flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

WorkingBuildings acquires Specialty Operations Solutions

WorkingBuildings acquires Specialty Operations Solutions


By WorkingBuildings | June 13, 2013

The WorkingBuildings Companies, a leading provider of comprehensive Owner-based solutions for the built environment, announces the acquisition of Specialty Operations Solutions (SOS), a national provider of research and laboratory services. This addition to the firm strengthens The WorkingBuildings Companies’ position as one of the fastest-growing comprehensive professional services firm in the world and expands their existing service offerings.

The WorkingBuildings Companies features six specialized divisions of service dedicated to providing facility Owner’s with quality processes for the built environment. These six divisions include WorkingBuildings, WorkingHospitals, WorkingLaboratories, WB | Global Advisory, CxAlloy, and now, SOS. Each branch works to define success for projects and to address inconsistencies when bringing complex facilities online, and SOS specifically adds medical products to market. The services our branches provide result in a facility with fewer operational issues and less expense, both during the design and construction phase and throughout the operational lifespan.

President and CEO of WorkingBuildings, Michael Weiss, says of the acquisition, “SOS fits in seamlessly with the goals of The WorkingBuildings Companies. The addition of this highly respected group of doctors, scientists, engineers, and technicians to the WorkingBuildings team will provide great value to our clients. We will be able to provide owners with a truly turnkey research or manufacturing laboratory that is assured to operate efficiently, to meet all the mandatory requirements, and to achieve FDA compliance. We can now accomplish this while simultaneously reducing the construction and operational cost. Our expanded service offerings give WorkingBuildings greater depth and capabilities while providing consistency typically not found in the marketplace. We are very excited about the possibilities this new addition brings.”

With this new division, The WorkingBuildings Companies is able to assist their clients with turnkey services for CGMP laboratory facilities and manufacturing facilities and GTP laboratory and manufacturing facilities for products designed to treat a variety of human and animal diseases and injuries.  The SOS staff is particularly experienced with cell and tissue therapies, regenerative medicine products, cord blood banking and processing, USP 797and 823 dispensing facilities, and in the specific facility and process needs required for new and emerging therapies and devices.  SOS’ services include but are not limited to detailed basis of design document development, facility project management, facility programming, complete quality assurance and regulatory services support, SOP development and training, and research animal care.  The SOS division will focus on the GxP, research animal care, and USP 797/823 markets to provide Owners with a facility and program that will meet stringent FDA, USDA, EMEA, AAALAC-I and State Pharmacy Control Board requirements.

About The WorkingBuildings Companies

WorkingBuildings, LLC is an employee-owned professional service firm specializing in building commissioning, LEED® certification, sustainability consulting, laboratory pre-certification, standard operating procedures for bio-medical facilities, risk/threat mitigation, and CxAlloy Suites software. The company is headquartered in Atlanta, GA with offices located in Albuquerque, Alexandria, Austin, Birmingham, Jackson, New Orleans, New York,, West Trenton, Charlotte and Winston-Salem; and Riyadh (Saudi Arabia). For more information, call 678-990-8001 or visit www.workingbuildings.com.


About Specialty Operations Solutions

Specialty Operations Solutions (SOS) is a professional services firm that works strategically for the Owner to bridge the gap between development and FDA compliance requirements for a CGMP facility or product. For more information, call 678-990-8001 or visit www.specialtyoperations.com

Related Stories

University Buildings | Dec 5, 2023

The University of Cincinnati builds its largest classroom building to serve its largest college

The University of Cincinnati’s recently completed Clifton Court Hall unifies the school’s social science programs into a multidisciplinary research and education facility. The 185,400-sf structure is the university’s largest classroom building, serving its largest college, the College of Arts and Sciences.

MFPRO+ News | Dec 5, 2023

DOE's Zero Energy Ready Home Multifamily Version 2 released

The U.S. Department of Energy has released Zero Energy Ready Home Multifamily Version 2. The latest version of the certification program increases energy efficiency and performance levels, adds electric readiness, and makes compliance pathways and the certification process more consistent with the ENERGY STAR Multifamily New Construction (ESMFNC) program.

Architects | Dec 5, 2023

Populous celebrates its 40th anniversary with a photo exhibit of its works

The firm partnered with Getty Images to assemble more than 60 images, many capturing fan ardor.

Office Buildings | Dec 1, 2023

Amazon office building doubles as emergency housing for Seattle families

The unusual location for services of this kind serves over 300 people per day. Mary's Place spreads across eight of the office's floors—all designed by Graphite—testing the status quo for its experimental approach to homelessness support.

Mixed-Use | Nov 29, 2023

Mixed-use community benefits from city amenities and ‘micro units’

Salt Lake City, Utah, is home to a new mixed-use residential community that benefits from transit-oriented zoning and cleverly designed multifamily units.

Giants 400 | Nov 28, 2023

Top 100 Laboratory Design Firms for 2023

HDR, Flad Architects, DGA, Elkus Manfredi Architects, and Gensler top BD+C's ranking of the nation's largest laboratory architecture and architecture/engineering (AE) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

Engineers | Nov 27, 2023

Kimley-Horn eliminates the guesswork of electric vehicle charger site selection

Private businesses and governments can now choose their new electric vehicle (EV) charger locations with data-driven precision. Kimley-Horn, the national engineering, planning, and design consulting firm, today launched TREDLite EV, a cloud-based tool that helps organizations develop and optimize their EV charger deployment strategies based on the organization’s unique priorities.

Market Data | Nov 27, 2023

Number of employees returning to the office varies significantly by city

While the return-to-the-office trend is felt across the country, the percentage of employees moving back to their offices varies significantly according to geography, according to Eptura’s Q3 Workplace Index.

Resiliency | Nov 27, 2023

All levels of government need to act to cope with climate-driven flooding and sea level rise

The latest National Climate Assessment highlights the need for local, state, and federal governments to adopt policies to mitigate the effects of climate-driven flooding and sea level rise, according to a policy expert with the National Resources Defense Council.

Data Centers | Nov 22, 2023

How is artificial intelligence impacting data center design?

As AI is reshaping how we interact with machines and the world around us, the design of data centers needs to adapt to this fast-changing landscape. So, Page pairs expert thinking with high-performing solutions to meet the needs of rapidly advancing technologies.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021