As more customers begin to order food through online channels, a new KFC pilot project in Newcastle, Australia looks to create a more efficient operating model to keep up with this change in consumer behavior.
Designed by FRCH NELSON with KFC SOPAC, the drive-thru only KFC features five lanes, two set up for traditional on-the-spot drive-thru orders, and three that allow customers to order and pay for a meal through the brand’s app or website. For online orders, customers drive up to one of the designated lanes and enter a four-digit code generated by the app on a touchscreen. Once the code is entered, the online order is sent to the kitchen where it is freshly prepared.
The goal of the design was to create a holistic drive-thru experience that leverages architecture, communication, service, and landscape. Without having the benefit of a public-facing interior, FRCH NELSON had to find other opportunities to display and celebrate the KFC brand on the building’s exterior, which leverages natural materials in conjunction with steel and glazing.
See Also: ‘The Whale’ will be an arctic attraction 185 miles north of the Arctic Circle
A large halo-lit Colonel Sanders layered atop the building’s wood-clad walls greets guests and the drive thru portal uses bold architecture to create a beacon for the experience. “With traditional restaurants, the building is the experience, but with this new concept it became a fixture – one element supporting the overall experience,” said Marty McCauley, Design Director at FRCH NELSON, in a release. “We had to utilize every exterior touchpoint from the landscaping, to the signage, to the architecture of the drive-thru portal, to create a holistic experience for guests.”
Related Stories
| Nov 25, 2013
Building Teams need to help owners avoid 'operational stray'
"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.
| Nov 19, 2013
Top 10 green building products for 2014
Assa Abloy's power-over-ethernet access-control locks and Schüco's retrofit façade system are among the products to make BuildingGreen Inc.'s annual Top-10 Green Building Products list.
| Nov 15, 2013
Greenbuild 2013 Report - BD+C Exclusive
The BD+C editorial team brings you this special report on the latest green building trends across nine key market sectors.
| Nov 15, 2013
Metal makes its mark on interior spaces
Beyond its long-standing role as a preferred material for a building’s structure and roof, metal is making its mark on interior spaces as well.
| Nov 13, 2013
Installed capacity of geothermal heat pumps to grow by 150% by 2020, says study
The worldwide installed capacity of GHP systems will reach 127.4 gigawatts-thermal over the next seven years, growth of nearly 150%, according to a recent report from Navigant Research.
| Oct 30, 2013
11 hot BIM/VDC topics for 2013
If you like to geek out on building information modeling and virtual design and construction, you should enjoy this overview of the top BIM/VDC topics.
| Oct 28, 2013
Urban growth doesn’t have to destroy nature—it can work with it
Our collective desire to live in cities has never been stronger. According to the World Health Organization, 60% of the world’s population will live in a city by 2030. As urban populations swell, what people demand from their cities is evolving.
| Oct 25, 2013
$3B Willets Points mixed-use development in New York wins City Council approval
The $3 billion Willets Points plan in New York City that will transform 23 acres into a mixed-use development has gained approval from the City Council.
| Oct 23, 2013
Gehry, Foster join Battersea Power Station redevelopment
Norman Foster and Frank Gehry have been selected to design a retail section within the £8 billion redevelopment of Battersea Power Station in London.
| Oct 18, 2013
Researchers discover tension-fusing properties of metal
When a group of MIT researchers recently discovered that stress can cause metal alloy to fuse rather than break apart, they assumed it must be a mistake. It wasn't. The surprising finding could lead to self-healing materials that repair early damage before it has a chance to spread.