clarke Pelli Architects, the tower is being developed by Hines and Magellan Development Group. All told, three towers will be built as part of the larger project, called Wolf Point.

The three buildings are:

  • West Tower (under construction) - a 50-story, 500-foot-tall apartment building with 500 luxury rental units
  • South Tower - a 950-foot-tall mixed-use building that will be the city's eighth-tallest tower
  • East Tower - a 750-foot-tall mixed-use building.

The development is located at the Y-shaped intersection of the Chicago River's northern, southern, and western branches. As a whole, the project has been contentious for local residents. It was strongly opposed when the developers first introduced it, and the current plan is a revised version of the original. Residents were worried that the original plan would block views of the skyline and increase traffic in the area. 

Pedestrian areas, 100,000 sf of park space, and a river walk will be part of Wolf Point. The developers plan to pursue LEED Silver Certification for the development.

 


A view of Wolf Point from the west. Renderings courtesy of Hines.

 


A view of Wolf Point from the north. Renderings courtesy of Hines.

 


A view of the west garden at Wolf Point. Renderings courtesy of Hines.

Related Stories

High-rise Construction | Dec 20, 2017

Another record year for high-rise construction

More than 140 skyscrapers were completed across the globe this year, including 15 supertall towers.

High-rise Construction | Oct 4, 2017

90-story mixed-use building could become Denver’s first supertall tower

Manhattan-based Greenwich Realty Capital is developing the project.

High-rise Construction | Sep 8, 2017

CTBUH determines fastest elevators and longest runs in the world in new TBIN Study

When it comes to the tallest skyscrapers in the world, the vertical commute in the building becomes just as important as the horizontal commute through the city.

Codes and Standards | Sep 5, 2017

New CTBUH initiatives to investigate link between fire and façades

In wake of Grenfell tragedy, Council forms new workgroup.

Mixed-Use | Aug 30, 2017

A 50-acre waterfront redevelopment gets under way in Tampa

Nine architects, three interior designers, and nine contractors are involved in this $3 billion project.

Codes and Standards | Aug 7, 2017

Council on Tall Buildings and Urban Habitat to create standards to measure floor area

The standards will examine existing codes and regulations to find where they are too broad or contentious.

High-rise Construction | Aug 1, 2017

Construction on the world’s skinniest tower halts due to ballooning costs

The planned 82-story tower has stalled after completing just 20 stories.

Wood | Jun 13, 2017

The first timber high-rise in the U.S. set for construction in Portland

The building’s design, building materials, and commercial tenants are all focused on the key aspect of sustainability.

Office Buildings | May 30, 2017

How tech companies are rethinking the high-rise workplace

Eight fresh ideas for the high-rise of the future, from NBBJ Design Partner Jonathan Ward.

Mixed-Use | May 23, 2017

45-story tower planned for Miami Worldcenter

Pickard Chilton Architects will design the 600,000-sf 110 10th Street.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021