flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

WorkingBuildings acquires Specialty Operations Solutions

WorkingBuildings acquires Specialty Operations Solutions


By WorkingBuildings | June 13, 2013

The WorkingBuildings Companies, a leading provider of comprehensive Owner-based solutions for the built environment, announces the acquisition of Specialty Operations Solutions (SOS), a national provider of research and laboratory services. This addition to the firm strengthens The WorkingBuildings Companies’ position as one of the fastest-growing comprehensive professional services firm in the world and expands their existing service offerings.

The WorkingBuildings Companies features six specialized divisions of service dedicated to providing facility Owner’s with quality processes for the built environment. These six divisions include WorkingBuildings, WorkingHospitals, WorkingLaboratories, WB | Global Advisory, CxAlloy, and now, SOS. Each branch works to define success for projects and to address inconsistencies when bringing complex facilities online, and SOS specifically adds medical products to market. The services our branches provide result in a facility with fewer operational issues and less expense, both during the design and construction phase and throughout the operational lifespan.

President and CEO of WorkingBuildings, Michael Weiss, says of the acquisition, “SOS fits in seamlessly with the goals of The WorkingBuildings Companies. The addition of this highly respected group of doctors, scientists, engineers, and technicians to the WorkingBuildings team will provide great value to our clients. We will be able to provide owners with a truly turnkey research or manufacturing laboratory that is assured to operate efficiently, to meet all the mandatory requirements, and to achieve FDA compliance. We can now accomplish this while simultaneously reducing the construction and operational cost. Our expanded service offerings give WorkingBuildings greater depth and capabilities while providing consistency typically not found in the marketplace. We are very excited about the possibilities this new addition brings.”

With this new division, The WorkingBuildings Companies is able to assist their clients with turnkey services for CGMP laboratory facilities and manufacturing facilities and GTP laboratory and manufacturing facilities for products designed to treat a variety of human and animal diseases and injuries.  The SOS staff is particularly experienced with cell and tissue therapies, regenerative medicine products, cord blood banking and processing, USP 797and 823 dispensing facilities, and in the specific facility and process needs required for new and emerging therapies and devices.  SOS’ services include but are not limited to detailed basis of design document development, facility project management, facility programming, complete quality assurance and regulatory services support, SOP development and training, and research animal care.  The SOS division will focus on the GxP, research animal care, and USP 797/823 markets to provide Owners with a facility and program that will meet stringent FDA, USDA, EMEA, AAALAC-I and State Pharmacy Control Board requirements.

About The WorkingBuildings Companies

WorkingBuildings, LLC is an employee-owned professional service firm specializing in building commissioning, LEED® certification, sustainability consulting, laboratory pre-certification, standard operating procedures for bio-medical facilities, risk/threat mitigation, and CxAlloy Suites software. The company is headquartered in Atlanta, GA with offices located in Albuquerque, Alexandria, Austin, Birmingham, Jackson, New Orleans, New York,, West Trenton, Charlotte and Winston-Salem; and Riyadh (Saudi Arabia). For more information, call 678-990-8001 or visit www.workingbuildings.com.


About Specialty Operations Solutions

Specialty Operations Solutions (SOS) is a professional services firm that works strategically for the Owner to bridge the gap between development and FDA compliance requirements for a CGMP facility or product. For more information, call 678-990-8001 or visit www.specialtyoperations.com. 

Related Stories

| Oct 5, 2011

GREENBUILD 2011: Brick offers growing options for sustainable building design

Brick exteriors, interiors and landscaping options can increase sustainability that also helps earn LEED certification.

| Oct 5, 2011

GREENBUILD 2011: Roof hatch designed for energy efficiency

The cover features a specially designed EPDM finger-type gasket that ensures a positive seal with the curb to reduce air permeability and ensure energy performance. 

| Oct 4, 2011

GREENBUILD 2011

Click here for the latest news and products from Greenbuild 2011, Oct. 4-7, in Toronto.

| Oct 4, 2011

GREENBUILD 2011: Methods, impacts, and opportunities in the concrete building life cycle

Researchers at the Massachusetts Institute of Technology’s (MIT) Concrete Sustainability Hub conducted a life-cycle assessment (LCA) study to evaluate and improve the environmental impact and study how the “dual use” aspect of concrete.

| Oct 4, 2011

GREENBUILD 2011: Johnsonite features sustainable products

Products include rubber flooring tiles, treads, wall bases, and more. 

| Oct 4, 2011

GREENBUILD 2011: Nearly seamless highly insulated glass curtain-wall system introduced

Low insulation value reflects value of entire curtain-wall system. 

| Oct 4, 2011

GREENBUILD 2011: Ready-to-use wood primer unveiled

Maintains strong UV protection, clarity even with application of lighter, natural wood tones.

| Oct 4, 2011

GREENBUILD 2011: Two new recycled glass products announced

The two collections offer both larger and smaller particulates. 

| Oct 4, 2011

GREENBUILD 2011: Mythic Paint launches two new paint products

A high performance paint, and a combination paint and primer now available. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â