The WorkingBuildings Companies, a leading provider of comprehensive Owner-based solutions for the built environment, announces the acquisition of Specialty Operations Solutions (SOS), a national provider of research and laboratory services. This addition to the firm strengthens The WorkingBuildings Companies’ position as one of the fastest-growing comprehensive professional services firm in the world and expands their existing service offerings.
The WorkingBuildings Companies features six specialized divisions of service dedicated to providing facility Owner’s with quality processes for the built environment. These six divisions include WorkingBuildings, WorkingHospitals, WorkingLaboratories, WB | Global Advisory, CxAlloy, and now, SOS. Each branch works to define success for projects and to address inconsistencies when bringing complex facilities online, and SOS specifically adds medical products to market. The services our branches provide result in a facility with fewer operational issues and less expense, both during the design and construction phase and throughout the operational lifespan.
President and CEO of WorkingBuildings, Michael Weiss, says of the acquisition, “SOS fits in seamlessly with the goals of The WorkingBuildings Companies. The addition of this highly respected group of doctors, scientists, engineers, and technicians to the WorkingBuildings team will provide great value to our clients. We will be able to provide owners with a truly turnkey research or manufacturing laboratory that is assured to operate efficiently, to meet all the mandatory requirements, and to achieve FDA compliance. We can now accomplish this while simultaneously reducing the construction and operational cost. Our expanded service offerings give WorkingBuildings greater depth and capabilities while providing consistency typically not found in the marketplace. We are very excited about the possibilities this new addition brings.”
With this new division, The WorkingBuildings Companies is able to assist their clients with turnkey services for CGMP laboratory facilities and manufacturing facilities and GTP laboratory and manufacturing facilities for products designed to treat a variety of human and animal diseases and injuries. The SOS staff is particularly experienced with cell and tissue therapies, regenerative medicine products, cord blood banking and processing, USP 797and 823 dispensing facilities, and in the specific facility and process needs required for new and emerging therapies and devices. SOS’ services include but are not limited to detailed basis of design document development, facility project management, facility programming, complete quality assurance and regulatory services support, SOP development and training, and research animal care. The SOS division will focus on the GxP, research animal care, and USP 797/823 markets to provide Owners with a facility and program that will meet stringent FDA, USDA, EMEA, AAALAC-I and State Pharmacy Control Board requirements.
About The WorkingBuildings Companies
WorkingBuildings, LLC is an employee-owned professional service firm specializing in building commissioning, LEED® certification, sustainability consulting, laboratory pre-certification, standard operating procedures for bio-medical facilities, risk/threat mitigation, and CxAlloy Suites software. The company is headquartered in Atlanta, GA with offices located in Albuquerque, Alexandria, Austin, Birmingham, Jackson, New Orleans, New York,, West Trenton, Charlotte and Winston-Salem; and Riyadh (Saudi Arabia). For more information, call 678-990-8001 or visit www.workingbuildings.com.
About Specialty Operations Solutions
Specialty Operations Solutions (SOS) is a professional services firm that works strategically for the Owner to bridge the gap between development and FDA compliance requirements for a CGMP facility or product. For more information, call 678-990-8001 or visit www.specialtyoperations.com.
Related Stories
Student Housing | Apr 19, 2024
$115 million Cal State Long Beach student housing project will add 424 beds
A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.
Construction Costs | Apr 18, 2024
New download: BD+C's April 2024 Market Intelligence Report
Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.
MFPRO+ New Projects | Apr 16, 2024
Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn
The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.
Construction Costs | Apr 16, 2024
How the new prevailing wage calculation will impact construction labor costs
Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.
Healthcare Facilities | Apr 16, 2024
Mexico’s ‘premier private academic health center’ under design
The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.
Market Data | Apr 16, 2024
The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024
Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.
Laboratories | Apr 15, 2024
HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus
In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.
Codes and Standards | Apr 12, 2024
ICC eliminates building electrification provisions from 2024 update
The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.
Urban Planning | Apr 12, 2024
Popular Denver e-bike voucher program aids carbon reduction goals
Denver’s e-bike voucher program that helps citizens pay for e-bikes, a component of the city’s carbon reduction plan, has proven extremely popular with residents. Earlier this year, Denver’s effort to get residents to swap some motor vehicle trips for bike trips ran out of vouchers in less than 10 minutes after the program opened to online applications.
Laboratories | Apr 12, 2024
Life science construction completions will peak this year, then drop off substantially
There will be a record amount of construction completions in the U.S. life science market in 2024, followed by a dramatic drop in 2025, according to CBRE. In 2024, 21.3 million sf of life science space will be completed in the 13 largest U.S. markets. That’s up from 13.9 million sf last year and 5.6 million sf in 2022.