flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

WorkingBuildings acquires Specialty Operations Solutions

WorkingBuildings acquires Specialty Operations Solutions


By WorkingBuildings | June 13, 2013

The WorkingBuildings Companies, a leading provider of comprehensive Owner-based solutions for the built environment, announces the acquisition of Specialty Operations Solutions (SOS), a national provider of research and laboratory services. This addition to the firm strengthens The WorkingBuildings Companies’ position as one of the fastest-growing comprehensive professional services firm in the world and expands their existing service offerings.

The WorkingBuildings Companies features six specialized divisions of service dedicated to providing facility Owner’s with quality processes for the built environment. These six divisions include WorkingBuildings, WorkingHospitals, WorkingLaboratories, WB | Global Advisory, CxAlloy, and now, SOS. Each branch works to define success for projects and to address inconsistencies when bringing complex facilities online, and SOS specifically adds medical products to market. The services our branches provide result in a facility with fewer operational issues and less expense, both during the design and construction phase and throughout the operational lifespan.

President and CEO of WorkingBuildings, Michael Weiss, says of the acquisition, “SOS fits in seamlessly with the goals of The WorkingBuildings Companies. The addition of this highly respected group of doctors, scientists, engineers, and technicians to the WorkingBuildings team will provide great value to our clients. We will be able to provide owners with a truly turnkey research or manufacturing laboratory that is assured to operate efficiently, to meet all the mandatory requirements, and to achieve FDA compliance. We can now accomplish this while simultaneously reducing the construction and operational cost. Our expanded service offerings give WorkingBuildings greater depth and capabilities while providing consistency typically not found in the marketplace. We are very excited about the possibilities this new addition brings.”

With this new division, The WorkingBuildings Companies is able to assist their clients with turnkey services for CGMP laboratory facilities and manufacturing facilities and GTP laboratory and manufacturing facilities for products designed to treat a variety of human and animal diseases and injuries.  The SOS staff is particularly experienced with cell and tissue therapies, regenerative medicine products, cord blood banking and processing, USP 797and 823 dispensing facilities, and in the specific facility and process needs required for new and emerging therapies and devices.  SOS’ services include but are not limited to detailed basis of design document development, facility project management, facility programming, complete quality assurance and regulatory services support, SOP development and training, and research animal care.  The SOS division will focus on the GxP, research animal care, and USP 797/823 markets to provide Owners with a facility and program that will meet stringent FDA, USDA, EMEA, AAALAC-I and State Pharmacy Control Board requirements.

About The WorkingBuildings Companies

WorkingBuildings, LLC is an employee-owned professional service firm specializing in building commissioning, LEED® certification, sustainability consulting, laboratory pre-certification, standard operating procedures for bio-medical facilities, risk/threat mitigation, and CxAlloy Suites software. The company is headquartered in Atlanta, GA with offices located in Albuquerque, Alexandria, Austin, Birmingham, Jackson, New Orleans, New York,, West Trenton, Charlotte and Winston-Salem; and Riyadh (Saudi Arabia). For more information, call 678-990-8001 or visit www.workingbuildings.com.


About Specialty Operations Solutions

Specialty Operations Solutions (SOS) is a professional services firm that works strategically for the Owner to bridge the gap between development and FDA compliance requirements for a CGMP facility or product. For more information, call 678-990-8001 or visit www.specialtyoperations.com

Related Stories

| Oct 13, 2010

County building aims for the sun, shade

The 187,032-sf East County Hall of Justice in Dublin, Calif., will be oriented to take advantage of daylighting, with exterior sunshades preventing unwanted heat gain and glare. The building is targeting LEED Silver. Strong horizontal massing helps both buildings better match their low-rise and residential neighbors.

| Oct 12, 2010

Holton Career and Resource Center, Durham, N.C.

27th Annual Reconstruction Awards—Special Recognition. Early in the current decade, violence within the community of Northeast Central Durham, N.C., escalated to the point where school safety officers at Holton Junior High School feared for their own safety. The school eventually closed and the property sat vacant for five years.

| Oct 12, 2010

Guardian Building, Detroit, Mich.

27th Annual Reconstruction Awards—Special Recognition. The relocation and consolidation of hundreds of employees from seven departments of Wayne County, Mich., into the historic Guardian Building in downtown Detroit is a refreshing tale of smart government planning and clever financial management that will benefit taxpayers in the economically distressed region for years to come.

| Oct 12, 2010

Richmond CenterStage, Richmond, Va.

27th Annual Reconstruction Awards—Bronze Award. The Richmond CenterStage opened in 1928 in the Virginia capital as a grand movie palace named Loew’s Theatre. It was reinvented in 1983 as a performing arts center known as Carpenter Theatre and hobbled along until 2004, when the crumbling venue was mercifully shuttered.

| Oct 12, 2010

University of Toledo, Memorial Field House

27th Annual Reconstruction Awards—Silver Award. Memorial Field House, once the lovely Collegiate Gothic (ca. 1933) centerpiece (along with neighboring University Hall) of the University of Toledo campus, took its share of abuse after a new athletic arena made it redundant, in 1976. The ultimate insult occurred when the ROTC used it as a paintball venue.

| Oct 12, 2010

Owen Hall, Michigan State University, East Lansing, Mich.

27th Annual Reconstruction Awards—Silver Award. Officials at Michigan State University’s East Lansing Campus were concerned that Owen Hall, a mid-20th-century residence facility, was no longer attracting much interest from its target audience, graduate and international students.

| Oct 12, 2010

Gartner Auditorium, Cleveland Museum of Art

27th Annual Reconstruction Awards—Silver Award. Gartner Auditorium was originally designed by Marcel Breuer and completed, in 1971, as part of his Education Wing at the Cleveland Museum of Art. Despite that lofty provenance, the Gartner was never a perfect music venue.

| Oct 12, 2010

Cell and Genome Sciences Building, Farmington, Conn.

27th Annual Reconstruction Awards—Silver Award. Administrators at the University of Connecticut Health Center in Farmington didn’t think much of the 1970s building they planned to turn into the school’s Cell and Genome Sciences Building. It’s not that the former toxicology research facility was in such terrible shape, but the 117,800-sf structure had almost no windows and its interior was dark and chopped up.

| Oct 12, 2010

The Watch Factory, Waltham, Mass.

27th Annual Reconstruction Awards — Gold Award. When the Boston Watch Company opened its factory in 1854 on the banks of the Charles River in Waltham, Mass., the area was far enough away from the dust, dirt, and grime of Boston to safely assemble delicate watch parts.

| Oct 12, 2010

Cuyahoga County Soldiers’ and Sailors’ Monument, Cleveland, Ohio

27th Annual Reconstruction Awards—Gold Award. The Cuyahoga County Soldiers’ and Sailors’ Monument was dedicated on the Fourth of July, 1894, to honor the memory of the more than 9,000 Cuyahoga County veterans of the Civil War.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021