flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The year’s boldest BIM/VDC themes

The year’s boldest BIM/VDC themes

High-speed rendering software, custom APIs, virtual reality tools, and BIM workflow tips were among the hottest BIM/VDC topics in 2014. 


By BD+C Staff | December 8, 2014
Photo: WorldViz
Photo: WorldViz

In today’s tech-driven AEC workplace environment, the only constant, it seems, is change. Firms are scrambling to keep up with the latest BIM/VDC-related tools and are searching for ways to more effectively implement and manage those tools on their projects. There’s a thirst for knowledge of all things BIM.

The following collection of feature stories, case studies, and Web-exclusive content is based on the number of BDCnetwork.com readers who clicked on the article during the past 11 months. For more BIM/VDC articles from BD+C, visit www.BDCnetwork.com/BIMit. 

 

1. “5 tech trends transforming BIM/VDC”

By Jeff Yoders, Contributing Editor, BD+C
As BIM/VDC continues to evolve the work processes of AEC firms, promising technologies are being applied to take 3D coordination to the next level. This report covers five breakthrough ideas: energy modeling on the fly, laser scanning, prefabrication of building systems, advanced data management, and computer-aided manufacturing. www.BDCnetwork.com/BIMtechtrends

 

2. “Hyper-speed rendering: How Gensler turns BIM models into beauty shots in seconds”

By David Barista, Editor-in-Chief, BD+C
The rise of BIM and 3D rendering technology has raised client expectations and placed additional pressure on Building Teams to produce visually striking artwork that accurately depicts the very latest iteration of a project’s design. Turnaround time on artwork has to be in hours, not days or weeks. In search of a fast rendering solution, Gensler looked to the gaming and moviemaking industries for the next breakthrough tool: Octane Render. www.BDCnetwork.com/Octane

 

3. “7 ways to cut waste in BIM implementation”

By David Barista, BD+C
More than two decades into the building information modeling movement, AEC firms are still discovering ways to utilize BIM/VDC tools more effectively. One major current area of focus is how to cut waste in the BIM implementation process. In this report, several BIM/VDC power users offer their top tips for eliminating waste in BIM/VDC workflows. www.BDCnetwork.com/BIMworkflow

 

4. “Firms enhance BIM/VDC with advanced collaboration tools”

By David Barista, BD+C
A special to the BD+C Giants 300 report, this article highlights BIM/VDC innovations by the nation’s largest AEC firms, including SOM, Stantec, and Thornton Tomasetti. Among the breakthrough ideas featured: cloud-based data sharing, rapid iterative design, and cross-discipline collaboration. www.BDCnetwork.com/BIMGiants2014

 

5. “Super BIM: 7 award-winning BIM/VDC-driven projects”

By AIA Technology in Architectural Practice Knowledge Community
Thom Mayne’s Perot Museum of Nature and Science in Dallas and the Anaheim (Calif.) Regional Transportation Intermodal Center were among the seven projects named 2014 AIA TAP BIM Award winners by the AIA’s Technology in Architectural Practice (TAP) Knowledge Community. This slideshow recaps the winning projects. www.BDCnetwork.com/SuperBIM 

 

6. “Perfecting prefab: 8 tips for healthcare construction projects”

By David Barista, BD+C
Healthcare projects across the U.S. are being built in record time, thanks, in part, to the implementation of advanced multi-trade prefabrication techniques. By assembling components like MEP infrastructure, headwalls, and bathrooms offsite in a controlled environment, Building Teams are able to compress project schedules by performing multiple construction activities in parallel. This report offers helpful advice for using BIM to pull off prefabrication. www.BDCnetwork.com/BIMprefab

 

7. “Total immersion: Has virtual reality’s time finally come?”

By David Barista, BD+C
Virtual reality technology is a natural fit for the AEC industry. Many firms are already building highly detailed BIM/VDC models of their most complex projects, so VR looks like the logical next step. But, as our experts reveal, pulling off VR is not so simple. www.BDCnetwork.com/VR2014

 

8. “5 ways virtual modeling can improve facilities management”

By Jennifer Macks, Vice President, Skanska USA
BIM has become standard practice for design and construction, but often little attention is paid to what happens to model data post-construction. This blog post details practical applications for BIM/VDC tools for the operation and maintenance of buildings, including space management, maintenance scheduling, and retrofit planning. www.BDCnetwork.com/BIMom

 

9. “How architects at NBBJ are using computational design to calculate the best views on projects”

By Andrew Heumann, Computational Design Specialist, NBBJ
In an ideal world, every employee would have a beautiful view from his or her desk. Using computational design, architects like NBBJ can help building owners, developers, and tenants maximize views from every angle and position within a tower. In this video, NBBJ’s Andrew Heumann demonstrates a custom computational design tool the firm is using to improve views on a Seattle high-rise project. www.BDCnetwork.com/BIMviews

Related Stories

| Dec 16, 2011

Goody Clancy-designed Informatics Building dedicated at Northern Kentucky University

The sustainable building solution, built for approximately $255-sf, features innovative materials and intelligent building systems that align with the mission of integration and collaboration. 

| Dec 16, 2011

Stalco Construction converts Babylon, N.Y. Town Hall into history museum

The project converted the landmark structure listed on the National Register of Historic Places into the Town of Babylon History Museum at Old Town Hall.

| Dec 14, 2011

Belfer Research Building tops out in New York

Hundreds of construction trades people celebrate reaching the top of concrete structure for facility that will accelerate treatments and cures at world-renowned institution.

| Dec 14, 2011

Tyler Junior College and Sika Sarnafil team up to save energy

Tyler Junior College wanted a roofing system that wouldn’t need any attention for a long time.

| Dec 13, 2011

Lutron’s Commercial Experience Center awarded LEED Gold

LEED certification of the Lutron facility was based on a number of green design and construction features that positively impact the project itself and the broader community. These features include: optimization of energy performance through the use of lighting power, lighting controls and HVAC, plus the use of daylight.

| Dec 12, 2011

AIA Chicago announces Skidmore, Owings & Merrill as 2011 Firm of the Year

SOM has been a leader in the research and development of specialized technologies, new processes and innovative ideas, many of which have had a palpable and lasting impact on the design profession and the physical environment. 

| Dec 12, 2011

Skanska to expand and renovate hospital in Georgia for $103 Million

The expansion includes a four-story, 17,500 square meters clinical services building and a five-story, 15,700 square meters, medical office building. Skanska will also renovate the main hospital.

| Dec 12, 2011

CRSI design awards deadline extended to December 31

The final deadline is extended until December 31st, with judging shortly thereafter at the World of Concrete.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021