flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ZGF unveils latest renderings of Portland International Airport’s main terminal

Airports

ZGF unveils latest renderings of Portland International Airport’s main terminal

An undulating wooden roof highlights the project.


By David Malone, Associate Editor | June 9, 2021
PDX exterior main terminal

Renderings courtesy ZGF

ZGF has recently unveiled new renderings of Portland International Airport’s (PDX) main terminal. The project’s design will celebrate the beauty of the Pacific Northwest.

The project will double the existing footprint and create capacity for 35 million passengers by 2045. The new design will invite both passengers and airport employees to “take a walk in the forest.” Interior landscaping, biophilic strategies, and sustainable materials will create moments of “surprise and joy” meant to relieve stress. This forest-like area is referred to as the “seam,” as it will mark the path from the ticket lobby to the public market and security checkpoints.

 

PDX main terminal interior

 

A wooden roof recalls the state’s history of forest product innovation with regionally and sustainably sourced wood. The curved shape of the roof is penetrated by Y-shaped columns to allow natural variation in daylight reminiscent of sunlight filtering through a forest canopy.

A phasing strategy will ensure that while expanding to the west and creating more space for travelers, PDX will remain fully operational during all stages of construction. The terminal is slated to open in 2025.

 

PDX main terminal undulating roof

 

pdx main terminal interior

 

pdx main terminal windows

Tags

Related Stories

Airports | May 20, 2019

How the Internet of Things will transform airport environments

Connected devices and their wealth of data have led to significant improvements in operational efficiency and passenger experience in airports.

Hotel Facilities | May 16, 2019

JFK’s TWA Flight Center has been reimagined as a hotel

MCR and Morse Development spearheaded the project.

Airports | May 9, 2019

Paine Field-Snohomish County Airport’s new terminal culminates early plan

$40 million redevelopment brands hub as true boutique airport.

Airports | May 1, 2019

The Ilan and Asaf Ramon International Airport opens in Israel’s Negev Desert

Amir Mann-Ami Shinar Architects and Planners designed the facility in partnership with Moshe Zur Architects.

Airports | Apr 1, 2019

Home team wins O’Hare terminal design competition

Studio ORD, which includes Chicago-based Studio Gang, is chosen from five finalists.

Airports | Mar 21, 2019

First photos inside the nearly completed Jewel Changi Airport addition

The addition is set to open this spring.   

Airports | Feb 28, 2019

Renovation of Tampa International Airport’s Main Terminal completes

Skanska and HOK led the design-build team.

Airports | Feb 26, 2019

Design team unveils Terminal Modernization Program at Pittsburgh International Airport

The terminal’s design philosophy combines nature, technology, and community.

Airports | Feb 21, 2019

Self-service bag drops and the challenges of speeding up airport baggage check-in

More airports are asking passengers to check their own baggage. What’s the ripple effect?

Airports | Feb 10, 2019

Chicago searches for the right design to expand O’Hare Airport and make passenger connections less stressful

Competition finalists took different approaches to rethinking the logistics of a gigantic, hectic space.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021